For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 46-217 — Determination of position of producing horizon; cementing producing string

Code of Ordinances, City of McAllen, Texas (through Ord. 2026-83 adopted 2026-08-24) · McAllen Code of Ordinances § 46-217

Corpus is an independent public-information project, not the official City of McAllen website. Stable reference: corpuslaw.us/code/b8bbcc98-89d1-4735-b30a-dfee6e79a928

§ 46-217: Determination of position of producing horizon; cementing producing string.

The position of the producing horizon in any oil or gas well shall be determined by coring, logging or testing. The producing string shall be cemented at the top of such producing horizon or lower. Cementing shall be by the pump and plug method. A sufficient quantity of cement shall be used so that it will fill the annular space back of the pipe to a distance of not less than 600 feet above the shallowest sand capable of producing oil or gas in commercial quantities. Cement shall be allowed to stand a minimum of 24 hours under pressure before drilling plug or initiating tests.

( 1966 Code, § 20-49 )

Ask a question about McAllen law

Corpus searches the McAllen sections it holds and shows the ones that match, with their citations. Free, no sign-in.