For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 105-57 — Specific standards

Code of Ordinances, City of Harlingen, Texas · Harlingen Code of Ordinances § 105-57

Corpus is an independent public-information project, not the official City of Harlingen website. Stable reference: corpuslaw.us/code/7d8abb38-3f58-48b4-84f5-0ea70a18be69

§ 105-57: Specific standards.

In all areas of moderate or special flood hazards where base flood elevation data has been provided as set forth in section 105-22, section 105-42(8), or section 105-58(c), the following provisions are required: (1) Residential construction. a. Within an area of special flood hazard, new construction and substantial improvement of any residential structure shall have the lowest floor, including basement, and all components of the mechanical, electrical, and plumbing system and any other service facility elevated to at least 18 inches above the base flood elevation or 24 inches above the top of the curb, whichever is higher. b. Within a moderate flood hazard area, new construction and substantial improvement of any residential structure shall have the lowest floor, including basement, and all components of the mechanical, electrical, and plumbing systems and any other facility elevated to at least 12 inches above the base flood elevation or 18 inches above the top of the curb, whichever is higher. (2) Nonresidential construction. New construction and substantial improvements of any commercial, industrial or other nonresidential structure shall either have the lowest floor (including basement) elevated to 18 inches above the base flood elevation or together with attendant utility and sanitary facilities, be designed so that below the base flood level the structure is watertight with walls substantially impermeable to the passage of water and with structural components having the capability of resisting hydrostatic and hydrodynamic loads and the effects of buoyancy. A registered professional engineer or architect shall develop and/or review structural design, specifications, and plans for the construction, and shall certify that the design and methods of construction are in accordance with accepted standards of practice as outlined in this subsection. A record of such certification which includes the specific elevation (in relation to mean sea level) to which such structures are floodproofed shall be maintained by the Floodplain Administrator. (3) Critical facilities. Construction and substantial improvement of any critical facility, such as EMS, fire department, and police department, shall have the lowest floor (including basement and all essential plumbing and utilities, including duct work), elevated to or above the regulatory flood datum or the 500-year floodplain elevation, whichever is higher in elevation. A registered Professional Engineer, Architect, or Land Surveyor shall submit a certification to the Floodplain Administrator that the standard of this subsection as proposed in section 105-43(a) is satisfied. (4) Enclosures. New construction and substantial improvements, with fully enclosed areas below the lowest floor that are usable solely for parking of vehicles, building access or storage in an area other than a basement and which are subject to flooding shall be designed to automatically equalize hydrostatic flood forces on exterior walls by allowing for the entry and exit of floodwaters. Designs for meeting this requirement must either be certified by a registered professional engineer or architect or meet or exceed the following minimum criteria: a. A minimum of two openings on separate walls having a total net area of not less than one square inch for every square foot of enclosed area subject to flooding shall be provided. b. The bottom of all openings shall be no higher than one foot above grade. c. Openings may be equipped with screens, louvers, valves, or other coverings or devices provided that they permit the automatic entry and exit of floodwaters. (5) Manufactured homes. a. All manufactured homes to be placed within Zone A on a community's FHBM or FIRM shall be installed using methods and practices which minimize flood damage. For the purposes of this requirement, manufactured homes must be elevated and anchored to resist flotation, collapse, or lateral movement. Methods of anchoring may include, but are not limited to, use of over-the-top or frame ties to ground anchors. This requirement is in addition to applicable state and local anchoring requirements for resisting wind forces. b. All manufactured homes that are placed or substantially improved within Zones A1-30, AH, and AE on the community's FIRM on sites (i) outside of a manufactured home park or subdivision, (ii) in a new manufactured home park or subdivision, (iii) in an expansion to an existing manufactured home park or subdivision, or (iv) in an existing manufactured home park or subdivision on which a manufactured home has incurred "substantial damage" as a result of a flood, shall be elevated on a permanent foundation such that the lowest floor of the manufactured home is elevated to or above the base flood elevation and be securely anchored to an adequately anchored foundation system to resist flotation, collapse, and lateral movement. 1. If located in a flood hazard area, the lowest floor (including basement) will be one foot above the peak water surface elevation established by the FIRM; 2. One foot above the top of the curb (or top of crown) of the nearest adjacent street; or 3. One foot above the 500-year 24-hour base floor elevation; whichever is greatest. c. Require that manufactured homes be placed or substantially improved on sites in an existing manufactured home park or subdivision with Zones A1-30, AH and AE on the community's FIRM that are not subject to the provisions of subsection (4) of this section be elevated so that either: 1. The lowest floor of the manufactured home is at or above the base flood elevation, or 2. The manufactured home chassis is supported by reinforced piers or other foundation elements of at least equivalent strength that are no less than 36 inches in height above grade and be securely anchored to an adequately anchored foundation system to resist flotation, collapse, and lateral movement. (6) Recreational vehicles. All recreational vehicles placed on sites within Zones A1-30, AH, and AE on the community's FIRM shall either (i) be on the site for fewer than 180 consecutive days, or (ii) be fully licensed and ready for highway use, or (iii) elevated and anchored to resist flotation, collapse, or lateral movement. Methods of anchoring may include, but are not limited to, use of over-the-top or frame ties to ground anchors. This requirement is in addition to applicable state and local anchoring requirements for resisting wind forces. A recreational vehicle is ready for highway use if it is on its wheels or jacking system, is attached to the site only by quick disconnect type utilities and security devices and has no permanently attached additions. (7) Prohibited uses. The following uses are prohibited within a designated floodplain: a. Storage or processing of materials that are hazardous, flammable, or explosive in the identified special flood hazard area. b. Storage of material or equipment that, in times of flooding, could become buoyant and pose an obstruction to flow in identified floodway areas. c. No floodplain development permit shall be approved for any structure or parking area that encroaches on an area of special flood hazard unless: 1. The parking area is smaller than 5,000 square feet; or 2. The structure is unoccupied and has an area of less than 1,000 square feet; 3. The lowest finished floor elevation of the structure is elevated to or above the regulatory flood datum. 4. The maximum proposed density and building coverage are half of the amount otherwise allowed in the property's base zoning district. d. No fill material shall be used to elevated any structure in Zones A, A1-30, AE, AO, AH, AR, or A99, unless: 1. The fill material is compacted to not less than 95 percent of the maximum dry density conforming to Texas Department of Transportation Test Method TEX-114-E, "Laboratory Compaction Characteristics and Moisture-Density Relationship of Subgrade and Embankment Soil"; 2. The fill material is comprised of fine grained soils of low permeability, such as those classified as CH, CL, SC, or ML according to ASTM Standard D-2487, "Standard Practice for Classification of Soils for Engineering Purposes (Unified Soil Classification System)"; and 3. The fill material is homogeneous and isotropic (specifically, that the soil is all of one material and the engineering properties are the same in all directions). (8) Elevation certificate. An Elevation Certificate is required for all new development and substantial improvements regulated by this chapter. All elevation requirements noted in this chapter shall be documented using the NFIP Elevation Certificate, FEMA Form 086-0-33, as amended, which shall be certified by a registered Professional Engineer. Architect, or Land Surveyor, and submitted to the Floodplain Administrator.

( Ordinance 2026-38 adopted 8/19/2026 )

Ask a question about Harlingen law

Corpus searches the Harlingen sections it holds and shows the ones that match, with their citations. Free, no sign-in.