For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 8.10 — Extensions of water and wastewater mains

Code of Ordinances of the City of Allen, Texas (Codified through Ordinance No. 4212-2-26, adopted February 10, 2026 (Supp. No. 23)) · Allen Land Development Code § 8.10

Corpus is an independent public-information project, not the official City of Allen website. Stable reference: corpuslaw.us/code/3aeb0a19-2bc6-4c9d-8eb7-eced313d5f81

Sec. 8.10. - Extensions of water and wastewater mains.

1. When oversized water and wastewater mains are required by the system, the city will participate in the cost of line extension on a pro rata basis. 2. Extensions of water and wastewater mains required to serve new subdivisions and other developments: a. Required extensions. All development shall be required to extend across the full width of the subdivision in such an alignment that it can be extended to the next property in accordance with the master water and sewer plans for the city. b. Properties already served by water and sewer shall not be required to install additional facilities unless: i. The current lines are not of adequate capacity to serve the proposed development; in which case the developer will be required to install adequate facilities; or ii. The current lines are not of adequate capacity to serve the zoning of a property that has been rezoned to a more intense use since the time of the original utility installation. 3. Utility easement requirements. a. The property owner shall be required to furnish all easements and rights-of-way designed to serve the development. Where reasonable, utilities shall be located within streets or alley rights-of-way, or other utility corridors identified by the city engineer. All existing and proposed easements shall be shown on the preliminary plat. b. Municipal easements for water, sanitary and storm sewer shall be a minimum of: • Ten feet in width for lines measuring eight inches in diameter or less. • Fifteen feet in width for lines measuring more than eight inches and less than or equal to 12 inches in diameter. • Twenty feet in width for lines exceeding 12 inches in diameter. Wider easements may be required by the community services director, depending on the depth and size of mains, and the existence of other utilities within the same easement. 4. Underground utilities. a. All new residential utility installations, including but not limited to electrical, gas, television, and telephone/telecommunication, shall be placed underground. b. All new nonresidential utility installations, including but not limited to electrical, gas, television, and telephone/telecommunication, shall be placed underground where service is provided adjacent to public street or right-of-way. Where electrical service is provided from an alley or rear easement not located adjacent to a public street, primary electrical service may be provided overhead along the property line. Primary and secondary electrical service routed on the site shall be placed underground. c. All new construction within the public street rights-of-way shall be located underground. Where a street is scheduled for reconstruction, new development may be required to provide an escrow of the difference between overhead and underground service. d. Nothing herein shall prevent temporary service during construction from being located overhead. e. New development shall assume responsibility for all expense related to the underground placement of utilities. f. All communication and electrical support equipment (transformers, amplifiers, switching devices, etc.) necessary for underground installation shall be pedestal- or pad-mounted or placed underground. g. All service drops must be underground and equipment shall be pad-mounted and properly screened. h. Electrical transmission lines 59 kilovolts or more may be located overhead on galvanized steel and/or concrete structures. i. A five-foot easement, in addition to the right-of-way (ROW) dedication, shall be provided in the front of all lots that are not served by alleys for the installation of dry utilities (electric, gas, phone, cable, etc.). j. Existing overhead electrical, television, and/or telephone/telecommunication utilities located on the developing property or adjacent right-of-way shall be excluded from the requirement to be placed underground. 5. Pro rata reimbursement. a. Upon application and payment of applicable fees and charges, the water and sewer department will permit connection to existing water and sewer lines in the city. If a person, corporation, property owner, developer or other entity (collectively referred to in this section as the "developer") has oversized or constructed an off-site water or sewer main or line to which the applicant desires to connect, a pro rata line charge, as set forth in the fee schedule of this Code, shall be made against each lot or tract of land that fronts or abuts such main or line in order to recover lot or tract fees to be placed in trust for the purpose of reimbursement of the developer. b. The city manager, or designee, on behalf of the city may enter into a pro rata agreement with an individual, corporation, property owner, developer or other legal entity that has oversized and/or constructed an extension of an off-site water and/or sewer main or line to reimburse, such person or entity, the cost of such oversize or extension from pro rata charges collected by the city and placed in trust for such developer. The developer shall be reimbursed such costs solely from the collection of pro rata charges. The term or length of reimbursement of a developer under a pro rata agreement shall begin on the date of final acceptance of the facilities by the city, and shall continue for a period not to exceed ten years. Any sums of money collected as a pro rata charge shall be credited to the water and sewer fund of the city for reimbursement to the developer on the submission of an invoice to the city.

(Ord. No. 1939-5-01, 5-3-2001; Ord. No. 1984-9-01, 9-6-2001; Ord. No. 2020-1-02, § 2, 1-17-2002; Ord. No. 2112-11-02, 11-26-2002; Ord. No. 2137-1-03, 1-28-2003; Ord. No. 2151-3-03, § 1, 3-25-2003; Ord. No. 2339-9-04, § 1, 9-28-2004; Ord. No. 2844-7-09, § 2, 7-14-2009)

Ask a question about Allen law

Corpus searches the Allen sections it holds and shows the ones that match, with their citations. Free, no sign-in.