§ 16-128 — Minimum design requirements
Code of Ordinances of the Town of Fort Mill, South Carolina (Codified through Ordinance No. 13-21, enacted July 22, 2013. (Supp. No. 9)) · Fort Mill Code of Ordinances § 16-128
Corpus is an independent public-information project, not the official City of Fort Mill website. Stable reference: corpuslaw.us/code/e545eddd-2188-49fb-a7df-153c5c8d00f4
Sec. 16-128. - Minimum design requirements.
Provisions for stormwater runoff control during the land disturbing activity and during the life of the facility shall meet the minimum requirements: (a) Post development peak discharge rates shall not exceed pre-development discharge rates for the two- and ten-year frequency 24-hour duration storm events. (b) The requirements, or portions thereof, of item (a) may be waived by the stormwater manager if it can be shown by detailed engineering calculations and analysis which are acceptable to the stormwater manager that one of the following exists: (1) The installation of stormwater management facilities would have insignificant effects on reducing downstream flood peaks; or (2) Stormwater management facilities are not needed to protect downstream developments and the downstream drainage system has sufficient capacity to receive any increase in runoff for the design storm; or (3) It is not necessary to install stormwater management facilities to control developed peak discharge rates at the exit to a proposed development and installing such facilities would increase flood peaks at some downstream locations; or (4) The stormwater manager determines that stormwater management facilities are not needed to control developed peak discharge rates and installing such facilities would not be in the best interest of water quality. (c) The requirements, or portions thereof, of item (a) may not be waived if the stormwater manager determines that not controlling downstream flood peaks would increase known flooding problems, or exceed the capacity of the downstream drainage system. (d) A waiver shall only be granted after a written request is submitted by the applicant containing descriptions, drawings, and any other information that is necessary to evaluate the proposed land disturbing activity. A separate written waiver request shall be required if there are subsequent additions, extensions, or modifications that would alter the approved stormwater runoff characteristics to a land disturbing activity receiving a waiver. The stormwater manager will conduct a review of the request for a waiver within 20 business days from receipt of the waiver. Failure of the stormwater manager to act by the end of the 20th business day will result in the automatic approval of the waiver. (e) Off-site discharges of closed storm sewers or improve open channels will be permitted only at natural streams or man-made drainage channels. Discharge velocities shall be reduced to provide a non-erosive velocity flow from a structure, channel, or other control measure or the velocity of the ten-year 24-hour storm runoff in the receiving waterway prior to the land disturbing activity, whichever is greater. (f) Design criteria for channel modification will be as followed: (1) Open channels. Open channels shall be provided with an improved cross section that will carry the runoff from the appropriate design rainfall and preclude the creation of backwater inundation of any area outside dedicated drainage easements. (2) Closed storm sewer and culverts. Closed storm sewers and culverts shall be constructed of prefabricated pipe or box design, in conformance with standards adopted by the Town of Fort Mill. They shall be sized to carry the runoff from the appropriate design rainfall and to preclude the creation of backwater inundation of any area outside dedicated drainage easements. (g) When work in a live waterway is performed, precautions shall be taken to minimize encroachment, to control sediment transport, and to stabilize the work area to the greatest extent possible during construction. (h) Vehicle tracking of sediments from land disturbing activities onto paved roads shall be minimized and cleaned up daily. (i) The stormwater management and sediment control plan shall not be implemented until all federal and state permits regarding wetlands management have been obtained. (j) Ease of maintenance must be considered as a site design component. Access to the stormwater management structure must be provided. (k) Sediment basins and traps shall be designed to achieve an 80 percent efficiency in removing suspended solids from the discharge effluent from a site or 0.5 ML/L peak settable solids concentration, whichever is less. The efficiency shall be calculated for disturbed conditions for the ten-year and 24- hour design storm. (l) Stormwater runoff and drainage to a single outlet from land disturbing activities which disturb ten acres or more shall be controlled during the land disturbing activity by a sediment basin where sufficient space and other factors allow these controls to be used until the final inspection. The outfall device or system design shall take into account the total drainage area flowing through the disturbed area to be served by the basin. (m) A regional approach to stormwater management is an acceptable alternative to site specific requirements and is encouraged. (n) Mosquito control. All stormwater management and sediment control practices shall be designed, constructed and maintained with consideration for the proper control for mosquitoes and other vectors. These requirements shall be part of the required inspection and maintenance agreement, and include, but are not limited to: (1) The bottom of retention and detention ponds should be graded and have a slope not less than 0.5 percent. There should be no depressions in a normally dry detention facility where water might pocket when the water level is receding. (2) Normally dry swales and detention pond bottoms should be utilized in permanently wet structures to prevent an overgrowth of vegetation in the pond. Manual harvesting is preferred. (3) Fish may be stocked in permanently wet retention and detention ponds. (4) Normally dry swales and detention pond bottoms should be constructed with a gravel blanket or other measures to minimize the creation of tire ruts during maintenance activities. (o) Use of ponds. (1) The use of measures other than ponds to achieve water quality improvement is recommended on sites containing less than ten acres. (2) Where ponds are the proposed method of control, the person responsible for the land disturbing activity shall submit to the approving agency, when required, an analysis of the impacts of stormwater flows downstream in the watershed for the ten- and 100-year frequency storm event. The analysis shall included hydrologic and hydraulic timing modifications of the proposed land disturbing activity, with and without the pond. The results of the analysis will determine the need to modify the pond design or to eliminate the pond requirement. If a clearly defined downstream point of constriction is not available, the downstream impacts shall be established with the concurrence of the development services director. (3) When ponds are used for water quality protection, the ponds shall be designed as both quantity and quality control structures. Sediment storage volume shall be calculated considering the clean out and maintenance schedules specified by the designer during the land disturbing activity. Sediment storage volumes may be predicted by the universal soil loss equation. (4) Permanent water quality ponds having a permanent pool shall be designed to store and release the first 0.5 inch of runoff from the site over a 24-hour period. The storage volume shall be designed to accommodate, at least, 0.5 inch of runoff from the entire site. (5) Permanent water quality ponds, not having a permanent pool, shall be designed to release the first inch of runoff from the site over a 24-hour period. (p) Infiltration practices. Infiltration practices have certain limitations on their use on certain sites. These limitations include the following items: (1) Permanent infiltration practices, when used, shall be designed to accept, at a minimum, the first inch of runoff from all impervious surfaces. (2) Areas draining to these practices must be stabilized and vegetative filters established prior to runoff entering system. Infiltration practices shall not be used if a suspended solids filter system does not accompany the practice. If vegetation is the intended filter, there shall be, at least a 20-foot length of vegetative filter prior to stormwater runoff entering the infiltration practice; (3) The bottom of the infiltration practice shall be at least 0.5 feet above the seasonal high water table, whether perched or regional, determined by direct piezometer measurements which can be demonstrated to be representative of the maximum height of the water table on an annual basis during years of normal precipitation, or by the depth in the soil at which mottling first occurs; (4) The infiltration practice shall be designed to completely drain water within 72 hours; (5) Soils must have adequate permeability to allow water to infiltrate. Infiltration practices are limited to soils having an infiltration rate of at least 0.3 inches per hour. Initial consideration will be based on a review of the appropriate soil survey, and the survey may serve as a basis for rejection. On-site soil borings and textural classifications must be accomplished to verify the actual site and seasonal high water table conditions when infiltration is to be utilized; (6) Infiltration practices greater than three feet deep shall be located at least ten feet from basement walls; (7) Infiltration practices designed to handle runoff from impervious parking areas shall be a minimum of 150 feet from any public or private water supply well; (8) The design of an infiltration practice shall provide an overflow system with measures to provide a non-erosive velocity of flow along its length and at the outfall; (9) The slope of the bottom of the infiltration practice shall not exceed five percent. Also, the practice shall not be installed in fill material as piping along the fill/natural ground interface may cause slope failure; (10) An infiltration practice shall not be installed on or atop a slope whose natural angle of incline exceeds 20 percent. (11) Provide cleanouts at minimum of every 100 feet along the infiltration practice to allow for access and maintenance. (q) Where detention and retention structures are used, designs which consolidate these facilities into a limited number of large structures will be preferred over designs which utilize a large number of small structures. (r) Stormwater management facilities may include both structural and non-structural elements. Natural swales and other natural runoff conduits shall be retained where practicable. (s) Land disturbance plans may be rejected by the stormwater manager if they incorporate structures and facilities that will demand considerable maintenance, will be difficult to maintain, or utilize numerous small structures if other alternatives are physically possible. (t) Discharge velocities shall be reduced to provide a nonerosive velocity flow from a structure, channel, or other control measure or the velocity of the two-year 24-hour design storm runoff in the receiving waterway prior to the land disturbing activity, whichever is greater.
(Ord. No. 07-13, § 3.8, 9-10-07)
Ask a question about Fort Mill law
Corpus searches the Fort Mill sections it holds and shows the ones that match, with their citations. Free, no sign-in.
