For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 106-120 — Water conservation strategies

Code of Ordinances, City of McAllen, Texas (through Ord. 2026-83 adopted 2026-08-24) · McAllen Code of Ordinances § 106-120

Corpus is an independent public-information project, not the official City of McAllen website. Stable reference: corpuslaw.us/code/f8707819-c793-4b77-8bff-7048008bc6a1

§ 106-120: Water conservation strategies.

(a) Conservation related projects. In an effort to advance water conservation goals, the city has prioritized capital improvement plan (CIP) projects that incorporate a measurable direct conservation and drought contingency benefits. These projects include the following: delivery efficiency projects, water metering upgrade projects, projects that increase storage of either raw water and potable water supplies, and projects that improve system redundancy such as alternate source projects. The implementation of these projects will depend on prioritization and available funding. A more detailed description of these projects is provided below: (1) Infrastructure improvement projects. a. Raw water conveyance system improvements. Raw water is delivered from a third party, normally an irrigation district, to a city-owned reservoir. The water is then delivered from the reservoir to our treatment facilities for processing. Portions of the raw water conveyance system is comprised of concrete mortar joint pipe. This pipe is considered a rigid pipe and due to its size, any leak can account for significant water losses. Thus, projects that improve efficiency and reliability of this delivery system is a targeted goal. These projects could include: 1. Replacing old and inefficient pipes to minimize leaks and losses such as replacing concrete cylinder pipes with polyvinyl chloride pipes (PVC). 2. Upgrading existing infrastructure to enhance water delivery efficiency. 3. Installing modern monitoring equipment such as advanced metering infrastructure to quickly identify and address leaks. b. Water storage system improvements. These include projects that increase/improve water storage capacity for either raw water supplies and/or treated water. These improvements could include: 1. Constructing new ground storage tanks at our water treatment plant sites; 2. Constructing of additional elevated water storage tanks within distribution system; 3. Construct new and/or improve existing raw water reservoir capacity; 4. Maintain and/or improve reservoir liners to reduce/minimize seepage; 5. Conduct annual inspections of water storage tanks to evaluate the integrity of the tanks and determine if there is water loss. c. Interconnections with neighboring systems. Whenever possible, MPU will continue to pursue interconnections. MPU currently has interconnections with the cities of Mission, Pharr, Hidalgo and Edinburg. Interconnections with neighboring systems can help resiliency during drought and/or emergency conditions. d. Advanced metering infrastructure and automatic meter reading system (AMI/AMR) installation. 1. Advanced metering infrastructure (AMI) provides a significant upgrade aimed at improving water usage monitoring and efficiency. By modernizing infrastructure through the installation of an AMI system, control and automation of network infrastructure will be enhanced via innovation, technology, and information, resulting in significant water savings. Additional benefits include: [a] Providing real-time data on water consumption. [b] Identifying leaks and unusual usage patterns quickly, allowing for prompt intervention. [c] Enabling customers to monitor their water use via a real-time water consumption application. 2. MPU commenced the AMI Installation project in late 2023. The projected completion date is estimated to be in early 2026. (2) Alternate water sources. a. Wastewater effluent reclaimed (aka reuse) water. This type of water can be considered to have both a direct and indirect conservation benefit. Potable reuse technologies exist that can treat water to a potable standard. These projects are generally described as either direct or indirect potable reuse. A more common application is to treat this to a non-potable standard. Uses for this non-potable water include landscape irrigation, construction water, cooling water, industrial processing, etc. MPU currently has a non-potable reuse program for water via irrigation of treated wastewater effluent on the city's golf course as well as the master planned community of Tres Lagos. Additionally, MPU has contracts to sell reclaimed water to Calpine and Magic Valley Electric Generation. b. Brackish groundwater desalination. The city relies almost exclusively on surface water from the Rio Grande River. However, numerous studies suggest that there is a plentiful supply of brackish groundwater in our region. A 2017 alternate source feasibility study funded by the Bureau of Reclamation identified Brackish Groundwater Desalination as a recommended strategy for diversifying the city's water supply. Implementation efforts are planned to start in Fall 2025 and include the following: 1. Installation of test wells to determine the zone most likely to produce the most water and corresponding water quality. 2. Construct permanent wells at our water treatment plants. 3. Constructing a desalination facility to provide a reliable alternative water source. 4. Integrating or blending desalinated water into the existing supply to enhance overall resilience. (3) System monitoring/operations. a. Leak detection. Regularly identifying and repairing leaks throughout the system to prevent water loss. MPU currently conducts annual audits. Activities could include: 1. Utilizing advanced leak detection technologies, including AMI meters and acoustic sensors. 2. Setting up a maintenance schedule for regular inspections. b. Supervisory control and data acquisition (SCADA) systems. MPU utilizes SCADA systems to monitor and control water distribution and treatment processes in real time. Future improvements could include: 1. Upgrading SCADA systems capacities for enhanced real-time monitoring and data collection. 2. Improving process control to optimize water treatment efficiency. 3. Integrating SCADA with other management systems to support data-driven decision-making. c. Condition assessments. Conduct an annual assessment of the condition of water infrastructure to prioritize maintenance and replacement. Activities could include: 1. Conduct annual comprehensive evaluations storage tanks and treatment facilities. 2. Using advanced diagnostic tools such as sensors to assess the structural integrity of assets. d. Asset management. Implementing a comprehensive asset management program to extend the lifespan of water infrastructure and optimize performance. (b) Public education. McAllen Public Utility will inform citizens, improve awareness and promote ongoing smart water usage and water conservation efforts within the city. (1) McAllen Public Utility will periodically provide the public with bilingual information (Spanish and English) about the drought contingency plan, including information about the conditions under which each stage of the drought contingency plan is to be initiated or terminated and the drought response measures to be implemented in each stage. (2) MPU has a water education and communications coordinator on staff who is responsible for promoting and advancing water conservation efforts, raising awareness of water quality and facilitating broader public education initiatives. Water education encompasses various aspects, including the quality and use of water in the city. This information will be provided by means of, but not limited to, an appropriate combination of the following items: a. Public service announcements on the city cable network. b. Internal and external newsletter announcements and information. c. Press releases, media alerts and social media campaigns. d. Distribution of pamphlets, brochures, and fact sheets. e. Including summarized information, tips, and conservation practices including smart water usage practices on the city public utility website. f. Host special events for city citizens that promote water conservation and education efforts, which include the following: World Water Day, Customer Service Week, and the MPU Annual Night Out. g. Participate in public outreach events and educational offerings at local events, by having information tables. h. Conduct water and wastewater plant tours. i. Conduct water education presentations and workshops for city and surrounding area schools. j. Host water education camps for grade-school students. k. Serve as the liaison for MPU's water education initiatives by fostering partnerships with community stakeholders, including McAllen ISD, the International Museum of Art and Science and Quinta Mazatlan. l. Sample flyers are provided in appendix E to Ordinance 2024-134. (c) Metering devices and universal metering. (1) Metering devices. a. MPU implemented a full AMI meter change out in 2023 and is projected to complete the installation in by 2026. New meters, two inches and smaller in size comply with the latest revision of "AWWA New Meter Standard for Cold-Water Meters." Specifications require that the manufacturer will guarantee all new meters will test at 98.1% to 101% accurate at the maximum rate and 95% to 101% at the "low flow" rate as designed by AWWA Standards Manual M-6 on a meter size for size basis. This ensures accurate and precise measurement of water diverted. b. Large sized meters, or those 1.5 inches and larger in size, make up only 3.3% of the meters used but use 33.3% of the water. Conversely, small sized meters, or those 1-inch and below, make up 96.7% of all meters but account for less than 66.7% of metered sales, according to the most recent comprehensive audit. c. MPU has one production meter at the north water treatment plant and three production meters at the south water treatment plant. The meters are tested annually to ensure they are within acceptable accuracy. Meters will be calibrated if they are outside the acceptable accuracy range. Meters are monitored continuously through the SCADA system. (2) Universal metering. a. MPU currently meters all water usage except for system flushing, fire equipment filling, and water loss due to leaks, breaks, processing, and system loss. b. MPU, however, does keep track of water used by fire hydrants through the city fire department and distribution department and tracks the water flushed through an established method of calculation developed by the Texas Water Development Board (TWDB) and Austin Water Loss Calculator. As recommended by Texas Commission on Environmental Quality (TCEQ), MPU's flushing program, waterline dead-ends are flushed monthly. c. The MPU Water Transmission and Distribution Department is responsible for maintaining approximately 54,209 meters (October 2024). Meter readers use a portable meter tester and/or a read-a-flow recorder to test meters in the field. When meters cannot be read in the field, they are taken into a meter shop to be assessed. Priority is always given to water leaks with all other tasks including, service calls, maintenance calls, and other water distribution projects. (d) Measures to determine and control for water loss. (1) MPU uses a proactive approach to address and minimize water loss. Customer complaints regarding low pressure or suspected leaks are promptly investigated, and the water transmission and distribution department tests water meters on an as-needed basis when issues arise or customers report discrepancies. MPU staff also monitor water consumption trends to identify and investigate meter readings that deviate significantly from established usage patterns. Any meters showing unusually high or low consumption are tested to verify accuracy. (2) MPU has a comprehensive reporting system to monitor and analyze water transmission, distribution, and delivery. This system tracks metrics such as water pumped, water delivered, water sold, and water losses. These data points are critical for evaluating the integrity of the water delivery system and identifying areas where water loss can be mitigated. The current billing platform, advanced utilities software, classifies water consumption into categories such as single-family residential, multi-family residential, commercial, industrial, and reuse. (3) In addition to facilitating accurate billing and consumption tracking, the software identifies high and low water users for further evaluation. The city is in the process of transitioning to an Enterprise Resource Planning (ERP) system, which will integrate and replace the current utility billing software. The ERP system will centralize water usage, sales, and loss data, improving the ability to identify and analyze water usage and loss. Although the ERP implementation date has not been finalized, it is expected to enhance system efficiency, data analysis capabilities and enhance data integration and accuracy. (4) Water loss is calculated as the difference between water production and water sales, and these figures are reported annually using the TWDB water loss form. Over the past three years, MPU has maintained an average water loss rate of 12.41%. In 2023, this rate was reduced to 9.45%, reflecting ongoing efforts to improve system efficiency and minimize water loss. MPU aims to maintain levels below 10% moving forward. (e) Leak detection and repair. (1) MPU practices a leak detection and repair program involving visual inspections of the system and uses a detailed record management system to detect unusual water consumption. Meter readers check for leaks while reading meters and performing regular maintenance. Quick and timely repairs are made when detected or reported. A crew is dispatched immediately after a water leak has been reported. There is a 24-hour emergency line available for reporting water system issues. (2) MPU staff members conduct audits of the system on an annual basis. Every five years, MPU hires an outside consultant to conduct a comprehensive audit and leak survey, with the next audit to be conducted in 2026. The purpose of the audit is to determine causes for water loss and develop recommendations for improvement in a cost-effective manner. (3) In addition, the following reports are submitted to the Texas Water Development Board that give an overall picture of the MPU's water system including data on water usage, water loss, conservation efforts and capacities. A water use survey is submitted to the Texas Water Development Board annually on March 1st and the water loss audit report and the annual water conservation plan report are submitted on May 1st. (4) Table illustrates the number of leaks that were repaired over the past five years and the water lost during the leaks. Table 7 Leaks Year | # of Leaks Repaired | Total Real Loss | Total Length of Main Lines(miles) 2019 | 1,550 | 805,332,767 | 732 2020 | 2,818 | 779,675,681 | 735 2021 | 3,564 | 689,431,704 | 738 2022 | 1793 | 455,601,538 | 741 2023 | 588 | 490,624,026 | 800 Source: MPU TWDB water conservation plan Annual Report (f) Plumbing codes and retrofit program. The city does have plumbing codes pursuant to the standard plumbing code issued from the International Code Council. Additionally, Texas Legislature passed laws, which requires plumbing fixtures sold in the state after to meet strict standards that incorporate efficient water use and conservation in new structures. These laws subsequently effects plumbing fixtures sold in the city and will help to eliminate inefficient plumbing fixtures. (g) Water conservation landscaping. (1) Drip irrigation. a. When practical, MPU will advocate the use of drip irrigation for the watering of landscapes for commercial establishments. Also, the use of ornamental fountains will be discouraged except when they recycle and use minimal quantities of water. b. Licensed irrigation contractors will be asked to use drip irrigation systems, where possible, and to use water conserving irrigation systems like sprinklers, which produce large drips instead of a fine mist and a sprinkler layout, which accommodates prevailing wind patterns. (2) city of McAllen parks and recreation department. MPU will continue to work with the city's parks and recreation department in order to eliminate any wasteful water use. The watering of parks, for example will be evaluated and done according to efficient water conserving methods. Municipal pools will also be evaluated for efficient water use. (3) Local landscape architects and local nurseries. Local landscape architects and local nurseries will be encouraged to utilize efficient irrigation systems and native low water using plants and grasses. Xeriscape gardening and landscaping techniques will also be promoted. (h) Conservation oriented water rate structure. The city has established three schedules of rates to be charged for the consumption of water supplied through the city water system, as follows. The current rates are provided in appendix D to Ordinance 2024-134. (1) Standard water rate schedule for customers within the city, for city customers under the city's Certificate of Convenience and Necessity (CCN). (2) Standard water rate schedule for areas previously covered by Sharyland Water Supply Corporation Certificate of Convenience and Necessity relating to any buyout phases whereby the city has entered into agreements with Sharyland Water Supply Corporation for buyout of their certified area. (3) Standard water rate schedule outside the city. (i) Monitoring and records management program. A monitoring and records management program is in place for tracking annual budget allocation for Hidalgo County Irrigation District No. 1, Hidalgo County Irrigation District No. 2, Hidalgo County Irrigation District No. 3, United Irrigation District, Hidalgo County Irrigation District No. 6 and Brownsville Irrigation District to determine water deliveries, sales and losses. (j) Revisions to the water conservation plan. MPU will review and update this water conservation plan, as appropriate, based on new and updated information. At a minimum, the plan will be updated every five years.

( Ordinance 2017-27 , § I, adopted 5/8/2017 ; Ordinance 2023-59 adopted 4/25/2023 ; Ordinance 2024-134 adopted 12/9/2024 )

Ask a question about McAllen law

Corpus searches the McAllen sections it holds and shows the ones that match, with their citations. Free, no sign-in.