§ 2.4.7.3 — Requirements
Code of Ordinances of the City of Abilene, Texas (Supp. No. 15: codified through Ordinance No. 85-2026, enacted September 24, 2026) · Abilene Code of Ordinances § 2.4.7.3
Corpus is an independent public-information project, not the official City of Abilene website. Stable reference: corpuslaw.us/code/c9801148-2d66-4e96-bc99-52210074d3a3
Section 2.4.7.3 - Requirements
a. WEC Systems Allowed with Building Permit (By Right): One SWEC system per lot shall be allowed with the approval of a building permit as an accessory use when ALL of the following apply: (1) When a SWEC system is certified by the Small Wind Certification Council (SWCC) for noise generation of no more than 45 decibels (Db) when the wind energy turbine/generator will be less than 300' from an adjacent property or no more than 50 decibels (Db) if 300' or greater. (2) When a SWEC system is setback a minimum of 105% of the fall radius from any habitable structure, right-of-way, overhead utility line or other tower structure. (3) When a SWEC system is located outside of any floodplain or drainage way. b. Wind energy conversion systems not qualifying under 2.4.7.3.a (above) shall require a Special Exception. c. Minimum Lot Size: There shall be no minimum lot size required for a small wind energy conversion system (SWECS). Large wind energy systems (LWECS) shall be located on a lot having a minimum lot size of five (5.0) acres. d. Application Requirements: An accurately drawn-to-scale survey/site plan is required with a Special Exception application and shall include the following: (1) Applicant, landowner and operator name, address and telephone number, (2) Property lines and physical dimensions of the property, (3) Location, dimensions, setbacks and types of existing major structures on the property, (4) Location of the proposed wind system tower, and setbacks/dimensions from all existing structures on site, from all property lines, and from structures on adjacent properties, (5) Locations and dimensions/setbacks from all public rights-of-way that are contiguous with the property, (6) Overhead utility lines, and approximate locations/canopy coverage of large existing trees on the property, (7) Wind system specifications, including manufacturer and model, rotor diameter, tower height, tower type, rated kW output, noise certifications from SWCC or, an equivalent manufacturer's noise certification detailing the unit's noise performance at various operating speeds, (8) Tower foundation blueprints or drawings, (9) Tower blueprint or drawing, (10) Elevation drawings showing the design and height of the proposed energy system, and any screening that will be provided to screen the system/tower from public view. e. Floodplain. Wind towers and generators proposed to be installed within the 100-year floodplain shall also have approval of the City's Engineer and, where applicable, the U.S. Army Corps of Engineers. Such tower sites shall take such measures, as required by the City's Engineer, to protect the sites from damage from potential flooding. The City's Engineer shall require a floodplain permit and a licensed engineer's certification that the tower/generator will not pose a threat or safety hazard due to flood conditions. f. Location. No portion of a wind energy system, including the tower, shall be located within any required front, side or rear yard otherwise specified in the Special Exception standards. The tower and all its appurtenances shall be located behind (i.e., not in front of) the main building. No portion of a system may protrude over a property line without acquisition of an easement for the encroachment from the adjacent property owner(s). No portion of a system may protrude over an easement without proper written release from the utility provider or entity that owns or controls such easement. g. Accessory Use. A wind energy system may exist only as an accessory use, and it may not be constructed/installed until a primary structure exists on a property. A wind energy system may only supply power to structures on the lot/parcel where the system is located. This provision is not intended to prevent "net metering" or "aggregate billing" whereby a property owner feeds energy back into the grid and receives a credit or compensation for said production. h. Height. For property sizes less than or equal to five (5.0) acres in area, the tower height shall be a maximum of sixty-five (65.0) feet. For property sizes greater than five (5.0) acres in area, the tower height shall not exceed one hundred (100.0) feet. Blade clearance shall be a minimum of twenty (20.0) feet above the ground. i. Wind energy conversion systems must comply with applicable Federal Aviation Administration (FAA) regulations, including any necessary approvals for installations close to airports, the City's Airport Zoning regulations in Section 2.4.5.1 [2.3.5.1], and must also comply with applicable ASHTO engineering standards. j. Controls and Brakes. (1) All wind energy conversion systems shall be designed with an automatic over speed control to render the system inoperable when winds are blowing in excess of the speeds for which the machine is designed. (2) All wind energy conversions systems shall have a manually operable or electrically dynamic method to render the system inoperable in the event of a structural or mechanical failure of any part of the system including the automatic over speed control. k. Safety and Security Measures. (1) A clearly visible warning sign that states "Caution, High Voltage" must be placed at the base of all pad-mounted transformers and substations. (2) All ground-mounted electrical and control equipment shall be labeled and secured to prevent unauthorized access. (3) The tower shall be designed and installed so as to not provide step bolts or a ladder readily accessible to the public for a minimum height of 12 feet from the ground. (4) All towers shall be of a monopole design without lattice work or guy wires. (5) All access doors to wind energy systems and their appurtenances (e.g., cabinets, junction boxes, etc.) shall be locked or fenced, as appropriate, to prevent entry by non-authorized persons. (6) All electrical wires associated with a wind energy system, other than wires necessary to connect the wind generator to the tower wiring, the tower wiring to the disconnect junction box, and the grounding wires shall be located underground. l. Noise and Vibration. Except during short term events such as severe storms, power outages and severe wind events, wind energy conversion systems shall be required to comply with Performance Standards and requirements contained within the City's Land Development Code, Chapter 4, Division 9. m. Visual Appearance. (1) A wind tower and generator shall not be artificially lighted unless such lighting is required by the Federal Aviation Administration. (2) The wind tower and generator shall remain painted or finished in the neutral white, light grey or silver non-reflective color applied by the manufacturer. Refurbished blades and parts must meet the manufacturer's specifications as applicable. (3) All signs, other than the manufacturer's or installer's identification, appropriate warning signs, or owner identification on a wind generator, tower, building, or other structure associated with a wind energy system, shall be prohibited. Such signs as described above shall be no larger than four (4.0) square feet in size, and shall be located near the base of the tower. (4) No flags, pennants, banners or similar materials may be displayed on or attached to any portion of a wind energy system, including its tower. n. Nuisance Prevention. (1) Shadow Flicker and Blade Glint. Wind energy systems shall be sited, to the greatest extent practical, to minimize the impact of shadow flicker or blade glint upon any inhabited structures (except for the owner's) or public roadways. Systems found to be a nuisance or a traffic hazard shall be shut down until the flicker or glint problem is remedied. (2) Signal Interference. Wind energy systems shall comply with all applicable Federal Communications Commission (FCC) rules, and shall not cause static noise interference with other individuals' television reception or with private or public telecommunications (e.g., public safety communications, 911 dispatch, etc.). o. Roof-Mounted System. No wind energy system shall be placed or constructed on the roof of any existing structure unless such structure is/was designed and constructed to structurally accommodate and support a roof-mounted wind energy system. Certification by a structural engineer shall be required for any roof-mounted system. No roof-mounted WEC shall exceed a maximum tower height of sixty-five (65.0) feet, as measured from the lowest ground level elevation point of the structure or when applicable, 25' above the building roofline when the building exceeds 40' in height.
(Ord. No. 8-2010, pt. 1(Exh. A), 4-22-10; Ord. No. 12-2010, pt. A (Exh. A), 6-10-10; Ord. No. 8-2012, pt. 1(Exh. A), 1-12-12)
Ask a question about Abilene law
Corpus searches the Abilene sections it holds and shows the ones that match, with their citations. Free, no sign-in.