For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 3.11 — Building Permits

Code of Ordinances of the City of College Station, Texas (Supp. No. 10 Update 2: codified through Ordinance No. 2026-4726, adopted October 22, 2026) · College Station Land Development Ordinances, App. A, § 3.11

Corpus is an independent public-information project, not the official City of College Station website. Stable reference: corpuslaw.us/code/a50e11d8-54c7-4647-915d-787473e29f91

Sec. 3.11. - Building Permits.

Building Permit Review Process [image omitted; see the official code] A. Applicability. 1. No building or other structure shall hereafter be erected, moved, added to, structurally altered, repaired, demolished, or occupancy changed without a permit issued by the Building Official except in conformity with the provisions of this Section and the International Building Code, as adopted by the City unless otherwise provided for in the City of College Station Code of Ordinances. No building permit issued under the provisions of this Section for land use or construction in the City shall be considered valid unless signed by the Building Official. 2. In the WPC Wolf Pen Creek design district, all substantial maintenance (including but not limited to rehabilitation, façade work, and change of exterior materials or other construction) shall be subject to the building permit review process detailed in this Section. All building permits required in the WPC Wolf Pen Creek design district, including minor additions to a site (accessory buildings and structures, change of solid waste disposal location, painting, and landscaping) shall be reviewed by the Administrator. B. Application for Building Permit. 1. Applications for building permits for single-family, duplex, townhouse, or courtyard house structures shall be accompanied by one (1) set of complete plans, drawn to scale, showing the actual dimensions and shape of the lot to be built upon; the exact sizes and locations of buildings already existing on the lot, if any; and the location and dimensions of the proposed building or alteration, easements, and required setbacks. Applications for multi-family (including multiplex) and non-residential structures shall be accompanied by three (3) sets of complete plans, drawn to scale, including the approved site plan as required in the Site Plans Section above. Additional sets of plans shall be supplied to the Building Official upon request. 2. The application shall include such other information as lawfully may be required by the Building Official or the Administrator, including existing or proposed building or alteration; existing or proposed uses of the building and land; the number of families, housekeeping units, or rental units the building is designed to accommodate; conditions existing on the lot; and such other matters as may be necessary to determine conformance with and provide for the enforcement of this UDO. 3. One (1) copy of the plans shall be returned to the applicant after it is marked as either approved, approved with conditions, or disapproved and attested to same by the signature of the Building Official on such copy. The original copy of the plans, similarly marked, and the associated site plan shall be retained by the Building Official. 4. Where applicable, applicants shall submit information and materials required in the Landscaping and Tree Protection Section of Article 7, General Development Standards of this UDO. 5. Where applicable, applicants shall submit information and materials required in the Non-Residential Architectural Standards Section of Article 7, General Development Standards of this UDO. 6. If the subject property is zoned MH Middle Housing, applicants shall specify the proposed residential product type. See the Middle Housing Product Types and Dimensional Standards Table in the Residential Dimensional Standards Section of Article 5, District Purpose Statements and Supplemental Standards of this UDO for a list of allowed product types. C. Review and Recommendation. The Building Official shall review all building permit applications to determine if intended uses, buildings, or structures comply with all applicable regulations and standards, including this UDO, and approve or disapprove the same. D. Review and Action by Building Official. 1. The Building Official shall make a final determination of whether the intended uses, buildings, or structures comply with all applicable regulations, standards, and the International Building Code, as adopted. The Building Official shall not issue a building permit unless the plans, specifications, and intended use of such building or structures or parts thereof conform in all respects to the provisions of this UDO and the International Building Code, as adopted. 2. If the subject property is zoned P-MUD Planned Mixed-Use District or PDD Planned Development District, the City Council may approve a concept plan that provides for general modifications to the site development standards. The general modifications shall be indicated on the approved concept plan. The Administrator shall determine the specific standards that comply with the general modifications of the site development requirements during the building permit review. The applicant or the Administrator may have the City Council determine the specific standards that comply with the approved concept plan. E. Decision by Administrator (WPC Wolf Pen Creek only). 1. Design Review. The Administrator shall apply the standards in the WPC Wolf Pen Creek Subsection of the Design Districts Section of Article 5, District Purpose Statements and Supplemental Standards of this UDO. In considering such matters, the Administrator may rely on special area plans or studies adopted by the City Council. 2. Written Decision. The decision of approval or denial shall be communicated in writing to the applicant. F. Waivers (WPC Wolf Pen Creek only). The Design Review Board shall hear and decide requests for waivers from the standards in the WPC Wolf Pen Creek Subsection of the Design Districts Section of Article 5, District Purpose Statements and Supplemental Standards of this UDO as limited to the possible waivers authorized by that Subsection.

(Ord. No. 2023-4453, Pt. 1(Exh. A), 8-10-2023)

Ask a question about College Station law

Corpus searches the College Station sections it holds and shows the ones that match, with their citations. Free, no sign-in.