§ 78-99 — Site maintenance during construction and prior to full restoration
Code of Ordinances, City of Frisco, Texas (Frisco City Code, Home Rule Charter and Code Appendix current through Ordinance 2026-10-64 adopted October 20, 2026 (eCode360 publication FR6313, scraped 2026-11-18)) · Frisco City Code § 78-99
Corpus is an independent public-information project, not the official City of Frisco website. Stable reference: corpuslaw.us/code/a4738122-3093-48d9-9762-e39221a7412e
§ 78-99: Site maintenance during construction and prior to full restoration.
(a) Erosion control and stormwater management. The right-of-way user shall be responsible for stormwater management, erosion control and excavation safety measures that comply with city, state and federal guidelines. Requirements shall include, but not limited to, construction fencing around any excavation that will be left overnight, silt fencing in erosion areas until reasonable vegetation is established, barricade fencing around open holes, high erosion areas will require wire backed silt fencing and the removal of slurry used when running boring equipment. Upon request of right-of-way manager, the right-of-way user may be required to furnish documentation submitted or received from the federal or state government. (b) Dust control. The right-of-way user shall ensure that the work is conducted and site maintained to minimize blowing dust. At any time dust leaves the job site so that it is a nuisance, the work will stop until measures can be taken to eliminate the dust. (c) Traffic control safety. In the event of noncompliance with the TMUTCD, the right-of-way user shall be notified of the violation. In the event of continued noncompliance, the right-of-way manager may revoke the permit, in addition to any other remedies available to the city. At any time the right-of-way manager determines the work threatens public safety, he may take immediate action as necessary including but not limited to, stopping all work, or have a third party make the repairs at the expense of the applicant. (d) Responsibility for signs, barricades and warning devices. The right-of-way user working in any right-of-way is responsible for the safe movement of traffic, both pedestrian and vehicular, through the construction area. The right-of-way user shall meet all requirements for barricading and traffic control as specified in the TMUTCD. (1) Only those individuals who are qualified by means of adequate training in safe traffic control practices and have a basic understanding of the principles established by applicable standards and regulations, including without limitation, those in TMUTCD, may place and maintain the traffic control devices in a construction area. (2) The right-of-way user must either: (A) subcontract the barricading to a firm specializing in traffic control; or (B) submit the qualifications and name of employees to the right-of-way user manager for approval prior to the work commencing. The right-of-way user must also submit a traffic-control plan for review and approval by a city traffic engineer when required by this article. All signs and barricades must conform to the requirements of the TMUTCD. (3) All barricades, plates, and other traffic control equipment must conform to TMUTCD specifications and must be inspected and maintained by the traffic control representative. (4) All barricades, plates and other traffic control equipment must display accurate and sufficient information including without limitation, the name of the right-of-way user. (5) Noncompliance with the TMUTCD shall be cited in writing. In the event of noncompliance after citation, the right-of-way manager may place the necessary devices as required, and the right-of-way user shall reimburse the city for all such expenses as well as $500.00 for noncompliance. Failure to comply with this provision may result in denial of application for future permits. (6) All traffic control devices must be removed immediately upon completion of work. (7) Streets shall be restored to existing conditions or better within twenty-one calendar days from the date that a portion of the street is closed and/or opened to traffic by using a steel roadway plate unless the right-of-way manager grants approval to extend the required time period. (e) Duty to barricade. At all times during construction activity, the contractor and/or right-of-way user, as applicable, shall place and maintain all necessary and proper barriers and other safeguards, including without limitation, watchmen certified in accordance with the safety training described in this article, if necessary, upon and around the work and for the prevention of accidents, and after daylight hours, shall place, maintain and keep suitable sufficient lights, in accordance with the TMUTCD.
( Ordinance 02-05-65 , sec. 3(2.27), adopted 5/7/02 ; Ordinance 2022-11-63 adopted 11/15/2022 )
Ask a question about Frisco law
Corpus searches the Frisco sections it holds and shows the ones that match, with their citations. Free, no sign-in.
