For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 106-119 — Water conservation goals

Code of Ordinances, City of McAllen, Texas (through Ord. 2026-83 adopted 2026-08-24) · McAllen Code of Ordinances § 106-119

Corpus is an independent public-information project, not the official City of McAllen website. Stable reference: corpuslaw.us/code/9268b5ea-ed0f-46c7-9b3c-6b5b581cf1e4

§ 106-119: Water conservation goals.

McAllen Public Utility (MPU) has set water conservation goals to reduce water loss and improve system efficiency. These goals are based on historic water usage trends and aim to ensure a reliable water supply for the future. (a) Water conservation goals. MPU aims to achieve at least a 2% reduction in water loss and maintain water loss between 8% and 10% by 2029. The following goals have been set for the next 5 and 10 years, with baseline and historical data provided in tables 5 and 6 (appendix C to Ordinance 2024-134) below: (1) Residential water use goals. a. 5-year goal (2029): Maintain residential per capita water use at or below 109 GPCD. b. 10-year goal (2034): Maintain residential per capita water use at or below 119 GPCD. (2) Water loss goals. a. 5-year goal (2029): Reduce water loss to 10 GPCD (6%). b. 10-year goal (2034): Reduce water loss to 8 GPCD (5%). Table 5 Year | Historic 5 Year Average | Baseline | 5-Year Goal for Year 2029 | 10-Year Goals for Year 2034 1. Total Per Capita Consumption (GPCD) | 161 | 166 | 166 | 166 2. Residential (GPCD) | 92 | 98 | 109 | 119 3. Water Loss (GPCD) | 15 | 13 | 10 | 8 4. Water Loss % | 9% | 8% | 6% | 5% Source-Historic MPU Water Use Trends & TWDB water conservation Goas for Retail Water Supplier 2023 1. | Total GPCD = (Total Gallons in System + Permanent Population) + 365 2. | Residential GPCD = (Gallons Used for Residential Use + Residential Population) + 365 3. | Water Loss GPCD = (Total Water Loss + Permanent Population) + 365 4. | Water Loss Percentage = (Total Water Loss + Total Gallons in System) x 100; or (Water Loss GPCD + Total GPCD) x 100 Table 6 Achieve Date | Target for Total GPCD | Current Total GPCD | Target for Resi- dential GPCD | Current Resi- dential GPCD | Target for Water Loss GPCD | Current Water Loss GPCD | Target for Water Loss Percent- age | Current Water Loss Percent- age Five Year Target | 151 | 166 | 120 | 98 | 15 | 13 | 9.93% | 7.99% Ten-Year Target | 148 | 166 | 119 | 98 | 13 | 13 | 8.78% | 7.99% Source MPU 2023 TWDB water conservation plan Annual Report: Retail Water Supplier (b) Schedule for implementation. (1) Meter monitoring and replacement. Meters will be monitored for accuracy annually and replaced on an as needed basis. MPU has established a meter change out policy that requires all meters to be changed out after 10 years or 1.0 MG of total flow. A meter testing program is in place to identify and address any malfunctioning meters. (2) AMI project. AMI installation began Fall 2023 to improve delivery efficiencies. The AMI project includes upgrading 49,439 meters (domestic, irrigation and reuse) to smart meters with advanced metering capabilities. The infrastructure will include an AMI fixed network system that integrates with existing utility software applications to automatically collect and store hourly consumption data. (3) Water audits. MPU staff will conduct water audits on an annual basis, with a comprehensive audit by an external consultant every five years. The next audit will take place after the completion of the AMI project in 2026. (4) Addressing water losses. Efforts to identify and address real water losses will be made as budget allows. This includes MPU's leak detection program, visual inspections along distribution lines, and the use of a flow monitoring system to pinpoint areas of water loss. (5) Public outreach. MPU will provide information to the public during events, in quarterly mailings and on social media. (c) Methods for tracking targets and implementation. (1) Record keeping. Records will be maintained for meter calibration, meter testing and meter replacement. (2) Monitoring progress. Staff will continue to gather data and input data into the TWDB portal for various water reports regarding water loss and water usage. Staff will monitor results and track progress towards meeting established goals. Internally, water analysis reports are generated monthly, quarterly, and annually. These reports will be reviewed by staff to track progress and will be used to update residents, the public utility board, and other stakeholders on the status of conservation efforts. (3) Audits and evaluations. Annual water audits will be conducted by staff, with an external consultant conducting a comprehensive audit every five years. The next external audit will take place after the completion of the AMI project. (4) Public outreach tracking. MPU staff will track the information distributed to the public through various channels including tabling events, quarterly mailings, press releases and social media posts. Outreach data is reviewed and staff make adjustments as necessary to meet annual goals. (5) AMI project oversight. Staff from utility engineering, billing, meter reading, and transmission and distribution will meet weekly with the contractor to oversee the implementation of the AMI/AMR project. These meetings focus on reviewing project progress, addressing any issues, ensuring adherence with project timelines, and verifying that benchmarks and performance metrics are met. (d) Achieving targets. Scheduled reports, including monthly, quarterly, and annual reports, will be reviewed by MPU staff to assess progress toward meeting conservation goals. Monthly reports will focus on water usage data and AMI readings, while quarterly and annual reports will include more comprehensive water audit results. All data will be input into the TWDB portal for required reporting. Any necessary adjustments will be discussed internally with staff based on the findings from these reports to ensure continued progress with meeting goals.

( Ordinance 2017-27 , § I, adopted 5/8/2017 ; Ordinance 2023-59 adopted 4/25/2023 ; Ordinance 2024-134 adopted 12/9/2024 )

Ask a question about McAllen law

Corpus searches the McAllen sections it holds and shows the ones that match, with their citations. Free, no sign-in.