For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 106-118 — Utility profile

Code of Ordinances, City of McAllen, Texas (through Ord. 2026-83 adopted 2026-08-24) · McAllen Code of Ordinances § 106-118

Corpus is an independent public-information project, not the official City of McAllen website. Stable reference: corpuslaw.us/code/b271e7e0-9bdc-4f6c-8097-e70997729d7f

§ 106-118: Utility profile.

(a) McAllen, Hidalgo County, Texas is located in the Lower Rio Grande Valley of Texas at the southern tip of the state. The city limits extend south to the Rio Grande, across from the Mexican city of Reynosa. McAllen is about 70 miles west of the Gulf of Mexico and approximately ten miles north of the Mexican border. (b) MPU provides water and wastewater services within a 48.7 square mile area, which includes the city of McAllen and a portion of customers living in various neighborhoods of adjacent extraterritorial jurisdictions of the cities of Alton, Edinburg, Mission, La Joya and Pharr. Appendix A attached to Ordinance 2024-134 provides a service area map and appendix B contains a detailed utility profile. (c) The city faces water reliability challenges due to being located a semiarid climate featuring long, very hot and humid summers, and brief, warm winters. There are two distinct seasons: a wet season from May to October and a dry season from November to April. Temperatures consistently rise above 100 °F (38 °C) from June through August, with exceptionally high humidity. Drought conditions are part of the natural weather patterns as summer months do not provide much precipitation. (1) Population. Table 1 provides population figures for retail, wholesale and wastewater service users served by MPU for 2019 to 2023 and table 2 depicts projected population figures through the year 2070. Table 1 MPU Population Year | Population Served by Retail Water Service | Population Served by Wholesale Water Service | Population Served by Wastewater Service 2023 | 146,595 | 0 | 145,671 2022 | 144,825 | 0 | 144,579 2021 | 141,758 | 0 | 143,920 2020 | 139,740 | 0 | 142,347 2019 | 138,315 | 0 | 142,971 Source city of McAllen Connections and Data Table 2 MPU Population Projections Year | Population Served by Retail Water Service | Population Served by Wholesale Water Service | Population Served by Wastewater Service 2030 | 162,045 | 0 | 169,664 2040 | 201,439 | 0 | 207,340 2050 | 250,411 | 0 | 257,745 2060 | 311,288 | 0 | 320,404 2070 | 386,965 | 0 | 398,296 Source city of McAllen Connections and Data (2) Customer and water use data. a. MPU supplies water for residential, commercial, industrial, and public use. The total per capita use for the city in 2023 is estimated at 154 gallons per capita per day (gpcd). This is an average taken by dividing the total water treated by the population served. b. The 2023 residential gallons per capita per day are estimated at 95 gpcd. Residential gpcd is calculated by dividing total single-family and multi-family residential water sales by the population served. c. The industrial users accounted for 3% of total water use. d. Table 3 reflects the projected population served by the system and the expected water demand. The projected water demands are based on the average annual water use from MPU records and population projections of 1.5% annually. To project future water demand, the projected population figures were multiplied by the gross per capita use rate for the previous five-year period, which for 2023 was 166. Table 3 Population and Water Use Projections Year | Population | Water Demand(gallons) 2025 | 151,026 | 9,150,655,274 2026 | 153,291 | 9,287,915,104 2027 | 155,591 | 9,427,233,830 2028 | 157,924 | 9,568,642,338 2029 | 160,293 | 9,712,171,973 2030 | 162,698 | 9,857,854,552 2031 | 165,138 | 10,005,722,371 2032 | 167,615 | 10,155,808,206 2033 | 170,129 | 10,308,145,329 2034 | 172,681 | 10,462,767,509 Source-Historic MPU Data and Connections (3) Water system. a. Water supply. Raw water supply: The Rio Grande River is the sole source of water for the city service area. MPU has water contracts with the following listed in table 4. Table 4 Water Contracts Contracts for Water Rights | Acre Ft/Year(AFY) | MGD | Source of Water Hidalgo County Irrigation District #1 | 5,300 | 3.6 | Rio Grande Hidalgo County Irrigation District #2 | 8,111 | 7.2 | Rio Grande Hidalgo County Irrigation District #6 | 2,000 | 1.8 | Rio Grande Hidalgo County Water Improvement District #3 | 14,530 | 13.0 | Rio Grande United Irrigation District | 11,250 | 10.0 | Rio Grande Brownsville Irrigation District | 2,000 | 1.8 | Rio Grande City of McAllen Water Rights | 679 | 0.6 | Rio Grande Total | 43,870 AFY | 38.0 MGD b. Water system. 1. Raw water reservoirs. MPU owns and operates two raw water reservoirs that supply water to our two water treatment facilities: [a] New Boeye Reservoir. [1] Location: South McAllen and generally located between South 23rd Street and 10th Street and just north of Military Highway. [2] Storage volume: 300,000,000 gallons. [3] Raw water supply sources: HCID #3 and HCID #2. [b] North water treatment plant reservoir. [1] Location: Northwest McAllen adjacent to the north water treatment plant. [2] Storage volume: 200,000,000 gallons. [3] Raw water supply sources: United Irrigation District; HCID #1. Both reservoirs have synthetic liner which helps prevent water loss through seepage. 2. MPU operates two water treatment plants: [a] Southwest water treatment plant (2501 W Expressway 83): 50.5 MGD (rerated 2023). [b] Northwest water treatment plant (8313 North Bentsen Rd): 11.2 MGD (rerated 2011). Total system treatment capacity: 61.7 MGD. Note: The southwest water treatment plant includes a groundwater well rated at 1.5 MGD. c. Water pumping and storage: 1. Current annual pumpage for 2023 was 8.7 billion gallons of water. MPU has various pumps located at the southwest water treatment plant to pump raw water from the raw water reservoir into the plant facilities for treatment. The plant also has high service pumps to pump water from the ground storage tanks into the distribution system. MPU relies on elevated storage and high service pumps for pressure maintenance. Raw pump total capacity is 100.9 MGD and high service total capacity is 120.7 MGD. 2. MPU has seven water towers with a total of 6.75 million gallons of elevated storage, and 11.9 million gallons of ground storage. All ground storage and elevated towers are monitored by a SCADA system. The system allows MPU to monitor flow data and record historical trends in the treatment and distribution system. [a] Average annual raw water pumpage (3-year average 2021-2023): 9,050.327 MG. [b] Average annual treated water pumpage (3-year average 2021-2023): 8,600.864 MG. [c] Maximum daily treatment capacity: 61.7 MGD. [d] Average daily pumpage (3-year average 2021-2023): 23.56 MGD. d. Water distribution. MPU's service area is comprised of a single pressure plane. High service pumps at both water treatment plants pressurize system as needed to serve entire service area. MPU has an estimated 803 miles of water lines, of which approximately 17.4% are 12 inches in diameter or larger. The MPU system has 14,587 water valves and 5,591 active fire hydrants. e. Water master plan. 1. MPU relies on a water master plan to provide a general road map of planned infrastructure improvements needed to sustain growth for the near future. The water master plan is continually adjusted based on varying development and growth trends and generally receives a comprehensive update every 10 years. The most recent comprehensive update was completed in 2024. Key objectives of the plan included an evaluation of the integrity of the existing water systems and recommendations for a phased capital improvement plan to serve growth through the next 25 years. The recommended improvements serve as a basis for the design, construction, and financing of facilities required to meet MPU's water service needs and is key to both short-term and long-term budgeting plans. 2. Overall, the water master plan includes projects that will help to improve water conveyance and water storage. These projects will not only address growth, but mitigate water loss. To diversify MPU's water portfolio and to lessen the dependency on surface water, consideration for alternate water sources for future treatment expansions are considered and recommended in the plan. (4) Wastewater system. a. Wastewater treatment system. 1. MPU operates two wastewater treatment plants: [a] South wastewater treatment plant (4100 Idela Ave). This plant is a 10.0 MGD Biological Nutrient Removal plant with a design flow with 31.0 MGD peak flow capabilities. It is currently 61% hydraulically loaded with effluent limitation of 10 mg/l of carbonaceous biochemical oxygen demand; 15 mg/l of total suspended solids; 2 mg/l of ammonia nitrogen and E. coli, CFU or MPN/100 ml 126. [b] North wastewater treatment plant (2100 West Sprague). This plant is a 15.0 MGD design flow with 28.125 MGD peak flow capability. The permit limitations include 10 mg/l of biochemical oxygen demand, and 15 mg/l of total suspended solids, 3 mg/l of ammonia nitrogen and 126 MPN/100 ml E. coli. 2. Both wastewater treatment plants are based upon extended aeration activated sludge system, with secondary effluent limitations. Treated effluent is discharged into floodways and eventually into the Arroyo Colorado and Laguna Madre Estuary. 3. The total treated wastewater volume for 2022 was 4516.368 million gallons. The average daily between both wastewater treatment plants is 12.37 MGD. 4. The wastewater infrastructure consists of 664 miles of wastewater lines, 56 lift station within the City of McAllen and 11 lift stations within the City of Alton. b. Wastewater production. 1. Average annual amount treated (4-year average 2019-2022): 4,775.3 MG/per year. 2. Maximum daily treatment capacity: 21.25 MGD. 3. Average daily treated: 13.1 MGD. c. Wastewater master plan. 1. The wastewater master plan is continually adjusted based on varying development and growth trends and generally receives a comprehensive update every 10 years. The most recent comprehensive update was completed in 2024 and will evaluate the integrity of the existing wastewater systems and to recommend a phased capital improvements plan to serve growth through 2042. The recommended improvements will serve as a basis for the design, construction, and financing of facilities required to meet MPU's wastewater service needs due to projected population growth. 2. The wastewater master plan provides recommendations for infrastructure improvements that will satisfy growth and improve wastewater collections and conveyance. The efficiency of wastewater collection and conveyance to the wastewater treatment facilities is crucial to assure that the availability of reclaimed water is maximized. (5) Reclaimed water system. a. Reclaimed water. 1. The city currently produces reclaimed water from both wastewater treatment facilities. The South wastewater treatment plant provides type II reclaimed water to the city-owned Champion Lakes Golf Course, which is located approximately one mile away from the treatment facility. The north wastewater treatment plant produces both type I and type II reclaimed water for irrigation and industrial use. The Tres Lagos Master Planned Community and city-owned youth baseball complex facility are served with type I reclaimed water for irrigation use. Additionally, the city also has contracts to serve reclaimed water for industrial use to electric power generation facilities Calpine and Magic Valley. 2. Plans for continued expansion and growth of the reclaimed water system are in place to maximize the usage and storage of reclaimed water. Currently, reclaimed water is stored at repurposed wastewater clarifiers within the treatment facilities. Storage facilities at point of delivery to the Tres Lagos Community will soon be constructed. Furthermore, MPU is constantly evaluating potential reclaimed water users that could be served from the south wastewater treatment plant. The south wastewater treatment plant master layout includes a filtration system to produce type I reclaimed water in the future. b. Reclaimed water master plan. An updated reclaimed water master plan was completed by Plummer consultants in 2024. The master plan includes projected reclaimed water needs and infrastructure improvements to meet such requirements. Evaluation and analysis of reclaimed water treatment process, distribution, and storage needs will also be included to continue to extend and grow the existing reclaimed water system.

( Ordinance 2017-27 , § I, adopted 5/8/2017 ; Ordinance 2023-59 adopted 4/25/2023 ; Ordinance 2024-134 adopted 12/9/2024 )

Ask a question about McAllen law

Corpus searches the McAllen sections it holds and shows the ones that match, with their citations. Free, no sign-in.