§ 3.1 — Construction plans

Code of Ordinances, City of Laredo, Texas (Supp. No. 23, Update 3: codified through Ordinance No. 2026-O-92, adopted May 4, 2026) · Laredo Code of Ordinances § 3.1

Corpus is an independent public-information project, not the official City of Laredo website. Stable reference: corpuslaw.us/code/1e0bda85-2626-4fec-aa04-0dc2e3216ad1

Section 3.1: - Construction plans

Prior to approval of the final plat by the Commission, the following information shall be supplied to the City Engineer, or to the Director of the Utilities Department. A. Plan-profile sheets, blue print copies 24" x 36" in size, and platted to a scale of one hundred (100) feet one (l) inch vertical for proposed street or alley in the subdivision. These plan-profiles shall show the right-of-way of the street, portions of right-of-way of intersecting streets, location of curb and gutter to monuments and the radii of all returns in the plan portion, and the location of storm water structures and pipe. The profile portion shall show the existing ground on each side of the street and the proposed grade of the top of the curb for each side of the street and the reference bench mark with its elevation. B. All improvements to be done shall be in accordance with the design standards of the City of Laredo in effect at the time of submission of the plat. Plans and calculations for storm sewers and special structures shall be submitted to the City Engineer for approval. C. The subdivider shall complete plans and specifications of any proposed improvements, streets, drainage structures, utilities, etc., and shall furnish complete plans and specifications of said construction to the City Engineer of the work to be performed by the subdivider. Plans and profiles of water and sewer utility lines shall also be furnished to Laredo Waterworks System and the Laredo Sanitary Sewer System. If any part of the proposed construction is considered unsatisfactory by the City Engineer, or the Director of the Utilities Department and below the standard required under the circumstances, construction operations shall not be started on the affected portion until alterations are made such that the completed work shall conform to the standards required by the City of Laredo. The City Engineer and the Director of the Utilities Department shall be notified prior to beginning construction so that he or his duly authorized representative may inspect said work during the construction. D. Upon the completion of construction of any such improvements, the subdivider shall furnish a final set of plans in detail to the City Engineer and the Director of the Utilities Department. These plans shall be certified by the Registered Professional Engineer preparing them to be complete and correct "as built" plans of the improvements. E. For developments greater than one-half acre total, the City Engineer shall require grading and drainage plans. For developments less than one-half acre total, the City Engineer shall require grading and drainage plans when in his judgment such are necessary to provide for and protect the public interest or that of adjoining property owners.

Ask a question about Laredo law

Corpus searches the Laredo sections it holds and shows the ones that match, with their citations. Free, no sign-in.