§ 109-128 — Construction documents and construction inspection

Code of Ordinances, City of Harlingen, Texas · Harlingen Code of Ordinances § 109-128

Corpus is an independent public-information project, not the official City of Harlingen website. Stable reference: corpuslaw.us/code/226a5afa-9c9a-4f0e-94ea-0c33ddc13c8c

§ 109-128: Construction documents and construction inspection.

(a) Review process. The city engineer's office shall review the construction plans for conformance to subdivision regulations for roadways and drainage improvements. The Harlingen Waterworks Engineer's Office shall also review the construction plans for general conformance to TCEQ and HWWS requirements for water and wastewater improvements. This review shall be for conformance to subdivision regulations and the responsibility and liability for the adequacy of the design shall remain with the engineer sealing the documents. (b) Subdivision construction document submission process. Construction documents shall be produced by an engineer or surveyor as applicable and shall be submitted in a format as directed by the city engineer and HWWS to the department of planning and development. Content and submittal information shall conform to the city subdivision development guide. This manual is available online at the city website. (c) Construction inspection. At all times throughout the construction process, the city shall be provided reasonable access to any areas where public improvements are being constructed. (1) During construction of the subdivision improvements, periodic inspection of the quantities and quality of workmanship of the construction shall be provided by the city to oversee compliance with the plans and specifications, as provided, for those improvements that will be dedicated for public use. (2) The developer shall ensure that the construction contractor notifies the engineering department and HWWS (as applicable for water and sewer infrastructure) of all key construction activities, milestones, and testing appointments to allow for the witnessing of said activities by city inspection personnel. A minimum time of 24-hours preceding the event or as coordinated through the city or HWWS inspector shall be required for all notifications. Inspections are to be scheduled during normal business hours Monday through Friday 8:00 a.m. to 4:00 p.m. (3) All geotechnical and other testing shall be paid for by the developer. Copies of all test reports shall be provided to the city engineer and HWWS (as applicable). The city reserves the right to hire the geotechnical firm to undertake the subdivision's testing or for additional testing. Materials installed by the developer must meet the requirements in the specifications or as approved by the city engineer or HWWS (as applicable). The developer's geotechnical engineering firm must be approved by the city. (4) Any field modifications shall be immediately reported to the city engineer, HWWS (as applicable) or their respective inspection personnel and a record of all field changes shall be kept by the contractor on-site. Final acceptance of any changes from plans and specifications shall be approved by the city engineer or HWWS (as applicable) or their duly authorized representative.

( Ordinance 2022-52 , § 1, adopted 12/21/2022 )