Sec. 3.8. - Development Permits.
Development Permit Review Process [image omitted; see the official code] A. Applicability. A development permit shall be required prior to any development activity to ensure conformance to the provisions and requirements of this UDO. The following uses are exempt from the permitting requirements of this Section, but shall otherwise meet all of the requirements of this UDO and the Bryan/College Station Unified Design Guidelines, Technical Specifications and Standard Details, and the Drainage and Stormwater Management Section of Article 7, General Development Standards of this UDO: 1. Customary and incidental grounds maintenance, landscaping, and gardening; 2. Drainage-related improvements or modifications by a homeowner on property used as their principal residence where that property lies outside of the designated area of special flood hazard; and 3. Uses by a landowner of their property for bona fide agricultural purposes. B. Approval Process. Prior to the issuance of a development permit, the following requirements shall be met: 1. Pre-Application Conference. Prior to the submission of an application for a development permit, applicants are encouraged to schedule and attend an optional pre-application conference following the procedure laid out in the Pre-Application Conference Subsection of the General Approval Procedures Section above. 2. Application. A complete application for a development permit shall be submitted to the Development Engineer as set forth in the General Approval Procedures Section above. 3. Review and Action by the Development Engineer. The Development Engineer shall review the required information and application form and shall take one (1) of the following actions: a. Approve the development permit; b. Disapprove the development permit; c. Approve the development permit with conditions; or d. Require additional information or an engineering conference with the applicant or their engineer. 4. Review Criteria. Approval or denial of a development permit by the Development Engineer shall be based on the following relevant factors: a. The danger to life or property due to flooding or erosion damage; b. The susceptibility of the proposed facility and its contents to flood damage and the effect of such damage on the individual owner; c. The danger that materials may be swept onto other lands to the injury of others; d. The compatibility of the proposed use with existing and anticipated development; e. The maintenance and operational costs of providing governmental services during and after flood conditions, including maintenance and repair of streets and bridges, and public utilities and facilities such as sewer, gas, electrical, and water systems; f. The expected heights, velocity, duration, rate of rise, and sediment transport of the flood waters, and the effects of wave action, if applicable, expected at the site; g. The necessity for the facility of a waterfront location, where applicable; h. The availability of alternative locations, not subject to flooding or erosion damage, for the proposed use; i. The barricading of existing trees to remain on the property and count as protected trees under the Landscaping and Tree Protection Section of Article 7, General Development Standards of this UDO; and j. Compliance with this UDO. 5. Notification of Decision. a. The applicant shall be notified in writing of the action of the Development Engineer. If the development permit has been disapproved, the specific reasons for disapproval shall be indicated in the notification. If additional information is required of the applicant, the specific requirements shall be indicated in the notification. A final determination of the approval or disapproval of the development permit, considering the additional information, shall be made, and written notification to the applicant is given within ten (10) working days after acceptance of the complete application. b. Any proposal which includes areas of special flood hazard within the following special drainage areas shall receive written notice of approval or disapproval of the development permit from the Development Engineer within sixty (60) working days after receipt of the proposal: 1) The entirety of Carter's Creek; 2) The main channel of Lick Creek; 3) Wolf Pen Creek from the Earl Rudder Freeway to the confluence with Carter's Creek; and 4) The Brazos River.
(Ord. No. 2023-4453, Pt. 1(Exh. A), 8-10-2023)
Ask a question about College Station law
Corpus searches the College Station sections it holds and shows the ones that match, with their citations. Free, no sign-in.