§ 8.4.10 — Adequate Water System
Code of Ordinances, City of Denton, Texas (Supp. No. 37, Update 1: codified through Ordinance No. 26-296 adopted March 24, 2026) · Denton Development Code subch. 8, § 8.4.10
Corpus is an independent public-information project, not the official City of Denton website. Stable reference: corpuslaw.us/code/cd86298c-c072-4888-819c-203db91f46ed
8.4.10 - Adequate Water System.
A. Generally. 1. The applicant shall demonstrate that the water system serving the development will be adequate to serve the development at the time of preliminary plat approval for development within the city limits, or at the time of final plat approval for developments within the city's extraterritorial jurisdiction. 2. Where a development plan or phased preliminary plat is proposed, the applicant shall demonstrate that each phase of the development will be served by an adequate water system under this standard. 3. The approach main shall be extended to serve the entire development subject to a development plan or phased preliminary plat prior to the time of final plat approval for the second phase of the development plan or phased preliminary plat, unless the extension is part of a funded capital improvement project that the City has initiated consistent with its adopted Capital Improvement Plan for water facilities. B. Criteria for Adequate Facilities. The water system serving the subdivision shall be deemed adequate when in conformance with Section 7.6: Water and Wastewater, and one of the following options, as applicable: 1. City Facilities Not Used. a. Where the city is not the supplier, the applicant shall provide assurance of sufficient capacity, in accordance with the water capacity standards in the Administrative Criteria Manual, from the entity holding the certificate of convenience and necessity for the land to be subdivided. b. Such entity shall have sufficient water supply, water treatment, and transmission capacity to serve the development, considering all other commitments, in accordance with city standards. c. The applicant shall present written verification from the water supplier that it has agreed to provide water service to the development in conformance with Denton design and construction standards. The applicant shall provide assurances that water mains will be extended to serve the subdivision prior to the time of final plat approval for the second phase of a development plan or phased preliminary plat. 2. City Facilities are Used. a. Where city distribution mains are to be used for supplying water, and there is an existing distribution main with adequate capacity to serve the development within one mile of the boundary of the proposed subdivision, the applicant may, at his initial expense, and subject to standard city participation policies, extend one or more approach mains from the existing distribution main to the subdivision, of a size sufficient to serve the development. b. The city reserves the right to require oversizing of the line in accordance with standard City of Denton oversize policies. This requirement does not apply where the approach main is already a component of a funded capital improvement project that the city has initiated, consistent with its adopted Capital Improvement Plan for water facilities. C. Water and Sewer Utilities Connections. The city shall not provide any water or sewer utility connection to land proposed for subdivision under this DDC until all of the following requirements have been met: 1. The water supply, treatment, storage and off-site distribution system to serve the subdivision meet the requirements of Subsection 8.4.10; 2. The sanitary sewer treatment and collection system to serve the subdivision meet the requirements of Subsection 8.4.11; 3. The owner or developer of the subdivision or addition has executed a written agreement with the city, providing for the offsite extension of water and sewer mains to serve the development, in accordance with the existing water and sewer extension regulations; 4. Off-site mains have been extended to the subdivision pursuant to the agreement and this section, and water and sewer mains have been installed in accordance with the city's specification in the block facing the street on which the property is situated and accepted by the City; and 5. "As built" plans in digital format are required at the end of construction showing the actual location of all improvements.
Ask a question about Denton law
Corpus searches the Denton sections it holds and shows the ones that match, with their citations. Free, no sign-in.