§ 3.85 — Grading & Drainage
Code of Ordinances of the City of Garland, Texas (Garland Code of Ordinances, Home Rule Charter and Garland Development Code current through Ordinance 7697 adopted August 17, 2026 (eCode360 publication GA6318, scraped 2026-11-17)) · Garland Development Code § 3.85
Corpus is an independent public-information project, not the official City of Garland website. Stable reference: corpuslaw.us/code/7a9e8ae2-fe83-4007-b7dc-40047cf518d1
§ 3.85: Grading & Drainage.
(A) General. No person shall alter, change, modify, excavate or fill any lot, subdivision or development in a manner that causes a material adverse impact from surface runoff or stormwater to adjoining property. An appropriate plan submittal and permit from the Building Inspections Department shall be required for any land disturbing activity exceeding 5,000 square feet up to one (1) acre, or changing the grade elevation by cut or fill in excess of 1' from existing grade. Disturbance of over one acre shall require Site Engineering Drawings, as set forth in Section 3.95 of Chapter 3 of this GDC. Any unpermitted fill piles shall be removed or spread to within allowed grades within thirty (30) days of the initial pile being placed on the property. The Director of Engineering or the Building Official may require submission of proof of compliance with the provisions of this Division, certified by an engineer who is licensed in the State of Texas. (B) Improvements Required. Grading and drainage improvements must conform with the applicable provisions of this Division and with the City’s Technical Standards. Grading and drainage plans submitted to the Engineering Department shall be prepared under the direction of, and shall be sealed by, a professional engineer who is licensed in the State of Texas. (C) Plan Submittal. Grading and drainage plans for all developments shall be provided as part of the Site Engineering Drawings unless no Site Permit is required, in which case grading and drainage plans shall be submitted with the Building Permit submittal documents. If no Building Permit is required, mass grading plans shall be submitted for a Site Permit to the Engineering Department.
( Ordinance 6773 adopted 5/19/15 ; Ordinance 7055 , sec. 25, adopted 5/7/19 )
Ask a question about Garland law
Corpus searches the Garland sections it holds and shows the ones that match, with their citations. Free, no sign-in.
