Section 3.5: - Laboratory testing

All materials to be used in new land development construction shall be subject to testing. The preponderance of testing to be performed in new developments is directly related to public improvement construction, and a series of laboratory tests normally associated with public improvement construction will be required in new developments. Said tests shall be performed by an independent testing laboratory using qualified personnel. The testing laboratory may be selected by the developer no more than five working days from the date of final plat approval by the Planning and Zoning Commission. Selection shall be submitted to the City Engineer in writing from a list of testing laboratories approved by the City. In the event no qualified laboratory is selected within the specified time period, the testing laboratory shall be selected by the City from the approved list on a rotational basis. Changing of laboratory firm, once selected, shall be prohibited. If unforeseen circumstances arise, and an alternative laboratory is required, the replacement laboratory shall be selected by the City Engineer from the list of approved laboratories on a rotational basis. The testing laboratory shall bill directly to the developer. It is assumed that the preponderance of testing required in the development is that testing related directly to street construction. For this reason, the following ratio of testing is established: RATIO OF TESTING: Subgrade .....Minimum 1 per 150 feet of street Under curb and gutter .....Minimum 1 per 150 feet of curb Caliche Base .....Minimum 1 per 150 feet of street Lime stabilized base .....Minimum 1 per 150 feet of street Sand base .....Minimum 1 per 150 feet of street Backfill density control .....Minimum of 10 (10) PROCTOR (MOISTURE/DENSITY RELATIONSHIP): Subgrade (new) .....1 per development, unless material changes Lime stabilized base .....1 per development, unless material changes Caliche .....1 per 5,000 cubic yards material or less ATTERBERG LIMITS AND GRADATION: Caliche .....1 per 5,000 cubic yards material Sand base .....1 per 2,500 cubic yards material HOT-MIX CONTROL: Surface course design .....1 per development Base course design .....1 per development Extractions .....2 per day run/minimum 1 per 500 ton Densities (in place) .....1 per 1,000 feet of street CONCRETE: Curb/gutter .....1 set (3) per 500 feet Sidewalk .....1 set (3) per 4,000 square feet Inlets .....1 set (3) per 6 inlets The above schedule is a minimum schedule for testing, failures are not included. In the event of failures, additional tests will be taken. If excessive rain occurs on a previously tested section, the City shall have the right to order re-testing as necessary. The contractor shall notify the City of Laredo Engineer at least twenty-four (24) hours prior that he is ready for testing, and the City's representative shall inspect the work and concur with the Contractor before testing can be authorized. The City Engineer or its representative shall notify the testing laboratory when tests are to be taken. In the event that neither the City Engineer nor its representative is available for inspection of the work within four (4) hours, the contractor may order the laboratory testing. Provided; however, in the event of failures, re-testing shall be at the contractor's expense. Except as otherwise provided above, it is the intent of the City that the contractor not contact the laboratory for the purpose of requesting routine test. The scope of materials incorporated in new development construction is not necessarily limited to those tests outlined herewith. In the event of unusual conditions or factors which may give the City reason to question the quality of the materials in any portion of the development, the City will have the right to order such tests as are necessary at the developer's expense. However, the City will consult with the project engineer on reasons for such additional tests before a testing laboratory will be asked to conduct such test. All testing in accordance with these requirements will be performed in accordance with the American Society of Testing Materials (ASTM) latest revision, and/or as elsewhere provided unapproved plans and specifications for the development. The City will require all development test reports to be certified by a Registered Professional Engineer (Texas Registration) and will further require that the City be furnished a minimum of two (2) copies of testing reports. Further, the project engineer shall provide the City for the testing laboratory a set of plans and specifications as well as a tabulation showing the estimate of quantities of material in the development.

Ask a question about Laredo law

Corpus searches the Laredo sections it holds and shows the ones that match, with their citations. Free, no sign-in.