§ 16-127 — Land disturbance plan requirements
Code of Ordinances of the Town of Fort Mill, South Carolina (Codified through Ordinance No. 13-21, enacted July 22, 2013. (Supp. No. 9)) · Fort Mill Code of Ordinances § 16-127
Corpus is an independent public-information project, not the official City of Fort Mill website. Stable reference: corpuslaw.us/code/a56b6173-5324-4be4-bb9d-b7c89bf77eb4
Sec. 16-127. - Land disturbance plan requirements.
(a) Land disturbance plans shall be prepared in accordance with the applicable requirements of R.72-307, the Town of Fort Mill Type I and Type II Land Disturbance Permit Application, as amended to date, and include details pertaining to the location of the site drainage features, the erosion control measures proposed, site drainage features, permanent water quality, vegetative stabilization, construction waste removal and additional information necessary for a complete review as deemed appropriate by the Town of Fort Mill. (b) Land disturbance plans shall include designation of all easements needed for inspection and maintenance of the drainage system and stormwater management facilities. As a minimum, easements shall have the following characteristics. (1) Provide adequate access to all portions of the drainage system and structures. (2) Provide sufficient land area for maintenance equipment and personnel to adequately and efficiently maintain the system with a minimum of ten feet along both sides of all drainage ways, streams, channels, ditches, and around the perimeter of all detention and retention facilities, or sufficient land area for equipment access for maintenance of all stormwater management facilities. This distance shall be measured from the top of the bank or toe of the dam whichever is applicable. (3) Restriction on easements shall include prohibiting all fences and structures which would interfere with access to the easement areas and/or the maintenance function of the drainage system. (c) To prevent water quality degradation and to improve the water quality aspects of the drainage system, the disturbance plan shall include best management practices to control the water quality of the runoff during the land disturbing activities and during the life of the development. The disturbance plan shall include all engineering calculations needed to design the system and associated structures including pre- and post-development velocities. Peak rates of discharge, and inflow and outflow hydro-graphs of stormwater runoff at all existing and proposed points of discharge from the site. These results of the analysis shall be included in a hydrologic-hydraulic study included with the application package and shall included but not be limited to the following: (1) All stormwater management facilities and all major portions of the conveyance system through the proposed development (i.e., channels, culverts) shall be analyzed, using the design and 100-year storms, for design conditions and operating conditions which can reasonably be expected during the life of the facility. (2) For all stormwater management facilities, a hydrologic-hydraulic study shall be done showing how the drainage system will function with and without the proposed facilities. For such studies the following land use conditions shall be used. Existing land use data shall be taken from the most recent aerial photograph and field checked and updated. • For the design of the facility outlet structure, use developed land use conditions for the area within the proposed development and existing land use conditions for upstream areas draining to the facility. • For any analysis of flood flows downstream from the proposed facility, use existing land use conditions for all downstream areas. • All stormwater management facilities emergency spillways shall be checked using the 100-year storm and routing flows through the facility and emergency spillways. For this analysis, developed land use conditions shall be used for all areas within the analysis. • The effects of existing upstream detention facilities can be considered in the hydrologic-hydraulic study. (3) The expected timing of flood peaks through the downstream drainage system shall be assessed when planning the use of detention facilities. (4) In determining downstream effects from stormwater management structures and the development, hydrologic-hydraulic engineering studies shall extend downstream to a point as determined by the stormwater manager. (5) If the land disturbance plan and/or design report indicates that there may be a drainage or flooding problem at the exit to the proposed development or at any point downstream as determined by the stormwater manager, the stormwater manager may require: • Water surface profiles plotted for the conditions of pre- and post-development for the two-year through 100-year design storm; and • Elevations of all structures potentially damaged by the 2-year through 100-year flows. (d) All land disturbance plans must outline requirements for construction site operators to implement appropriate erosion and sediment control BMPs and to control waste at construction sites that may cause adverse impacts to water quality. Such waste includes material delivery sites, discarded building materials, concrete truck washouts, chemicals, litter and sanitary waste. All materials are to be disposed of in accordance with OHSA/DHEC guidelines for storage of hazardous materials and disposal of waste. (e) All land disturbance plans submitted for approval shall contain certification by the person responsible for the land disturbing activity that the land disturbing activity will be accomplished pursuant to the approved plan and that responsible personnel will be assigned to the project. Any and all site land disturbance permits may be revoked at any time if the construction of stormwater management facilities is not in strict accordance with approved plans. (f) All land disturbance plans shall contain certification by the person responsible for the land disturbing activity of the right of the stormwater manager to conduct on-site inspections.
(Ord. No. 07-13, § 3.8, 9-10-07)
Ask a question about Fort Mill law
Corpus searches the Fort Mill sections it holds and shows the ones that match, with their citations. Free, no sign-in.