§ 22.11.038 — Stormwater discharges from industrial activity
Code of Ordinances of the City of Lubbock, Texas (Lubbock Code of Ordinances, Charter and Unified Development Code current through Ordinance 2026-O0123 adopted September 22, 2026 (eCode360 publication LU6396, scraped 2026-11-17)) · Lubbock Code of Ordinances § 22.11.038
Corpus is an independent public-information project, not the official City of Lubbock website. Stable reference: corpuslaw.us/code/75cf81b5-bae8-4ad6-b6d9-b097a6d8f963
§ 22.11.038: Stormwater discharges from industrial activity.
(a) Applicability. This section applies to all facilities located within the city limits, or that are otherwise subject to the regulatory authority of the City of Lubbock, that have stormwater discharges associated with industrial activity. (b) General requirements. All operators of (1) municipal landfills; (2) other treatment, storage, or disposal facilities for municipal waste, including but not limited to transfer stations and incinerators; (3) hazardous waste treatment, storage, disposal, and recovery facilities; (4) industrial facilities that are subject to section 313 of title III of EPCRA; and (5) industrial or commercial facilities that the stormwater engineer reasonably determines are contributing a substantial pollutant loading to the MS4, which are sources of stormwater discharges associated with industrial activity, shall comply with the following requirements: (1) Any operator requiring coverage for stormwater discharge associated with industrial activity under the TPDES general permit for stormwater discharges associated with industrial activity (Industrial General Permit No. TXR050000) shall submit a signed copy of its notice of intent (NOI) to the stormwater engineer contemporaneously with submittal of the original NOI to the TCEQ. If industrial activity is already underway, the NOI shall be submitted to the stormwater engineer within thirty (30) days from the effective date of this article. (2) If relevant information provided in the NOI changes, a notice of change (NOC) must be prepared and implemented in accordance with the requirements of the industrial general permit or any individual or group NPDES or TPDES permit issued for stormwater discharges from the industrial facility. A copy of the NOC must be provided to the stormwater engineer within fourteen (14) days of discovery of the change. (3) Where all stormwater discharges associated with industrial activity that are authorized by this article, and by the TPDES permit for those discharges from industrial activities, are eliminated, or where the operator of stormwater discharges associated with industrial activity at a facility changes, the operator of the facility shall submit to the stormwater engineer a notice of termination (NOT) that includes the information required for notices of termination by part II.C.6 of the industrial general permit. (4) The city’s MS4 permit requires that all industrial facilities listed in section 22.11.038(b) be subject to site inspections of no less frequently than once per permit term (5 years). The stormwater engineer retains the authority to inspect these industrial facilities as often as deemed necessary to assure permit compliance and safety of the MS4 and surface waters of the United States. (5) Industrial or commercial facilities that the stormwater engineer determines is contributing a substantial pollutant load to the MS4 shall submit self-monitoring data to the city on an annual basis. Submittal date of self-monitoring data shall be determined by the stormwater engineer. (6) An industrial facility may submit a "no exposure" certification to the city in lieu of self-monitoring; however, any facility operating under a "no exposure" certification is subject to periodic facility inspections (not less than once per permit term (5 years) to verify the facilities "no exposure" exemption. The inspection may be waived by the city for facilities that participate in the TCEQ’s Small Business and Local Government Assistance Compliance Commitment Program. (7) The stormwater engineer retains the authority to conduct inspections on any industrial facility subject to the TCEQ’s TPDES multi-sector general permit or has been deemed to be, or has potential to be, contributing a substantial pollutant load to the MS4 in order to determine compliance and ensure safety of the MS4 and waters of the United States. (8) Operators must submit monitoring results to the stormwater engineer upon his/her request for discharges subject to the semi-annual or annual monitoring requirements of part III of the industrial general permit. (9) Copies of the NOI, NOC, NEC, NOT may be delivered to the stormwater engineer either in person or by mailing it to: Notice of Intent to Discharge StormwaterStormwater Management DepartmentPO Box 2000Lubbock, Texas 79457 (c) Facilities operating with a TPDES or NPDES individual permit. (1) The facility shall operate in accordance with all requirements of the appropriate TPDES or NPDES individual permit. (2) Upon inspection of the facility, the stormwater engineer may notify the operator or owner at any time that facility operations do not meet the requirements of the appropriate TPDES or NPDES individual permit or any additional requirements imposed by or under this section or other city ordinances. Such notification shall be in writing and shall identify those provisions of the permit or ordinance that are not being met, and clearly identify the changes necessary to meet such requirements. Within thirty (30) calendar days of such notification from the stormwater engineer, the operator or owner shall make the required changes and submit to the stormwater engineer a written certification that the changes have been implemented. If compliance is not achieved to the city’s satisfaction, the city may, in its discretion, report the noncompliance to EPA and/or TCEQ, and/or the city may itself undertake any enforcement action authorized by sections 22.11.040 or 22.11.041 of this article. Exercise of the city’s option for consultation under this subsection shall not be a bar against, or prerequisite for, taking any other enforcement action against any owner or operator of the facility. (3) Copies of all sampling data and analyses reports required by the appropriate TPDES or NPDES individual permit shall be submitted to the stormwater engineer at the same time that such reports are submitted to the EPA or TCEQ, unless otherwise notified in writing by the stormwater engineer.
( 1983 Code, sec. 30-58 ; Ordinance 2008-O0095 , sec. 1, adopted 11/20/2008 )
Ask a question about Lubbock law
Corpus searches the Lubbock sections it holds and shows the ones that match, with their citations. Free, no sign-in.