For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 16-130 — Maintenance, construction and inspection

Code of Ordinances of the Town of Fort Mill, South Carolina (Codified through Ordinance No. 13-21, enacted July 22, 2013. (Supp. No. 9)) · Fort Mill Code of Ordinances § 16-130

Corpus is an independent public-information project, not the official City of Fort Mill website. Stable reference: corpuslaw.us/code/0b666849-624a-4df6-b98c-e20677e4de32

Sec. 16-130. - Maintenance, construction and inspection.

(a) Inspections and inspection programs by the Town of Fort Mill may be conducted or established on any reasonable basis, including but not limited to routine inspections; random inspections; inspections based upon complaints or other notice of possible violations; and joint inspections with other agencies inspecting under environmental or safety laws. Inspections may include, but are not limited to, reviewing maintenance and repair records; sampling discharges, surface water, groundwater, and material or water in BMPs; and evaluating the condition of BMPs. (b) If the owner or occupant of any property refuses to permit such inspection, the stormwater manager shall proceed to obtain an administrative search warrant pursuant to South Carolina Law or its successor. No person shall obstruct, hamper or interfere with the stormwater manager (or his or her designee) while carrying out his or her official duties. (c) A permanent maintenance plan for each stormwater management facility shall be included in the disturbance plan. As part of the maintenance plan, the owner of such facility shall specifically agree to be responsible for permanent maintenance. In order to transfer maintenance responsibility, a letter of acceptance by the entity accepting permanent maintenance responsibility shall be filed with the stormwater manager. (d) Prior to the approval of the disturbance plan, the applicant shall submit a proposed staged construction and inspection control schedule. This plan shall indicate a phase line for approval otherwise the construction and inspection control schedule will be for the entire drainage system. (e) No stage work, related to the construction of stormwater management facilities, shall proceed until the next preceding stage of work, according to the sequence specified in the approved staged construction and inspection control schedule, is inspected and approved. (f) The permittee shall notify the stormwater manager before commencing any work to implement the disturbance plan and upon completion of the work. (g) The permittee shall provide record drawings certified by a registered professional engineer to be submitted upon the completion of the stormwater management facilities included in the disturbance plan. The registered professional engineer/landscape architect/tier B land surveyor shall certify that: (1) The facilities have been constructed as shown on the approved plan, and (2) The facilities meet the approved disturbance plan and specifications or achieves the function for which they were designed. (h) Acceptable record plans shall be submitted prior to: (1) The use or occupancy of any commercial or industrial site. (2) Final acceptance of any road for maintenance by the Town of Fort Mill. (3) Release of any bond held by the town. (4) Approval and/or acceptance for recording of map, plat or drawing, the intent of which is to cause a division of a single parcel of land into two or more parcels. (5) A final inspection shall be conducted by the stormwater manager upon completion of the work included in the approved disturbance plan to determine if the completed work is constructed in accordance with the plan.

(Ord. No. 07-13, § 3.14, 9-10-07)

Ask a question about Fort Mill law

Corpus searches the Fort Mill sections it holds and shows the ones that match, with their citations. Free, no sign-in.