7.3.6 - Compliance Required.

A. The city may deny the approval of any clearing and grading permit, building permit, site development plan, and any other city approval necessary to commence or continue construction or to assume occupancy, on the grounds that site erosion or sediment controls are determined not to reduce the discharge or sediment, silt, earth, soil, or other materials associated with land disturbances to the maximum extent practicable. B. Any person who violates any provision of this section shall be deemed guilty of a violation of this DDC punishable in accordance with Section 1.6, Enforcement, and the following standards: 1. The cure period will be established by the Director, and will generally not be less than 24 hours unless the alleged failure represents a risk of destruction of property or injury to persons. 2. The cure period may be extended for inclement weather or other factors at the discretion of the Director. 3. If the permittee does not cure the alleged failure within the time frame specified by the Director, the city may: a. Notify the TCEQ and request that the TCEQ take appropriate action; and b. Issue a Stop Work Order and may enforce the penalty provision of Section 1.6: Enforcement, against the permittee or site operator, or both. 4. Should the permittee fail in any respect to fulfill the requirements of this section, the city may go onto the property in question and perform such work as may be necessary to fulfill such requirements, including, but not limited to, leveling grounds, establishing temporary stabilization, constructing erosion controls, and removing all soil, rock, debris, and other materials not suitable for fill at the permittee's expense. The city shall bill the permittee for the expenses incurred. If the permittee fails to pay the city for such expenses within 30 days of being billed for same, the city shall have the right to place a lien on the property for all amounts expended by the city, plus interest at the current lawful rate. C. The remedies provided by this section are in addition to any other remedies described in this DDC. Exercise of any remedy shall not be a bar against, nor a prerequisite for, taking other action against the violator, including civil enforcement remedies.

Ask a question about Denton law

Corpus searches the Denton sections it holds and shows the ones that match, with their citations. Free, no sign-in.