§ 7.3.5 — General Standards
Code of Ordinances, City of Denton, Texas (Supp. No. 37, Update 1: codified through Ordinance No. 26-296 adopted March 24, 2026) · Denton Development Code subch. 7, § 7.3.5
Corpus is an independent public-information project, not the official City of Denton website. Stable reference: corpuslaw.us/code/f93ff1d7-4d35-4839-959d-e31e0abc6882
7.3.5 - General Standards.
Land-disturbing activities shall comply with the Texas Commission on Environmental Quality (TCEQ) regulations found in TXR150000 and this section. The design criteria for erosion and sediment control shall comply with the design standards contained in the Site Design Criteria Manual. Permittees shall also comply with the following general regulations and standards: A. General Regulations. 1. The activity will not create or contribute to landslides, accelerated soil creep, and settlement. 2. The activity will not create or contribute to flooding, erosion, or increased turbidity, siltation, or other forms of pollution in a watercourse. 3. Operations shall be consistent with anticipated build-out schedule and shall be conducted so as to expose the smallest practical area of soil to erosion for the least possible time. B. Construction Stormwater Notice of Intent (NOI) Required. The site operator or owner shall provide a copy of the signed Notice of Intent (NOI) from the TCEQ for all sites that are larger than five acres or are less than five acres and part of a larger common plan of development that is larger than five acres. A copy of Notice of Termination (NOT) shall be provided to the city after final stabilization is completed and temporary erosion and sediment controls are removed. C. Construction Site Notice (CSN) Required. 1. A small construction site operator or owner shall provide a copy of the Small CSN Construction Site Notice for all sites larger than one acre and less five acres, or part of a common plan of development greater than one acre and less than five acres. 2. Secondary operators of large construction sites shall provide a copy of the signed Secondary Operator CSN for all sites larger than five acres or part of a larger common plan of development greater than five acres. 3. The CSN notice shall be posted at the construction site in a location where it is safely and readily available for viewing by the general public and city staff. The CSN must be posted at least two days prior to commencing construction activity and maintained in that location until completion of the construction activity. D. Stormwater Pollution Prevention Plan (SWPPP) Required. 1. The site owner or operator is responsible for routinely inspecting erosion and sediment controls at the site as specified in the SWPPP. The city shall also inspect erosion and sediment controls located at a site for compliance. If a responsible party fails to implement, inspect, and maintain controls as specified in the site's approved SWPPP, the city shall provide such party with written notice of non-compliance. The responsible party shall have no less than 48 hours to correct the violation, which may be extended for inclement weather or other factors outside of the control of the responsible party at the discretion of the City Inspector. 2. When construction or land-disturbing activities are conducted as a part of a nonresidential or multifamily construction project, temporary erosion and sediment controls shall be installed prior to land-disturbing activities as specified in the approved SWPPP. Permanent erosion and sediment controls that are specified in the SWPPP shall be installed and maintained prior to the occupancy of any nonresidential or multifamily structure. Phased occupancy will only be allowed when there are no outstanding erosion or sediment control violations for the project for which the request is made. 3. When construction or land-disturbing activities are conducted as part of a residential subdivision project, temporary erosion and sediment controls shall be installed prior to land-disturbing activities as specified in the approved SWPPP. Permanent erosion and sediment controls that are specified in the SWPPP shall be installed and maintained prior to final acceptance of a subdivision. a. The permittee for such subdivision shall continue to maintain all temporary erosion and sediment control devices until permanent erosion and sediment control has been established on all lots within the subdivision for which the permittee retains day-to-day operational control and a Notice of Termination (NOT) is issued; b. If a permittee sells one or more lots in a subdivision to a purchaser, the permittee may extend permit coverage to the purchaser under the developer's NOI. If this occurs, the permittee remains the responsible party for the entire subdivision including the purchased lot(s) and remains liable for violation of this section. A copy of the developer's NOI and a letter from the developer stating that coverage under the NOI has been extended to the purchaser shall be provided to the city as a condition of building permit issuance for the lot(s); c. If a permittee sells one or more lots in a subdivision to a purchaser, the permittee may choose to not extend permit coverage to the purchaser under the permittee's NOI. If this occurs, the permittee remains the responsible party for only those lots for which the permittee retains day-to-day operational control. The purchaser then becomes the responsible party for the lot(s) and is liable for violation of this section; d. If a purchaser sells one or more lots prior to final occupancy, the current owner of the lot(s) becomes the responsible party. A copy of owner's NOI and SWPPP shall be provided to the city as a condition of building permit issuance for the lot(s). E. Establishing Ground Cover. Stabilization of disturbed areas, excluding areas within an approved landscape plan must, at a minimum, be initiated immediately whenever any clearing, grading, excavating, or other earth disturbing activities have permanently ceased on any portion of the site, or temporarily ceased on any portion of the site and will not resume for a period exceeding 14 calendar days. In the context of this requirement, "immediately" means as soon as practicable, but no later than the end of the next work day, following the day when the earth-disturbing activities have temporarily or permanently ceased. 1. Temporary Stabilization. a. Temporary stabilization measures shall be established in all areas of the site where soil disturbances have occurred and where construction activities have temporarily ceased for more than 14 calendar days. b. Temporary stabilization shall be completed no more than 14 calendar days after initiation of soil stabilization measures. c. Temporary stabilization may include seeding, geotextiles, mulches, and similar measures that are designed to reduce or eliminate erosion until permanent stabilization can be achieved or until further construction activity takes place and are approved as part of the permit. 2. Permanent Stabilization. a. Final stabilization measures shall be initiated within 48 hours of construction activities being completed on a portion of the site. b. Final stabilization measures shall be a uniform perennial vegetative cover with a density of at least 70 percent of the native background vegetative cover for all unpaved areas not covered by structures. c. Final stabilization shall be completed prior to termination of permit coverage. F. Cleanup Operations. 1. The property owner shall be responsible for all cleanup operations incidental to the disturbance of the surface of the property within six months of the operation completion date, including removal of temporary erosion and sediment controls if final stabilization has been obtained, and removal of all trash or other materials not suitable for fill; 2. No soil, rock, mud, and/or other construction debris shall be allowed to be deposited on or in the streets, alleys, utility facilities, rights-of-way, easements, or drainage facilities owned or required by the City of Denton. 3. Upon establishing permanent ground cover or other approved permanent erosion and sediment control, all temporary erosion and sediment control devices shall be removed by the responsible party, as identified on the SWPPP. Failure to comply with this provision is considered a violation of this section.
Ask a question about Denton law
Corpus searches the Denton sections it holds and shows the ones that match, with their citations. Free, no sign-in.
