For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 32-65 — Publication of users in significant noncompliance

Code of Ordinances of the City of Abilene, Texas (Supp. No. 15: codified through Ordinance No. 85-2026, enacted September 24, 2026) · Abilene Code of Ordinances § 32-65

Corpus is an independent public-information project, not the official City of Abilene website. Stable reference: corpuslaw.us/code/5e3b1012-d395-4a58-aa40-678e9a929968

Sec. 32-65. - Publication of users in significant noncompliance.

The Director shall publish annually, in a newspaper of general circulation that provides meaningful public notice within the jurisdictions served by the POTW, a list of the users which, during the previous twelve (12) months, were in significant noncompliance with applicable pretreatment standards and requirements. The term significant noncompliance shall mean: (1) Chronic violations of wastewater discharge limits, defined here as those in which sixty-six (66) percent or more of wastewater measurements taken for the same pollutant parameter taken during a six (6) month period exceed (by any magnitude) a numeric pretreatment standard or requirement, including instantaneous maximum limits defined in section 32-58 of this article; (2) Technical review criteria (TRC) violations, defined here as those in which thirty-three (33) percent or more of wastewater measurements taken for each pollutant parameter during a six-month period equals or exceeds the product of the numeric pretreatment standard or requirement including instantaneous maximum limits, as defined in section 32-58 of this article, multiplied by the applicable criteria (1.4 for BOD, TSS, fats, oils and grease, and 1.2 for all other pollutants except pH); (3) Any other violation of a pretreatment standard or requirement as defined in section 32-58 of this article (daily maximum, long-term average, instantaneous maximum limit, or narrative standard) that the Director determines has caused, alone or in combination with other discharges, interference or pass through, including endangering the health of POTW personnel or the general public; (4) Any discharge of pollutants that has caused imminent endangerment to the public or to the environment, or has resulted in the Director's exercise of its emergency authority to halt or prevent such a discharge; (5) Failure to meet, within ninety (90) days of the scheduled date, a compliance schedule milestone contained in a wastewater discharge permit or enforcement order for starting construction, completing construction, or attaining final compliance; (6) Failure to provide within forty-five (45) days after the due date, any required reports, including baseline monitoring reports, reports on compliance with categorical pretreatment standard deadlines, periodic self-monitoring reports, and reports on compliance with compliance schedules; (7) Failure to accurately report noncompliance; or (8) Any other violation(s), which may include violations of a BMP, which the Director determines will adversely affect the operation or implementation of the local pretreatment program.

(Ord. No. 36-1992, pt. 1, 9-24-92; Ord. No. 39-2020, pt. 1(Exh. A), 10-22-20)

Ask a question about Abilene law

Corpus searches the Abilene sections it holds and shows the ones that match, with their citations. Free, no sign-in.