For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 32-47 — Definitions

Code of Ordinances of the City of Killeen, Texas (Supp. No. 38, Update 2: codified through Ordinance of 26-029, enacted August 4, 2026) · Killeen City Code § 32-47

Corpus is an independent public-information project, not the official City of Killeen website. Stable reference: corpuslaw.us/code/558bfdfb-2daf-45a2-b1a7-77198ba4ef48

Sec. 32-47. - Definitions.

Unless a provision explicitly states otherwise, the following terms and phrases, as used in this article, shall have the meanings hereinafter designated. Additionally, all references to any Federal or State regulation or act shall refer to the current regulation or act and any amendments thereto after the effective date of this ordinance. Terms not defined in the article shall be as defined in article II and article III of this chapter, unless the context clearly indicates otherwise. Applicant shallmean a property owner or agent of a property owner who has filed a stormwater management site plan. Creek Buffer Zone (CBZ) shall mean a setback established for all property located on or adjacent to a natural, vegetated, earthen or grass lined watercourse as shown on United States Geological Survey (U.S.G.S.) maps or FEMA maps in which land disturbance may be restricted due to a stream bank erosion hazard. In addition, any watercourse that is shown on the maps identified above that is not within a FEMA special flood hazard area and not having side slopes of 3:1 or steeper shall not be considered as a creek buffer zone. Any land disturbing activity in a CBZ shall comply with the Drainage Design Manual (DDM), Chapter 10 "Post-Construction Stormwater Best Management Practices." Delineation methods for CBZs are defined in the city's DDM. Detention shall mean the temporary storage of storm runoff in a stormwater management facility with the goals of controlling peak discharge rates and providing gravity settling of pollutants. Impervious cover shall mean those surfaces that do not allow the effective infiltration of rainfall or stormwater runoff into the ground (e.g., building rooftops, pavement, sidewalks, driveways, etc.). Land disturbing activity shall mean any activity including, without limitation, the clearing, grading, filling, grubbing, scraping, dredging, mining, paving, excavating, drilling or movement of land, or the construction of any building or structure, the stockpiling of soil or materials, the baring of soil or rock, the diversion or piping of any natural or man-made watercourse, or any other activity that will or may result in soil erosion from water or wind, the movement of solid materials into waters or onto adjacent lands, or that changes the volume or peak flow discharge rate of stormwater runoff from the land surface. Landowner shall mean the legal or beneficial owner of land, including those holding the right to purchase or lease the land, or any other person holding proprietary rights in the land. Maintenance easement, covenant and agreement shall mean a legally-binding and recorded document that acts as a real property easement, covenant and restriction providing for the perpetual existence and maintenance of stormwater management facilities and practices. Off-site facility shall mean a stormwater management facility located outside the subject property boundary depicted in the applicable SWSMP. On-site facility shall mean a stormwater management facility located within the subject property boundary depicted in the applicable SWSMP. Potential stormwater pollutants shall mean stormwater pollutants that may be introduced to the city's MS4 and/or waters of the State or U.S. as a result of land disturbing activity and shall include, without limitation, total suspended solids, total dissolved solids, increased temperature, fats, oils and grease, floatables (e.g. trash, rubbish, etc.), nutrients (e.g. nitrogen; phosphorus; etc.), bacteria (e.g. fecal coliform; e. coli), metals, pesticides and herbicides, and sediment (due to soil erosion). Redevelopment shall mean any construction, alteration or improvement of a site that changes the "footprint" of a site or building to an extent that triggers this article's applicability. Site disturbance permit shall mean a permit issued by the city to regulate land disturbing activities to meet the objectives of articles II, III and IV of this chapter. A site disturbance permit shall be deemed to be the same as a land disturbance permit issued under section 26-80 of this code, provided that the requirements of these various articles are met. Stormwater management shall mean the use of structural or non-structural practices and BMPs that are designed to reduce stormwater runoff pollutant loads, discharge volumes, peak flow discharge rates and detrimental changes in stream temperature that affect water quality and habitat. Stormwater management facility shall mean any facility that is built to control stormwater runoff in order to comply with the BMPs and requirements established herein. Stormwater management site plan (SWMSP) shall mean a plan that shall be included as part of the Stormwater Pollution Prevention Plan (SWPPP) for a site that describes all structural and nonstructural post-construction BMPs to be utilized to comply with this article. The SWMSP shall be submitted with the site disturbance permit in instances where a SWPPP is not required under this code. Structural control (or practice) shall mean a pollution prevention practice that requires the construction of a device, or the use of a device, to capture or prevent pollution in stormwater runoff.

(Ord. No. 12-046, § I, 8-7-12)

Ask a question about Killeen law

Corpus searches the Killeen sections it holds and shows the ones that match, with their citations. Free, no sign-in.