For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 5.02 — Gas Well Permit Application and Filing Fees

Code of the City of Arlington, Texas (City Secretary chapter PDFs as posted 2026-11-07, each current through the ordinance named on its cover, with the City Secretary's adopted-not-yet-codified Ordinances 25-063, 25-069, 25-073, 25-074, 25-075, 25-084, 26-003, 26-004, 26-019, 26-024 and 26-027 applied; Anti-Discrimination chapter not included) · Arlington City Code, Gas Drilling and Production Chapter, § 5.02

Corpus is an independent public-information project, not the official City of Arlington website. Stable reference: corpuslaw.us/code/d1ce4d57-a921-4467-a2fd-47800b1739e8

Section 5.02 Gas Well Permit Application and Filing Fees

A. Every application for a Gas Well Permit issued pursuant to this Ordinance shall be in writing signed by the Operator, or some person duly authorized to sign on his behalf, and filed with the Inspector. B. Every application shall be accompanied by a non-refundable permit fee. The permit fee shall be set by resolution of the Arlington City Council and amended from time to time and the most current resolution is incorporated herein for all purposes. The Operator, in addition to the usual application fee, shall pay the City an inspector fee in an amount set by resolution of the Arlington City Council for the services of an inspector and/or technical expert to review the application and/or information supplement, and for the services of staff personnel to perform ongoing inspection and ensure the Operator’s compliance with this Chapter. Additional services the City incurs for services of an inspector and/or technical expert shall be paid by the Operator at the standard hourly rate plus expenses. C. The application shall include the following information: 1. All application fees and other fees required by this Chapter 2. Completed and signed application form containing at least the following information: a. Date of the application b. Proposed well name c. Surface owner names(s) and address(es) of the drill site d. Mineral Lessee name and address e. Applicant/Operator name and address and if the Operator is a corporation, the state of incorporation, address, officer’s names and addresses, registered agent and address and Articles of Incorporation; and if the Operator is a partnership, the names and addresses of the general and limited partners. Copies of any “Doing Business As” filings. f. Name and address of individual designated to receive notice g. Name of Operator representative with supervisory authority over all gas drill site activities and a 24-hour phone number h. The name, address and 24-hour phone number of the person to be notified in case of an emergency i. The exact acreage of the drill site and number of wells included in the Gas Well Permit application. j. A legal description of the surface property with lot/block information or abstract and survey. k. A notarized statement signed by the Operator, or designated representative, that the information submitted with the application is, to the best knowledge and belief of the Operator or designated representative, true and correct. 3. The site plan shall include the following information: a. Map showing proposed transportation routes and roads for equipment, supplies, chemicals or waste products used or produced by the gas operation. The map shall include a list of the length of all public roads that will be used for site ingress and egress. The map shall also show the location of any areas to be used for truck staging or storage related to the drill site. b. Aerial exhibit showing the location and description of all buildings within 600 feet of the drilling zone. Include setback reduction support letters if a protected use is within 600 feet of the drilling zone. c. A site plan of the proposed drill site showing the location of all improvements and equipment, including the location of the drilling zone and the proposed well(s) and other facilities, including, but not limited to, fire hydrants proposed to supply water to the site, tanks, storage tanks, pipelines, fencing, lights, floodways, compressors, separators and storage sheds. Indicate proposed pipeline routes on the plan and the water storage proposal for facing. d. A detailed site plan that includes specific details to the projected location of the major components of the drilling site, impacted vegetation, creeks and other topographic features, adjacent buildings and other structures and the measured distance from the drill site to these buildings and structures, temporary and permanent fencing and landscaping. Provide distance measurements and general ordinal direction, from drilling zone to the nearest residence, school and park. 4. A description of public utilities required during drilling and operation. 5. A site plan showing fire protection for the site, which shall include public or private hydrants, or indicate an alternate means of fire protection. 6. A detailed site plan of the proposed drill site to include the location of the fire hydrant(s) or reclaimed water connections proposed to supply water to the site; an estimate of the total volume of water desired; and the approximate dates the water supply will be needed on site. Indicate on the plan the water source proposed for both the drilling and fracing stages. A copy of the approved water site plan shall accompany any request for a temporary construction meter. Drilling within 2,000 feet of a reclaimed water line requires connection to reclaimed water line for fracing purposes unless Operator demonstrates that use of reclaimed water is not economically feasible. 7. A copy of any Stormwater Pollution Prevention Plan required by the EPA or City. A copy of the notice of intent shall be submitted to P&DS five (5) days prior to the commencement of any onsite activity. 8. An accurate legal description of the lease property to be used for the gas operation, the parcel and the production unit and name of the geologic formation as used by the RRC. Property recorded by plat should reference subdivision, block and lot numbers. 9. A copy of the determination by the TCEQ of the depth of useable quality ground water. 10. The insurance and security requirement documents required under this Chapter. An original of the bond or letter of credit shall be submitted. 11. An Emergency Action Response Plan establishing written procedures to minimize any hazard resulting from drilling, completion, or production of gas wells. Said plan shall use existing best practices regarding protection of the public and be consistent with laws and regulations of the Fire Code, NFPA, RRC, TCEQ, API, Department of Transportation, and/or the Environmental Protection Agency. The Emergency Action Response Plan shall be kept current with any additions, modifications, and/or amendments concerning all construction related activities, natural gas operations and natural gas production. Updated plans shall be submitted to the Inspector within five (5) business days after any additions, modifications, and/or amendments to said plan(s). A copy of the emergency response plan shall be kept on site. At a minimum, the emergency response plan shall provide for: a. Prompt and effective response by the Operator to emergencies regarding leaks or releases that can affect public health, safety and welfare; fire or explosions at or near a gas well; and natural disasters and severe weather. b. Effective means to notify and communicate required and pertinent information to local fire, police and public officials during an emergency. c. The availability of personnel, equipment, tools and materials as necessary at the scene of an emergency. d. Measures to be taken to reduce public exposure to injury and the probability of accidental death or dismemberment. e. Emergency shutdown of a gas well and related site. f. The safe restoration of service and operations following an emergency or incident. g. A follow-up incident investigation to determine the cause of the incident and require the implementation of corrective measures. h. An emergency notifications page that indicates all emergencies must be reported to the Fire Department at 911 and to P&DS. i. Drive-to-maps from public rights-of-way to the drill site. 12. A Hazardous Materials Management Plan, prepared in accordance with the Fire Code, shall be submitted and be on file with the Fire Department and the Inspector. 13. A copy of the pre-drilling ambient noise level report. The report shall reference the site, include dates the test was performed, identify the testing equipment used and where it was placed for testing, and include results. 14. A Site Restoration Plan shall be submitted with the initial gas well permit on an approved site. At a minimum, this plan shall document the following: a. The existing conditions of the property prior to drilling activity, including site photographs. b. A detailed description of site restoration methods that will ensure the site is restored to pre-development conditions, including site grading, vegetative restoration, and abandonment of any equipment or facilities. D. Any final plans or other documents required by this Chapter that will be archived must be submitted in an electronic format specified by the P&DS Director as a condition to issuance of any type of permit, approval, or other action related to the final plans or documents. The City may provide an electronic conversion service for a fee in the amount set forth by City Council resolution. The P&DS Director shall provide a schedule indicating which documents must be provided electronically, at which point during the approval process, and other information as necessary to implement an electronic archiving program.

(Amend Ord 19- 008, 3/19/19) (Amend Ord 19-008, 3/19/19)

Ask a question about Arlington law

Corpus searches the Arlington sections it holds and shows the ones that match, with their citations. Free, no sign-in.