For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 7.5.3 — General Drainage Requirements

Code of Ordinances, City of Denton, Texas (Supp. No. 37, Update 1: codified through Ordinance No. 26-296 adopted March 24, 2026) · Denton Development Code subch. 7, § 7.5.3

Corpus is an independent public-information project, not the official City of Denton website. Stable reference: corpuslaw.us/code/edf670ec-3fbc-40d1-a47a-6181cfdeb163

7.5.3 - General Drainage Requirements.

A. Stormwater Design Criteria Manual Adopted. In addition to meeting the requirements expressly set out in this DDC, all drainage systems shall comply with the Stormwater Design Criteria Manual. B. Drainage Computation Data. 1. Design standards for drainage facilities and improvements shall be based on hydraulic and hydrologic computation data submitted and approved by the City Engineer, or designee, prior to submission of the final plat. 2. The City Engineer, or designee, may specify the form and manner in which the necessary data is to be submitted. C. Separation of Stormwater and Sanitary Sewerage Systems. 1. Stormwater and sanitary sewerage systems are to be used and maintained as separate systems. 2. Drainage facilities shall be designed so they do not connect, direct, or allow stormwater into the sanitary sewerage system. D. Drainage Improvements Required. 1. All developments shall provide for new drainage facilities, improvements to existing drainage facilities, channel improvements, grading, driveway adjustments, culvert improvements, or any other improvement, drainage facility, or work that is necessary to provide for the stormwater drainage needs of a development, including but not limited to work that is necessary to: a. Provide for the conveyance of all stormwater from the development when fully developed to an adequate discharge point; b. Fulfill any purpose for which the requirements of this section are imposed; c. Adequately protect the development from flooding, including the effects of the 100-year flood; d. Properly control any increase in the upstream or downstream stage, concentration, or water surface elevation caused by the development; or e. Provide for the conveyance of off-site storm drainage based on ultimate developed watershed conditions through the development. 2. Such improvements shall be in accordance with the requirements and design standards of this section. E. Off-Site Drainage. 1. Off-site drainage facilities and improvements shall be provided by the permittee whenever additional stormwater runoff from the development would adversely affect any off-site property or overload an existing drainage facility, whether natural or manmade. 2. Where stormwater runoff from three or more acres has been collected or concentrated to one point, it shall not be discharged onto adjacent properties, except into existing streams, channels, or storm drains, unless drainage or flowage easements are obtained from those properties. 3. If the permittee cannot obtain the necessary easements to make required off-site drainage improvements, upon the request of the permittee after compliance with the provisions of this DDC, the city may, but shall not be required to, initiate eminent domain proceedings to obtain the off-site drainage easements. F. Detention Facilities. All detention facilities, whether maintained by the city, private property owner, home owners association, or private entity, shall comply with any applicable design requirements of the city and any state or federal laws or regulations, as amended, including the regulations of the Texas Commission on Environmental Quality (TCEQ) or its successor agency. The following standards shall apply to all detention facilities, to the extent they do not conflict with any applicable federal or state laws or regulations, as amended: 1. The 100-year flood shall be used to determine the volume of detention storage required. Water quality volume shall be designed per the Stormwater Design Criteria Manual. 2. Detention facilities shall be designed so that any additional runoff generated by the proposed development will not increase the amount of original discharge for storm frequencies from the 1-year, 25-year, and 100-year flood; 3. Publicly dedicated or privately maintained detention facilities may be used to reduce peak discharges where conditions prevent conveying stormwater to an adequate discharge point or studies show that off-site structural facilities will not mitigate hydraulic effects more efficiently; 4. All detention facilities shall comply with the standards of this section and the Stormwater Design Criteria Manual, as amended; 5. A development may provide for drainage by participating in the design and construction of a regional detention facility. Detailed engineering studies of the entire basin shall be required to ensure that the timing of peak flows has not been altered to create higher peak flows elsewhere in the basin; and 6. Detention facilities may be constructed in phases, if phased to provide for the timely needs of the development. G. Flood Damage Prevention. All developments regulated by this DDC shall be subject to and comply with any applicable provision of FEMA Flood Damage and Prevention Regulations and the Municipal Code of Ordinances, Subpart B, Chapter 30: Flood Prevention and Protection Ordinance. H. Floodplain Reclamation-Engineering Criteria. 1. Water Surface Elevation. a. Alterations of the floodplain shall not result in an increase in the 100-year fully developed watershed water surface elevation on other properties under separate ownership. b. Alteration of the floodplain that could result in any degree of increased flooding to other properties, adjacent, upstream, or downstream is prohibited. 2. Stream Velocity. a. Alterations of the floodplain shall not create an erosive water velocity on- or off-site. The mean velocity of stream flow at the site, after fill, shall be no greater than the mean velocity of the stream flow under existing conditions. b. Alteration to the flood plain that would increase velocities of flood waters to the extent that the significant erosion of flood plain soils will occur either on the subject property or on other properties up or downstream is prohibited. c. City staff shall determine what constitutes an "erosive" velocity based on analysis of the surface material and permissible velocities for specific cross-sections affected by the proposed alteration, using criteria established in the Stormwater Design Criteria Manual. 3. Valley Storage. a. Encroachments and/or channelization is strongly discouraged along Pecan, Cooper, Hickory Creek, Milam, and Clear Creeks to prevent the reduction of storage capacity of streams and drainage ways and to prevent increasing discharges downstream. b. The city restricts the valley storage loss to zero percent reduction for all streams serving with a drainage basin of one square mile or greater in the city. For minor tributaries (drainage basins with less than one square mile), a 15 percent maximum reduction in valley storage shall be allowed. 4. Conveyance. Alterations of the flood plain shall be permitted only to the extent permitted by equal conveyance on both sides of the natural channel. Staff's calculation of the impact of the proposed alteration shall be based on the "equal conveyance" principle in order to insure equitable treatment for all property owners. Under equal conveyance, if the city allows a change in the flood carrying capacity (capacity to carry a particular volume of water per unit of time) on one side of the stream due to a proposed alteration of the flood plain, it shall also allow an equal change to the owner on the other side. The combined change in flood carrying capacity, due to the proposed alteration, plus corresponding alteration to the other side of the stream, shall not cause either an increase in flood elevation or an erosive velocity, or violate the other criteria. I. Floodplains. Where regulations within this section require a development to make any drainage improvements in or adjacent to a floodplain to provide for the ultimate base flood, the permittee may, in lieu of making the required improvements, restrict development in the area subject to flooding because of the failure to provide for the drainage improvements. In such cases, the area to be left undeveloped shall be dedicated to the public as a floodplain and drainage easement on the final plat. 1. Floodplain Restrictions. a. Development is prohibited within the floodplain of any stream or water course with a contributing drainage area of one square mile or more. These floodplain areas shall be preserved from all destruction or damage resulting from clearing, grading, or dumping of earth, waste or material, or stumps. Modifications of this requirement shall be considered by the Floodplain Administrator. b. The purpose of a floodplain easement is to preserve open space in an area subject to riverine flooding. Construction of new buildings within floodplain easements is prohibited. Filling, grading, or other activities that obstruct flood flows or remove flood storage are prohibited in floodplain easements. Floodplain easement regulations listed in this section also apply to drainage easements dedicated for the purpose of preserving floodplain areas as open space. c. New fences shall not be permitted within the floodplain, regardless of whether or not there is a drainage easement. The Floodplain Administrator may approve exceptions to this prohibition for specific sites where adequate mitigation measures are provided, as determined by the Floodplain Administrator, such as provision of a breakaway area. 2. Stream Restrictions. Major streams (those with a contributing drainage area of one square mile or more) shall remain in open natural condition; smaller streams or drainage ways (contributing drainage area less than one square mile) may be channelized if allowed by Section 7.4: Environmentally Sensitive Areas, and provided they meet the criteria of the Stormwater Design Criteria Manual. When a stream or excavated channel is to remain open, or in its natural condition, it shall meet one of the following requirements: a. Dedication, Ownership, and Maintenance Requirements. i. For single-family residential subdivisions where more than 50 percent of the lots are less than one-half acre in size, dedication of the stream or drainage way shall be made to the city or to an approved homeowner association (HOA). ii. A drainage or floodplain easement shall be dedicated as a single lot to the city, a homeowners association, or other legal entity as allowed by this subsection. iii. The Planning and Zoning Commission may waive this dedication requirement for the following reasons: a. Replats which were originally platted prior to the dedication requirement. b. Subdivisions of five lots or less. iv. Streams and drainage ways may be retained as a part of a nonresidential lot, and it shall be the property owner's responsibility to maintain this area as set forth by easement, except as otherwise provided. v. A maintenance easement shall be granted to the city and shall grant the right but not the obligation to maintain and construct drainage facilities if the stream or drainage way is not being properly maintained. vi. The maintenance entity's by-laws and covenants filed of record shall provide for ongoing maintenance. The easement shall authorize a lien against individual abutting lots in favor of the city to secure the payment to the city for any expenses incurred by the city in the event of default or to secure payment for any expenses incurred if the maintenance entity is not properly maintaining the stream or drainage way. vii. Adequate floodplain and drainage easements shall be required that give the city the right but not the obligation to maintain and construct drainage facilities if, in the city's sole opinion, the maintenance entity is not properly maintaining the stream or drainage way. viii. Where the city has designated a floodway or floodplain as part of the city park system, the permittee shall provide access by one of the following methods. In all cases, the city shall approve the proposed street alignment fronting on city parks as required for this purpose: a. Parallel streets fronting along the park; or b. Courtyard or cul-de-sac streets that provide public access fronting on the park; or c. Loop streets that provide public access fronting on the park. 3. Minimum Finished Floor Elevations. a. Minimum finished floor elevations, the datum used, and the source of the elevation information shall be labeled on the final plat where required. Vertical datum used for minimum finished floor elevations shall be the same as the datum used to establish 100-year base flood elevations. b. The city reserves the right to specify a new or revised minimum finished floor elevation at the time of issuance of a building permit if new or more accurate information, as determined by the Floodplain Administrator, warrants the change. This minimum finish floor elevation shall apply to the building foundation, including basements, and electrical and mechanical equipment. c. Minimum lot and habitable space for lots within the 100-year base flood, abutting the 100-year base flood, or within 200 feet of the 100-year base flood shall be established as follows: i. For lots adjacent to a stream without Base Flood Elevations (BFE's) identified on the official FEMA Flood Insurance Rate Maps, any habitable structure shall have a finished floor elevation at least 18 inches above the 100-year base flood elevation based on fully developed conditions. This shall apply to all rivers or streams regardless of whether the 100-year floodplain is shown on the FEMA map. ii. For lots adjacent to a stream with Base Flood Elevations (BFE's) identified on the official FEMA Flood Insurance Rate Maps, any habitable structure shall have a finished floor elevation at least 18 inches above the 100-year base flood elevation based on fully developed conditions, or at least 30 inches above the FEMA Base Flood Elevation. J. Floodways and Improvements. 1. Generally, floodways serving drainage areas larger than one square mile in area and that are still functioning primarily in a natural and adequate state shall not be altered or improved to provide for the drainage needs of a development, unless there is no other reasonable means or method to provide for such drainage. 2. As part of required improvements, debris, small brush, vines and other obstructions may be cleared from that portion of any channel located within or on the perimeter of the development, as directed by the Director of Utilities, prior to the connection of any utilities for any building within a development. 3. A development may also be required to provide clearing of off-site floodways to the extent necessary to adequately receive or convey stormwater runoff from the development, based on the roughness coefficient approved during the development review process. 4. Developments discharging stormwater runoff into a floodway shall provide grass or similar vegetation as approved by the city, on-site and off-site areas in public easements, when necessary to preserve or restore any disruption to the natural state. Refer to the North Central Texas Council of Governments Integrated Stormwater Management (ISWM) technical manual on landscape for additional suggestions. 5. The vegetation requirement shall apply to any portion of any floodway, on-site or off-site, that would be affected by runoff from the development. K. Channel Requirements. Required channel improvements shall be based on the amount and concentration of the stormwater runoff from the development. All developments shall provide for the permanent improvement and modification of existing drainage system channels or dedication of floodplain areas based on flood conditions as necessary to serve the development, subject to and in accordance with the following: 1. Channels that serve as floodways having a drainage basin one square mile or larger shall be maintained in a natural state, as provided for in this section. 2. Channels serving a development shall contain the 100-year base flood with at least one foot of freeboard. 3. Excavated channels shall have a concrete pilot channel, if deemed necessary by the Drainage Department, for access or erosion control as outlined in the specifications of the Stormwater Design Criteria Manual. Locations where earth channel improvements are required to carry a flood discharge through an undeveloped area of the off-site property channel grade may be "daylighted" and no freeboard required until the area is developed. 4. The design for all open channels shall be based on geotechnical investigations, unless determined to be unnecessary by the City Engineer, or designee. 5. No development shall be designed to access a public street across a channel without providing adequate clearance for the channel under design storm conditions as required by the Stormwater Criteria Manual. No public access to a public street by means of a low water crossing will be permitted. 6. Bridges crossing channels serving drainage areas greater than one square mile in area shall have one foot of freeboard between the 100-year base flood elevation and the lowest beam of the bridge. 7. Bridges crossing channels serving drainage areas less than one square mile in area shall have one foot of freeboard between the design water surface and the lowest top of road elevation of the bridge. 8. All culvert crossings shall have two feet of freeboard between the 100-year base flood elevation and top-of-curb elevation. L. Lot Drainage. 1. Generally, each lot shall be designed or graded to direct stormwater into an abutting street, alley, channel, or inlet. If drainage is provided in the rear of any lot by a surface or underground storm drainage system, the surface or underground drainage system shall be designed to convey runoff from the 100-year storm event. 2. Where it is not practical to provide abutting drainage facilities for each lot, drainage facilities such as a closed pipe system or drainage ditch, shall generally be required whenever the cumulative stormwater runoff from more than two lots is directed across a third lot or when the facilities are necessary to avoid an adverse effect on any other lot. 3. It shall be unlawful for any person to fill, modify or otherwise obstruct any public drainage easement designed or used as an overflow channel or structure. M. Site Erosion Control. 1. To minimize erosion resulting from the removal of vegetation and to reduce the introduction of erosion materials into the storm drainage systems, all developments and any person undertaking any development activity shall make use of erosion and sediment control devices in accordance with the requirements of the Stormwater Design Criteria Manual and the iSWM Water Quality Technical Manual. 2. The erosion and sediment control devices shall be installed and thereafter maintained until sufficient vegetation cover has been provided or been replaced to control erosion and sediment. N. Easements. In addition to any other provisions of this DDC relating to easements for public improvements, the following requirements for public drainage improvements, channels, and facilities required for any development shall apply: 1. All public drainage systems and facilities, that are not to be included within an existing or proposed public street right-of-way, shall be located within easements to be dedicated to the city and shall have adequate access to a public street. 2. Prior to acceptance of any public drainage facilities, all easements within which the facilities are located shall be cleared of all buildings, structures, fences or other obstacles that would interfere with access to the easements. 3. Restrictions of easements shall be described on the final plat and approved by the city. 4. Drainage easements through residential lots shall be placed entirely on one lot. Split lot easements shall not be allowed. 5. Structures, eaves and overhangs, fences, storage sheds, decks, pools, landscaping or other aboveground man-made improvements shall not be permitted in drainage easements or floodplains, except as specifically allowed in the Stormwater Design Criteria Manual. This provision includes, but is not limited to areas encompassing floodplain, channels, flumes, natural streams or swales, or any other system used to convey storm water through surface flow, regardless of whether or not there is an easement. O. Payment in Lieu of Improvements. Any development required to provide drainage facilities or improvements in accordance with this section may elect to pay the city the total construction cost of the required facilities or improvements, excluding engineering and design cost, when: 1. The city's approved Capital Improvement Plan proposes to provide, within two years of the date the required improvements are to be undertaken, for the same or similar drainage improvements that would make the drainage improvements required by the development unnecessary; 2. Failure to provide the drainage improvements at the time of development would not adversely affect the development or any off-site properties, as determined by the City Engineer, or designee; and 3. The payment allowed in this subsection shall be made prior to beginning any construction of the development. If the money paid to the city is not used for the required improvements within five years of payment; the funds shall be returned to the person making the payment.

Ask a question about Denton law

Corpus searches the Denton sections it holds and shows the ones that match, with their citations. Free, no sign-in.