Code of the City of Arlington, Texas (City Secretary chapter PDFs as posted 2026-11-07, each current through the ordinance named on its cover, with the City Secretary's adopted-not-yet-codified Ordinances 25-063, 25-069, 25-073, 25-074, 25-075, 25-084, 26-003, 26-004, 26-019, 26-024 and 26-027 applied; Anti-Discrimination chapter not included) · Arlington City Code, Gas Drilling and Production Chapter, § 5.05

Corpus is an independent public-information project, not the official City of Arlington website. Stable reference: corpuslaw.us/code/a839c7f7-72aa-4024-bfe2-60a9f8884b58

Section 5.05 Amended Gas Well Permits

A. An Operator may submit an application to the Inspector to amend an existing Gas Well Permit to relocate a drill site that is shown on (or incorporated by reference as part of) the existing Gas Well Permit, or to otherwise amend the existing Gas Well Permit. Any change to a permit, which includes all provisions in the entire application packet of documents, must also go through the amended well permit process, e.g., change in Operator, transfer of lease, amended RRC permit, or pipeline routing. An Operator must submit an application to commence drilling from a new drill site that is not shown on (or incorporated by reference as part of) an existing Gas Well Permit. B. Applications for amended Gas Well Permits shall be in writing, shall be signed by the Operator, and shall include the following: 1. A non-refundable permit fee as approved by resolution of the Arlington City Council. The Applicant/Operator, in addition to the usual application fee, shall pay the City for the actual cost to the City for the services of an inspector and/or technical expert to review the application and/or information supplement; Additional services the City incurs for services of an inspector and/or technical expert shall be paid by the Operator. 2. A description of the proposed amendments; 3. Any changes to the information submitted with the application for the existing Gas Well Permit (if such information has not previously been provided to the City); 4. Such additional information as is reasonably required by the Inspector to demonstrate compliance with the applicable Gas Well Permit; and 5. Such additional information as is reasonably required by the Inspector to prevent imminent destruction of property or injury to persons. C. All applications for amended Gas Well Permits shall be filed with the Inspector for review. Incomplete applications may be returned to the applicant, in which case the City shall provide a written explanation of the deficiencies; however, the City shall retain the application fee. The City may return any application as incomplete if there is a dispute pending before the RRC regarding the determination of the Operator. D. If the activities proposed by the amendment are not materially different from the activities covered by the existing Gas Well Permit, and if the proposed activities are in conformance with the applicable Gas Well Permit, then the P&DS Director or designee shall approve the amendment within ten (10) business days after the application is filed. E. If the activities proposed by the amendment are materially different from the activities covered by the existing Gas Well Permit, and if the proposed activities are in conformance with the applicable Gas Well Permit, then the P&DS Director or designee shall approve the amendment within thirty (30) days after the application is filed. If, however, the activities proposed by the amendment are materially different and, in the judgment of the Inspector, might create a risk of imminent destruction of property or injury to persons that was not associated with the activities covered by the existing Gas Well Permit or that was not otherwise taken into consideration by the existing Gas Well Permit, the Inspector may require the amendment to be processed as a new Gas Well Permit application. F. An amended permit shall not be approved if the activities proposed by the amendment seek to modify or change a condition of the approved zoning for the site. G. The failure of the P&DS Director or designee to review and issue an amended Gas Well Permit within the time limits specified above shall not cause the application for the amended Gas Well Permit to be deemed approved. H. The decision of the P&DS Director or designee to deny an amendment to a Gas Well Permit shall be provided to the Operator in writing within ten (10) business days after the decision, including an explanation of the basis for the decision. The Operator may appeal any such denial to the City Council.

(Amend Ord 19-008, 3/19/19)

Ask a question about Arlington law

Corpus searches the Arlington sections it holds and shows the ones that match, with their citations. Free, no sign-in.