For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 5.01 — Gas Well Permit Required

Code of the City of Arlington, Texas (City Secretary chapter PDFs as posted 2026-11-07, each current through the ordinance named on its cover, with the City Secretary's adopted-not-yet-codified Ordinances 25-063, 25-069, 25-073, 25-074, 25-075, 25-084, 26-003, 26-004, 26-019, 26-024 and 26-027 applied; Anti-Discrimination chapter not included) · Arlington City Code, Gas Drilling and Production Chapter, § 5.01

Corpus is an independent public-information project, not the official City of Arlington website. Stable reference: corpuslaw.us/code/74872d05-733e-49a0-a21b-a5e167c7387e

Section 5.01 Gas Well Permit Required

A. Approval of a specific use permit is required before a Gas Well Permit can be obtained from the City. The specific use permit shall establish the location of the drilling zone, and plans for fencing and landscaping. The specific use permit may address reductions in setbacks in accordance with Section 7.01.B. B. It shall be an offense for any person acting either for himself or acting as agent, employee, independent contractor, or servant for any person to drill any well, assist in any way in the site preparation, re-working, completion, or operation of any such well or to conduct any activity related to the production of gas without first obtaining a Gas Well Permit, or other appropriate permit in addition to a Gas Well Permit, issued by the City in accordance with this Ordinance. Activities include, but are not limited to re-working, initial site preparation, drilling, operation, construction of rigs or tank batteries, and fracturing. A permit shall be required for seismic surveys on public property. Written notice must be given to the Inspector no less than five business (5) days before the activities begin. C. A Gas Well Permit shall not constitute authority for the re-entering of an abandoned well. An Operator must obtain a new Gas Well Permit in accordance with the provisions of this Ordinance prior to drilling, re-working, or re-entering an abandoned well. D. When a Gas Well Permit has been issued to the Operator for the drilling, re-drilling, deepening, re-entering, activating, or converting of a well, such Gas Well Permit shall constitute sufficient authority for drilling, completion, operation, production gathering, or production maintenance, repair, re-working, testing, plugging, and abandonment of the well and/or any other activity associated with mineral exploration at the site of such well, provided, however, that a new or supplemental permit shall be obtained before such well may be reworked for purposes of re-drilling, deepening, or converting such well to a depth or use other than that set forth in the then current permit for such well. E. Any person who intends to re-work a permitted well using a drilling rig, or to recomplete or frac a permitted well after initial completion or to conduct seismic surveys or other exploration activities, shall give written notice to the Inspector no less than five business (5) days before the activities begin. The notice must identify where the activities will be conducted and must describe the activities in detail, including whether explosive charges will be used, the duration of the activities and the time the activities will be conducted. The notice must also provide the address and 24-hour phone number of the person conducting the activities. The person conducting the activities will post a sign on the property giving the public notice of the activities, including the name, address and 24-hour phone number of the person conducting the activities. If the Inspector determines that an inspection is necessary, the Operator will pay the City for the inspection. The following requirements shall apply to all fracing operations performed on a well: 1) at least five (5) business days before operations commence, the Operator shall post a sign at the entrance of the drill site advising the public of the date the operations will commence; and 2) at no time shall the well be allowed to flow or vent directly to the atmosphere without first directing the flow through separation equipment or into a portable tank. The following requirements shall apply to all flowback operations performed on a well: 1) the Operator shall give written notice to the Inspector no less than five (5) business days before flowback operations will be conducted; 2) flowback operations to recover fluids used during fracing may be performed 24 hours per day and seven days per week; 3) truck traffic shall be permitted only during daytime, non-restricted hours; and 4) all other requirements must be followed. In addition to the notices required above, for all gas well drilling zones within six hundred (600) feet of a protected use, after April 1, 2019, the Operator shall give written notice to all residents living within one thousand, three hundred twenty (1,320) feet of a drilling zone no less than five (5) business days before conducting the following operations at a gas well on site: drilling, fracing, flowback, or re-working operations that require the use of a well servicing rig. F. A Gas Well Permit shall automatically terminate, unless extended, if drilling is not commenced within one hundred eighty (180) days from the date of the issuance of the Gas Well Permit; provided, however, that said Gas Well Permit is administratively approved. An initial Gas Well Permit approved concurrently with a new Specific Use Permit or an amended Specific Use Permit establishing a drilling zone shall automatically terminate, unless extended, if drilling is not commenced within two (2) years from the date of the issuance of the initial Gas Well Permit(s). If that gas well has not been drilled within the first year of the term, the Operator shall hold a public meeting with all residents within one thousand, three hundred twenty (1,320) feet of the established drilling zone for the purpose of informing the public of its drilling schedule prior to commencement of drilling. A Gas Well Permit may be extended by the Inspector for an additional one hundred eighty (180) days upon request by the Operator, proof that the specifics of the issued Gas Well Permit have not changed, and payment of an extended permit fee. G. The Gas Well Permits required by this Ordinance are in addition to and are not in lieu of any permit that may be required by the Unified Development Code, the Fire Code or any other provision of this Code, or by any other governmental agency. H. No Gas Well Permit shall be issued for any well to be drilled within any floodway, as defined in the Flood Damage Prevention chapter of the City’s Code of Ordinances, and as identified by FEMA on the most current FIRM. Tanks and equipment located in any floodplain must also meet the minimum requirements of the Flood Damage Prevention chapter. I. A Gas Well Permit shall not be issued for any well to be drilled until the Operator has paid a road damage fee, as established by resolution from time to time by the City Council and the most current resolution is incorporated herein for all purposes. The road damage fee shall be paid by the Operator to the City prior to the commencement of any activity under the Gas Well Permit. The road damage fee is based on the Road Damage Assessment Study prepared for the City, as amended, and available with P&DS. The road damage fee shall be calculated based on the access lane miles for the appropriate road type, the assessment per lane mile, and the number of lane miles included in each gas well permit application. Replacement costs for asphalt and/or concrete road segments shall be determined from current cost per square yard of road surface material, including installation and labor. J. By acceptance of any Gas Well Permit issued pursuant to this Ordinance, the Operator expressly stipulates and agrees to be bound by and comply with the provisions of this Ordinance. The terms of this Ordinance shall be deemed to be incorporated in any Gas Well Permit issued pursuant to this Chapter with the same force and effect as if this Ordinance was set forth verbatim in such Gas Well Permit. The Gas Well Permit shall also include any stipulations or conditions added as part of the approved zoning for the site. K. All requirements for permit approval shall comply with applicable state or federal laws, rules or regulations. The requirements of this Article shall be interpreted and applied in accordance with all applicable state or federal laws, rules and regulations.

(Amend Ord 19-008, 3/19/19)

Ask a question about Arlington law

Corpus searches the Arlington sections it holds and shows the ones that match, with their citations. Free, no sign-in.