§ 22.11.037 — Stormwater discharges from construction activity
Code of Ordinances of the City of Lubbock, Texas (Lubbock Code of Ordinances, Charter and Unified Development Code current through Ordinance 2026-O0123 adopted September 22, 2026 (eCode360 publication LU6396, scraped 2026-11-17)) · Lubbock Code of Ordinances § 22.11.037
Corpus is an independent public-information project, not the official City of Lubbock website. Stable reference: corpuslaw.us/code/ecbfa3ec-0ea5-4f1f-8a3d-8839c897bd43
§ 22.11.037: Stormwater discharges from construction activity.
(a) Applicability. This section applies to all facilities located within the city limits or otherwise subject to the regulatory authority of the City of Lubbock that have stormwater discharges associated with construction activity. (b) General requirements. (1) All operators of construction sites shall use BMP’s to control and reduce the discharge to the MS4 and to waters of the United States, of sediment, silt, earth, soil, and other material associated with the clearing, grading, excavation, and other construction activities to the MEP. (2) Operators shall minimize, to the extent practicable, the off-site vehicle tracking of sediments and the generation of dust. The SWP3 shall include a description of controls to accomplish this requirement. (3) The operator shall retain copies of any SWP3 and all reports required by this article or by the TPDES permit for the site, and records of all data used to complete the NOI, for a period of at least three years from the date that the site meets the definition of final stabilization. (c) Submission of notice of intent and/or construction site notice. (1) An operator of a construction site required to have a TPDES permit to discharge stormwater associated with construction activity shall submit a copy of the notice of intent (NOI) and construction site notice to the stormwater engineer contemporaneously with submittal of the original notice of intent to TCEQ as required by part II.E.3 of the construction general permit. (2) The operator of a construction site, which does not require an NOI, is required to submit, per TCEQ’s TPDES general permit for construction sites, a construction site notice to the operator of the municipal stormwater drainage system. (3) If relevant information provided in the NOI changes, a notice of change (NOC) must be prepared and implemented in accordance with the requirements of the construction general permit or any individual or group TPDES permit issued for stormwater discharges from the construction site. A copy of the NOC must be provided to the stormwater engineer within fourteen (14) days of discovery of the change. (4) Prior to the submittal of a notice of termination (NOT), the operator of the construction site shall first notify the stormwater engineer to request an inspection of the construction site for approval of final stabilization. After final inspection approval, the operator of the construction site shall submit to TCEQ and the stormwater engineer a notice of termination (NOT) that includes the information required by part II section F of the construction general permit. (5) If there is a transfer of ownership from the applicant to an owner occupant of a residential lot covered by a TPDES permit than a final inspection will be required. The applicant will also be required to submit documentation that the resident has been made aware of the requirements for proper stabilization of any remaining unstabilized portion of the residential lot. (6) The copy of the notice of intent and/or construction site notice may be delivered to the stormwater engineer either in person or by mailing it to: Notice of Intent to Discharge StormwaterStormwater Management DepartmentPO Box 2000Lubbock, Texas 79457
( 1983 Code, sec. 30-57 ; Ordinance 2008-O0095 , sec. 1, adopted 11/20/2008 )