§ 5.5.6 — Additional Standards for Specific Temporary Uses and Structures
Code of Ordinances, City of Denton, Texas (Supp. No. 37, Update 1: codified through Ordinance No. 26-296 adopted March 24, 2026) · Denton Development Code subch. 5, § 5.5.6
Corpus is an independent public-information project, not the official City of Denton website. Stable reference: corpuslaw.us/code/2466ed08-4fa1-43fa-b702-61b03691c2e5
5.5.6 - Additional Standards for Specific Temporary Uses and Structures.
A. Temporary Storage Containers and Other Portable Storage Units. 1. Temporary storage containers and other portable storage units shall be located on an improved surface, but may not be located in any part of a fire lane, required parking space, maneuvering lane, public right-of-way, or visibility triangle. 2. The property where the temporary storage container or other portable storage unit is located shall contain a principal structure, and the storage container or other portable storage unit will be considered accessory to the principal structure. 3. Storage containers and other portable storage units that are less than 120 square feet, located in a rear yard, and are screened from public view are not required to obtain a temporary use permit. B. Concrete or Asphalt Batching Plant, Temporary. 1. Permit Requirements. Applicants for a permit to operate a temporary concrete or asphalt batching must submit a letter from the Texas Commission on Environmental Quality (TCEQ) indicating that the proposed facility is exempt from the permitting procedures under the standard exemption, as amended. a. Concrete Batching Plants. i. When both wastewater and stormwater discharges will be generated on-site, concrete batch plants must be permitted under TCEQ discharge permit TXG110000. ii. When only stormwater discharges will be generated on-site, concrete batch plants may be included in construction stormwater permit TXR150000 for the construction site, if located at the construction site. 2. Location. a. Temporary concrete batching plants (including associated stationary equipment and stockpiles) shall be located at least 300 feet from any recreational area, school, residence or other structure not occupied or used solely by the owner of the property upon which the facility is located. This distance limitation does not apply to structures within the boundaries of the project for which the facility is to pour concrete, provided that the facility is located on or contiguous to the project. b. Temporary asphalt batching plants shall be located at least one-half mile from any recreational area, school, or residence, or any other structure not occupied or used exclusively by the owner of the property upon which the facility is located. 3. Operational Standards. a. The facility shall be operated in a manner that eliminates unnecessary dust, noise, and odor (including, with limitation, covering trucks, hoppers and chutes, loading and unloading devices, mixing operation and maintaining driveways and parking areas free of dust). b. All stockpiles shall be sprinkled with water or dust suppressant chemicals, or both, as necessary to achieve maximum control of dust emissions. The stockpile sprinkler system shall be operable at all times. c. Spilled cement and fly ash used in the batch shall be cleaned up immediately and contained or dampened to minimize dust emissions due to wind erosion and vehicle traffic. d. All open-bodied vehicles transporting material from a dry batch plant to the paving mixer shall be loaded with a layer of sand on top, and the truck shall be covered with a tarp to minimize the emission of dust under existing conditions. e. The applicant shall clear the site of all equipment, material, and debris upon completion of the project. 4. Hours of Operation. The facility may operate only between the hours of 6:00 a.m. and 8:30 p.m., Monday through Friday, from June 1 to September 30; 7:00 a.m. and 8:30 p.m., Monday through Friday, from October 1 to May 31; 8:00 a.m. and 8:30 p.m. on Saturdays; and 1:00 p.m. and 8:30 p.m. on Sundays. 5. Revocation of Permit. In addition to the criteria established in Subsection 5.5.3D, the Director may terminate or revoke a temporary use permit for a concrete or asphalt batching plant for any of the following reasons: a. The facility fails to comply with any of the requirements as listed in this subsection; or b. The facility violates any of the standards as listed on the standard exemption list adopted by the Texas Commission on Environmental Quality (TCEQ), as amended. 6. Additional Approval Required for Off-Site Temporary Batch Plants. A Specific Use Permit (SUP) is required for all temporary batching facilities grinding, mixing, or otherwise preparing concrete, asphalt, or its ingredients or products for transportation to another site other than the site on which the batching facility is being located. C. Field or Construction Office. 1. Field or construction offices may only be approved for licensed contractors working on construction projects for which permits have been issued. They shall be located on the same property and within the same project area where the work is being performed and shall not encroach into any public right-of-way. Field or construction or offices shall be required to meet all applicable state and local building and set-up codes. 2. Field or construction offices may not be used as a dwelling unit or residence.
(Ord. No. DCA19-0027a, § 2(Exh. A), 2-4-2020)
Ask a question about Denton law
Corpus searches the Denton sections it holds and shows the ones that match, with their citations. Free, no sign-in.
