§ 32-48 — Stormwater management site plan

Code of Ordinances of the City of Killeen, Texas (Supp. No. 38, Update 2: codified through Ordinance of 26-029, enacted August 4, 2026) · Killeen City Code § 32-48

Corpus is an independent public-information project, not the official City of Killeen website. Stable reference: corpuslaw.us/code/f66f93ee-d7a5-46c8-88f6-3f943d13e3b7

Sec. 32-48. - Stormwater management site plan.

(a) A stormwater management site plan (SWMSP) is required for all land disturbing activities to which this article applies. (b) No application for a site disturbance permit shall be approved unless a SWMSP is submitted therewith detailing how runoff and associated water quality impacts resulting from the land disturbing activity will be controlled or managed in compliance with the requirements of this article. If a stormwater pollution prevention plan (SWPPP) or erosion and sediment control plan is required for the site, the SWMSP shall be included as a component of the SWPPP. (c) For land disturbing activities located within a CBZ that disturb less than one (1) acre of land, where a SWPPP is not required, the SWMSP shall be submitted as a separate document to the director for review and approval prior to the commencement of any land disturbing activity. (d) The SWMSP shall meet the submittal requirements outlined in the submittal checklist found in section 32-49 (b) of this article, be prepared by a certified professional and shall indicate whether stormwater will be managed on-site or off-site. The plan shall include the specific location and type of practices in order to receive consideration for BMP credit provided in this article. (e) The SWMSP shall be developed and coordinated with the drainage construction design and may be shown on the same plan sheet, if applicable. It shall also be coordinated with the landscaping construction design to prevent conflicts and assure compatible land use, if landscaping is a selected and approved BMP. (f) A site disturbance permit shall not be issued until a SWMSP has been reviewed and released by the director after determining that the plan is consistent with the requirements of this article.

(Ord. No. 12-046, § I, 8-7-12)

Ask a question about Killeen law

Corpus searches the Killeen sections it holds and shows the ones that match, with their citations. Free, no sign-in.