§ 32-61 — Wastewater discharge permit issuance
Code of Ordinances of the City of Abilene, Texas (Supp. No. 15: codified through Ordinance No. 85-2026, enacted September 24, 2026) · Abilene Code of Ordinances § 32-61
Corpus is an independent public-information project, not the official City of Abilene website. Stable reference: corpuslaw.us/code/94cf8f85-873a-453a-9cff-17a57c548d71
Sec. 32-61. - Wastewater discharge permit issuance.
(a) Wastewater discharge permit duration. A wastewater discharge permit shall be issued for a specified time period, not to exceed five (5) years from the effective date of the permit. A wastewater discharge permit may be issued for a period less than five (5) years, at the discretion of the Director. Each wastewater discharge permit will indicate a specific date upon which it will expire. (b) Wastewater discharge permit contents. A wastewater discharge permit shall include such conditions as are deemed reasonably necessary by the Director to prevent pass through or interference, protect the quality of the water body receiving the treatment plant's effluent, protect worker health and safety, facilitate sludge management and disposal, and protect against damage to the POTW. (1) Wastewater discharge permits shall contain the following conditions: a. A statement that indicates wastewater discharge permit issuance date, expiration date, effective date, and duration, which in no event shall exceed five (5) years; b. A statement that the wastewater discharge permit is nontransferable without prior notification to the City in accordance with subsection (e) of this section, and provisions for furnishing the new owner or operator with a copy of the existing wastewater discharge permit; c. Effluent limits, including BMPs, based on applicable pretreatment standards; d. Self-monitoring, sampling, reporting, notification, and recordkeeping requirements. These requirements shall include an identification of pollutants (or BMPs) to be monitored, sampling location, sampling frequency, and sample type based on federal, state, and local law; e. A statement of applicable civil and criminal penalties for violation of pretreatment standards and requirements, and any applicable compliance schedule. Such schedule may not extend the time for compliance beyond that required by applicable federal, state, or local law; and f. Requirements to control slug discharge, if determined by the Director to be necessary. (2) Wastewater discharge permits may contain, but need not be limited to, the following conditions as deemed appropriate by the Director to ensure compliance with this article, and state and federal laws, rules, and regulations. a. Limits on the average and/or maximum rate of discharge, time of discharge, and/or requirements for flow regulation and equalization; b. Requirements for the installation of pretreatment technology, pollution control, or construction of appropriate containment devices, designed to reduce, eliminate, or prevent the introduction of pollutants into the treatment works; c. Requirements for the development and implementation of spill control plans or other special conditions including management practices necessary to adequately prevent accidental, unanticipated, or nonroutine discharges; d. Development and implementation of waste minimization plans to reduce the amount of pollutants discharged to the POTW; e. The unit charge or schedule of user charges and fees for the management of the wastewater discharged to the POTW; f. Requirements for installation and maintenance of inspection and sampling facilities and equipment; g. A statement that compliance with the wastewater discharge permit does not relieve the permittee of responsibility for compliance with all applicable federal and state pretreatment standards, including those which become effective during the term of the wastewater discharge permit; and h. Other conditions as deemed appropriate by the Director to ensure compliance with this article, and state and federal laws, rules, and regulations. (c) Wastewater discharge permit appeals. The Director shall provide public notice of the issuance, modification, or denial of a wastewater discharge permit. Any affected person, including the user, may petition the Director to reconsider the terms of an issued or modified wastewater discharge permit, or the denial of a permit, within thirty (30) days of notice of its issuance, modification, or denial. (1) Failure to submit a timely petition for reconsideration shall be deemed to be a waiver of the administrative appeal. (2) In its petition, the appealing party must indicate the wastewater discharge permit provision(s) objected to, provide a full explanation of the reasons for the objection(s), and identify the alternative condition(s), if any, it seeks to place in the wastewater discharge permit. (3) The effectiveness of the wastewater discharge permit, as issued or modified, shall not be stayed pending the appeal unless the Director expressly so states. (4) The Director shall respond in writing to any petition for reconsideration within sixty (60) days. In his response, the Director shall indicate his decision whether to affirm or modify the terms of any permit issued or modified, or whether upon reconsideration to deny the permit. If the permit was initially denied, the Director shall indicate his decision whether to affirm the initial denial or to vacate the initial denial and issue the permit upon specified terms. The Director's action upon any petition for reconsideration shall be considered final for purposes of any judicial review. (5) If the Director fails to act on any petition for reconsideration within sixty (60) days, the petition for reconsideration shall be deemed to be denied. Such deemed denial shall be considered final administrative action for purposes of judicial review. (6) Aggrieved parties seeking judicial review of the final administrative wastewater discharge permit decision must do so by filing a complaint in a court of competent jurisdiction within the appropriate statute of limitations. (d) Wastewater discharge permit modification. The Director may modify the wastewater discharge permit for good cause including, but not limited to, the following: (1) To incorporate any new or revised federal, state, or local pretreatment standards or requirements; (2) To address significant alterations or additions to the user's operation, processes, or wastewater volume or character since the time of wastewater discharge permit issuance; (3) A change in the POTW that requires either a temporary or permanent reduction or elimination of the authorized discharge; (4) Information indicating that the permitted discharge poses a threat to the City's POTW, City personnel, or the receiving waters; (5) Violation of any terms or conditions of the wastewater discharge permit; (6) Misrepresentations or failure to fully disclose all relevant facts in the wastewater discharge permit application or in any required reporting; (7) Revision of or a grant of variance from categorical pretreatment standards pursuant to 40 CFR 403.13; (8) To correct typographical or other errors in the wastewater discharge permit; (9) To reflect a transfer of the facility ownership or operation to a new owner or operator. (e) Wastewater discharge permit transfer. Wastewater discharge permits may be transferred to a new owner or operator only if the permittee gives at least thirty (30) days advance notice to the Director and the Director approves the wastewater discharge permit transfer. The notice to the Director must include a written certification by the new owner or operator which: (1) States that the owner and/or operator has no immediate intent to change the facility's operations and processes; (2) Identifies the specific date on which the transfer is to occur; and (3) Acknowledges full responsibility for complying with the existing wastewater discharge permit. Failure to provide advance notice of a transfer renders the wastewater discharge permit voidable as of the date of facility transfer. (f) Wastewater discharge permit revocation. (1) Wastewater discharge permits may be revoked for, but not limited to, the following reasons: a. Failure to notify the Director of significant changes to the wastewater prior to the changed discharge; b. Failure to provide prior notification to the Director of changed conditions pursuant to subsection 32-62(e) of this article; c. Misrepresentation or failure to fully disclose all relevant facts in the wastewater discharge permit application; d. Falsifying self-monitoring reports and certification statements; e. Tampering with monitoring equipment; f. Refusing to allow the Director timely access to the facility premises and records; g. Failure to meet effluent limitations; h. Failure to pay fines; i. Failure to pay sewer charges; j. Failure to meet compliance schedules; k. Failure to complete a wastewater survey or the wastewater discharge permit application; l. Failure to provide advance notice of the transfer of business ownership of a permitted facility; or m. Violation of any pretreatment standard or requirement, or any terms of the wastewater discharge permit or this article. (2) A user will be notified of any proposed permit revocation and offered an opportunity to show cause under subsection 32-66(c) of this article why the proposed revocation should not occur. (3) Wastewater discharge permits shall be voidable upon cessation of operations or transfer of business ownership. All wastewater discharge permits issued to a particular user are void upon the issuance of a new wastewater discharge permit to that user. (g) Wastewater discharge permit reissuance. A user with an expiring wastewater discharge permit shall apply for wastewater discharge permit reissuance by submitting a complete permit application, in accordance with subsection 32-60(f) of this article, a minimum of ninety (90) days prior to the expiration of the user's existing wastewater discharge permit. (h) Regulation of waste received from other jurisdictions. (1) If another municipality, or user located within another municipality, contributes wastewater to the POTW, the City Council shall enter into an intermunicipal agreement with the contributing municipality. (2) Prior to entering into an agreement required by subsection (h)(1), above, the Director shall request the following information from the contributing municipality: a. A description of the quality and volume of wastewater discharged to the POTW by the contributing municipality; b. An inventory of all industrial users located within the contributing municipality that are discharging to the POTW; and c. Such other information as the Director may deem necessary. (3) An intermunicipal agreement, as required by subsection (h)(1) above, shall contain the following conditions: a. A requirement for the contributing municipality to adopt a sewer use ordinance which is at least as stringent as this article and local limits including required BMPs, which are at least as stringent as those set out in subsection 32-58(d) of this article. The requirement shall specify that such ordinance and limits must be revised as necessary to reflect changes made to the City's ordinance or local limits; b. A requirement for the contributing municipality to submit a revised industrial user inventory on at least an annual basis; c. A provision specifying which pretreatment implementation activities, including wastewater discharge permit issuance, inspection and sampling, and enforcement, will be conducted by the contributing municipality; which of these activities will be conducted by the Director; and which of these activities will be conducted jointly by the contributing municipality and the Director; d. A requirement for the contributing municipality to provide the Director with access to all information that the contributing municipality obtains as part of its pretreatment activities; e. Limits on the nature, quality, and volume of the contributing municipality's wastewater at the point where it discharges to the POTW; f. Requirements for monitoring the contributing municipality's discharge; g. A provision ensuring the Director access to the facilities of users located within the contributing municipality's jurisdictional boundaries for the purpose of inspection, sampling, and any other duties deemed necessary by the Director; and h. A provision specifying remedies available for breach of the terms of the intermunicipal agreement.
(Ord. No. 36-1992, pt. 1, 9-24-92; Ord. No. 39-2020, pt. 1(Exh. A), 10-22-20)
Ask a question about Abilene law
Corpus searches the Abilene sections it holds and shows the ones that match, with their citations. Free, no sign-in.
