§ 78-106 — Right-of-way restoration requirements

Code of Ordinances, City of Frisco, Texas (Frisco City Code, Home Rule Charter and Code Appendix current through Ordinance 2026-10-64 adopted October 20, 2026 (eCode360 publication FR6313, scraped 2026-11-18)) · Frisco City Code § 78-106

Corpus is an independent public-information project, not the official City of Frisco website. Stable reference: corpuslaw.us/code/2181b84c-68bf-462f-843e-a569a59c45d6

§ 78-106: Right-of-way restoration requirements.

(a) The work to be done pursuant to the permit and any repair and/or subsequent restoration of the right-of-way must be completed within the dates specified in the permit. In the event of circumstances beyond the control of the permittee or when work is prohibited by unseasonable or unreasonable conditions, the right-of-way manager may, in his sole discretion, extend the dates on receipt of a substantiated supplementary application for a permit extension. (b) All earth, materials, sidewalk, pavement, utilities, conduits, crossing, irrigation, landscaping, monuments, manhole covers, valve covers, meter box lids or improvements of any kind, which are owned or possessed by the city, and damaged, disturbed, or removed by a right-of-way user shall be fully repaired promptly by the right-of-way user, at its sole expense, to the reasonable satisfaction of the right-of-way manager. (c) After any excavation, the right-of-way user shall, at its expense, restore the right-of-way, trench envelope, pavement structure and the surrounding area, to the same or better condition than it was prior to the excavation. The restoration shall be made in accordance with specifications set forth herein, and the repair shall endure without failure for two years from the completion date of any repair. (d) In the event the right-of-way user fails to restore the right-of-way in the manner and to the condition required herein, or fails to satisfactorily and/or timely complete all restoration, the city may, at its option, serve written notice upon the right-of-way user that, unless within five days after serving of such notice a satisfactory arrangement can be made for the proper restoration of the right-of-way by the right-of-way user, the city may take over the work and prosecute same to completion, by contract or otherwise, at the sole expense of the right-of-way user, and right-of-way user, and its surety, shall be liable to the city for any and all cost incurred by the city by reason of such prosecution and completion including, without limitation, the applicable public inconvenience penalty. Nothing contained herein shall limit any other remedies available to the city. The right-of-way user's permits shall be placed on hold until the city is made whole. (e) If any excavation cannot be backfilled immediately, the right-of-way user shall securely and adequately cover the excavation and maintain proper barricades, safety fencing and/or lights as required, from the time of the opening of the excavation until the excavation is surfaced and opened for travel. (f) In all right-of-way restoration, the right-of-way user guarantees its work and shall maintain it two years from the date of completion of any restoration. During the period following completion, the right-of-way user shall, in the event of any failure of the restoration, and upon notification from the right-of-way manager, reimburse the city for pavement restoration costs as provided for in this article. Additionally, the right-of-way user, in the event of such failure, shall within 48 hours of notice from the city, repair the subject trench envelope. (g) The two-year guarantee period shall be applicable to, among others, failure of the pavement surface as well as failure of the trench envelope. Notwithstanding remediation of the pavement structure by the city, the right-of-way user retains repair responsibility at all times during the guarantee period for the trench envelope. In locations where two or more right-of-way users have made repairs in the exact same location, the last right-of-way user to excavate shall be responsible for the two-year guarantee in that location, unless the right-of-way manager determines, in his sole discretion, that a failure was most likely a result of work performed by another right-of-way user. That right-of-way user shall be responsible for the two-year maintenance period. (h) All street excavations shall be perpendicular excavations, unless otherwise approved by the right-of-way manager. Excavations in streets, which are not perpendicular excavations require block-to-block and curb-to-curb pavement reconstruction, or other method of repair approved by the right-of-way manager. All repairs shall be equal or better than that which existed prior to the commencement of any work. (i) No trench shall be opened for the purpose of laying pipes, conduits or ducts for a distance greater than can be backfilled on the same workday before sunset. Any variance from this requirement must be granted in writing from the right-of-way manager prior to work beginning. (j) The city shall have no liability or responsibility for repairing, restoring or replacing any improvements or facilities located in the right-of-way that suffer damage, in whole or in part, as a result of any construction, excavation or other project, including those improvements or facilities that are so located without a permit, consent or other approval from the city. Nothing in this article requires a right-of-way user to replace any landscaping, other than grass, placed in the right-of-way outside of a dedicated easement authorizing the landscaping to be placed in the affected area.

( Ordinance 02-05-65 , sec. 3(2.34), adopted 5/7/02 ; Ordinance 2022-11-63 adopted 11/15/2022 ; Ordinance 2025-05-30 adopted 5/20/2025 )