§ 8.05 — Subdivision standards
Code of Ordinances of the City of Allen, Texas (Codified through Ordinance No. 4212-2-26, adopted February 10, 2026 (Supp. No. 23)) · Allen Land Development Code § 8.05
Corpus is an independent public-information project, not the official City of Allen website. Stable reference: corpuslaw.us/code/c21a98f9-d270-46b5-843b-12130cf9f7f6
Sec. 8.05. - Subdivision standards.
1. Construction plans. a. Construction plan and profile sheets for all public improvements shall be reviewed prior to construction and prior to submittal of the final plat. Construction plans and profiles shall be drawn on sheets measuring 24 inches by 36 inches and shall include: i. North arrow. ii. Scale. iii. Date. iv. A minimum of two benchmark descriptions to sea level datum shall be included with the plans. Each sheet shall show the seal and signature of the registered professional engineer licensed by the State of Texas who prepared the plans and shall include the following: (1) A plan and profile of each street with top of curb grades shown. Scale shall be one inch equals 50 feet horizontally, and appropriate vertical scale. (2) The cross section of proposed streets, alleys, and sidewalks, showing the width and type of pavement, base and subgrade, and location within the right-of-way. city standards shall not be shown on the construction plans. (3) A layout plan for hike and bike trails, showing trail alignment, grading and creek crossings, bridges and/or culverts. (4) A plan and profile of proposed sanitary sewers, with grades and pipe sizes indicated and showing locations of manholes, cleanouts, and other appurtenances, and a cross section of embedment. (5) Erosion control plan to be provided to include federal, state and city requirements for best management practices. (6) A plan of the proposed water distribution system showing pipe sizes and location of valves, fire hydrants, fittings, and other appurtenances, with a section showing embedment. (7) A plan to scale of all areas contributing stormwater runoff or drainage within and surrounding the proposed subdivision. Such plan shall indicate size of areas, storm frequency and duration data, amounts of runoff, points of concentration, and other data necessary to adequately design drainage facilities for the area. (8) A plan and profile of proposed storm sewers, showing hydraulic data, pipe grades and sizes, manholes, inlets, pipe connections, culverts, outlet structures, bridges, and other structures. (9) Profile views of individual improvements shall have no more than two improvements on one sheet unless specifically approved by the city engineer. The engineer of record is responsible for the accuracy, completeness, and conformance to city standards. (10) The purpose of the city review is to assure conformance to city policies and standards. However, the city review is limited to facts as presented on submitted plans. The city takes no project engineering responsibility. The engineer of record certifying the plans is responsible for the accuracy and completeness of the documents submitted for review and actual construction. (11) The city reserves the right to require plan corrections when actual conditions in the field are found to be contrary to or omitted from the previously submitted plan. (12) The cover sheet of the construction plans will include a statement that states "All construction shall conform to the North Central Texas Council of Governments Standard Specifications as amended by the city." b. Given the variety of subject matter involved in any given engineering design and construction plan submitted for review and given the varying character and complexity of each project, there is no listing of plan requirements that can possibly be all-encompassing (in substitution of engineering judgement). As a result, construction plans, submitted to the engineering department shall not be considered approved for construction until the director of engineering (or his/her designee) has determined that the quality and detail of such plans is sufficient or comprehensive to satisfy all requirements illustrated in City of Allen details, design manuals, or established, reasonable and prudent engineering practice. All construction plans shall be signed by the director of engineering (or his/her designee by way of official stamp) if they have been approved for construction. c. The developer or a general contractor shall provide a maintenance bond (no segregated bond will be accepted) in the amount of ten percent of the total amount of the contract guaranteeing the work in accordance with the plans and specifications for a period of two years after acceptance by the City of Allen. This bond shall provide for repair and/or replacement of all defects due to faulty material and workmanship that appear within a period of two years from the date of completion and acceptance of each work order by the City of Allen. The two-year maintenance bond shall be singular in ownership and the bond shall be uniform and encompassing of all aspects of the project (rather than have a separate bond for each trade). Said bond may either be initiated by the developer/owner or the general contractor, as long as the bond is for the entire project.
(Ord. No. 2293-6-04, § 1, 6-8-2004; Ord. No. 2593-2-07, § 1(Exh. A), 2-13-2007; Ord. No. 3697-8-19, § 1.I, 8-27-2019)
Ask a question about Allen law
Corpus searches the Allen sections it holds and shows the ones that match, with their citations. Free, no sign-in.
