§ 109-129 — Final acceptance

Code of Ordinances, City of Harlingen, Texas · Harlingen Code of Ordinances § 109-129

Corpus is an independent public-information project, not the official City of Harlingen website. Stable reference: corpuslaw.us/code/2fa511af-57cf-4bd9-8c6c-a64d77626cd3

§ 109-129: Final acceptance.

Upon completion of construction, a request for final inspection walk through shall be submitted. After final inspection by city inspection personnel, and having satisfied the final punch list with all pending items complete to the satisfaction of the city inspector, the developer and department of planning and development shall be notified in writing by the city engineer and HWWS of acceptance or rejection of the construction. Once accepted a letter of construction warranty for a minimum period of one year is required from the contractor(s) prior to final acceptance by the city and HWWS. Additional requirements prior to final acceptance include the designer's certification of completion, contractor(s) affidavit(s) and waiver of lien(s), bill of sale, the contractor(s) guarantee, submission of "as-built" drawings from a licensed surveyor, submission of "red-line" drawings from the project engineer, copies of all applicable material tickets, inspection reports, and geotechnical test reports or other items as specified by the city engineer or HWWS.

( Ordinance 2022-52 , § 1, adopted 12/21/2022 )