5.3.7 - Public and Semi-Public Utility Uses.

A. Power Stations, Electric Substations, Interchanges, and Switch Stations. 1. Compliance with Electric Standards. Electric substations and switch stations shall comply with the standards in Section 7.13: Electric Standards. A site plan demonstrating substantial conformance with all the applicable design standards identified in Section 7.13: Electric Standards, shall be submitted. 2. Procedures for Review. An applicant shall submit an application for a specific use permit pursuant to Subsection 2.5.2: Specific Use Permit (SUP), unless it is able to meet all the following requirements: a. Use of the property is associated with a City Council approved Capital Improvements Plan (CIP) or other City Council approved Master Plan. b. A public hearing was held at the City Council for the selection of the site to include: i. Written notice of the public hearing was provided to property owners within 200 feet and physical addresses within 500 feet of the subject property at least 12 days prior to the public hearing; ii. A sign advertising the public hearing was posted on or adjacent to the property at least 12 days prior to the public hearing; and iii. Proposed screening wall location and design were reviewed and approved by the City Council. c. A neighborhood meeting was held at least 15 days prior to the public hearing at City Council for the acquisition of the site. B. Solar Collector as a Principal Use. Solar collectors shall conform to all height, setback, and landscaping requirements within their respective zoning district. The following additional standards apply to all solar collectors: 1. All solar collector systems shall be in compliance with all currently adopted building codes; 2. Solar collector systems that use concentrator technologies and have not incorporated anti-glare measures into the system or installation shall be placed in areas so that the concentrated solar glare shall not be directed onto inhabited adjacent properties or roadways; and 3. The design of the solar collector system shall use materials, colors, textures, screening, and landscaping similar to their background or the existing natural environment to the most reasonable extent possible without prohibiting the installation. C. Wind Energy Conversion System (WECS). 1. For All Wind Energy Systems. a. No tower shall be lit, except to comply with Federal Aviation Authority (FAA) standards. b. All wiring between the wind system and the substation shall be buried underground. c. All proposed wind systems shall conform to established noise standards in the City of Denton. 2. For Large Wind Energy Systems. a. The minimum acreage for a large wind system shall be established based on the setbacks of the turbine(s) and the height of the turbine(s); b. All turbines located within the same large wind system property shall be of a similar tower design, including the type, number of blades, and direction of blade rotation; c. Large wind systems shall be setback at least one and one-half times the height of the turbine and rotor diameter from the property line. Large wind systems shall also be setback at least one and one-half times the height of the turbine from above ground telephone, electrical lines, and other uninhabitable structures; d. Towers shall not be climbable up to 15 feet above ground level.

Ask a question about Denton law

Corpus searches the Denton sections it holds and shows the ones that match, with their citations. Free, no sign-in.