§ 2.4.7.5 — Maintenance and Abandonment
Code of Ordinances of the City of Abilene, Texas (Supp. No. 15: codified through Ordinance No. 85-2026, enacted September 24, 2026) · Abilene Code of Ordinances § 2.4.7.5
Corpus is an independent public-information project, not the official City of Abilene website. Stable reference: corpuslaw.us/code/c97eb9d2-ca24-4349-83bf-8fb775ddabc5
Section 2.4.7.5 - Maintenance and Abandonment
a. Required Maintenance. The owner and operator of a wind energy unit must maintain the unit to manufacturer's standards at all times and ensure the unit complies with City's performance measures for noise, structural integrity and other performance standards. All required periodic maintenance must be performed as recommended by the manufacturer. b. Abandonment. (1) A wind energy system that is out-of-service for a continuous 6-month (i.e., 180 calendar days) period will be deemed to be abandoned. Nonfunction or lack of operation may be proven by reports from the interconnected utility or other site related information. The owner/operator and successors shall make available to the administrative officer all reports to and from the purchaser of energy from the wind energy conversion system if requested. The Building Official (or designee) shall issue a written notice to the owner(s) of a wind energy system that is deemed to have been abandoned. The owner(s) shall have the right to respond to the notice within 30 calendar days from the date it was mailed to the owner. The Building Official (or designee) shall cease abandonment proceedings if within 30 days the owner provides sufficient information in writing demonstrating the wind energy system has not been abandoned, that it is operational, and that it is in compliance with the City's regulations for WECs. (2) If the wind energy system is determined to be abandoned, the owner of the wind energy system shall remove the wind generator and tower structure (including all its appurtenances) from the property at the owner's sole expense within 120 calendar days after the notice of abandonment has been sent to the owner. If the owner fails to completely remove the wind generator, tower and any associated appurtenances, the Building Official (or designee) may pursue a legal action to have the wind generator and tower structure removed at the owner's expense. Failure to remove an abandoned wind energy system shall be a violation of this ordinance with each day being considered a separate offence. (3) Right of Entrance: By the acceptance of a special exception or building permit the owner/operator grants permission to the City of Abilene to enter the property to remove the wind energy conversion system pursuant to the terms of the special exception and to assure compliance with the other conditions set forth in the permit.
(Ord. No. 8-2010, pt. 1(Exh. A), 4-22-10; Ord. No. 8-2012, pt. 1(Exh. A), 1-12-12)
Ask a question about Abilene law
Corpus searches the Abilene sections it holds and shows the ones that match, with their citations. Free, no sign-in.
