For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 5.3.13 — Wastewater Utility

Code of Ordinances, City of McAllen, Texas (through Ord. 2026-83 adopted 2026-08-24) · McAllen Unified Development Code § 5.3.13

Corpus is an independent public-information project, not the official City of McAllen website. Stable reference: corpuslaw.us/code/73a1a4c2-17ed-4cef-96f1-e428d8ca80a0

§ 5.3.13: Wastewater Utility.

A. Generally. 1. All subdivisions in the City's corporate limits and ETJ shall provide an approved means for wastewater collection and treatment and connection to an adequate public wastewater system in conformance with the standards of the public wastewater provider. a. The City's corporate limits and ETJ are serviced by various public wastewater providers and it is the responsibility of the applicant to determine the public water provider that services their property. 2. Any new wastewater main(s) must be designed and installed by the applicant's engineer prior to the public wastewater provider accepting the wastewater facility or facilities for maintenance. 3. The applicant's engineer shall coordinate with both the McAllen Public Utilities and public wastewater provider to receive construction plan approval for the construction or modification of wastewater facilities. 4. The public wastewater provider may prohibit a connection to an existing or proposed wastewater system that they determine shall exceed the capacity or overload the system to serve the anticipated wastewater demand of the proposed development. 5. The public wastewater provider in coordination with the McAllen Public Utilities may require the phasing of development to maintain adequate wastewater capacity. 6. The public wastewater provider in coordination with the McAllen Public Utilities shall make the final determination of the adequacy of the proposed system. 7. The public wastewater provider shall determine placement and width of wastewater easements. B. Wastewater Connection. 1. Any development occurring within six hundred and sixty (660) feet or less of an existing or proposed wastewater line shall extend and connect to the City's facilities (or to other public utility as determined by CCN). 2. Any on-site sewage facility (OSSF) must be approved by McAllen Public Utility Board and shall be constructed in accordance with the Texas Administrative Code (Title 30, Part 1, Chapter 285), On-Site Sewage Facilities. 3. The Hidalgo County Health Official or the City's designated representative shall review and approve all septic system permits for any property in both the city limits, ETJ and the County, after McAllen Public Utilities approval. C. Wastewater Line Extension to Subdivision Perimeters. 1. All laterals and wastewater mains installed within a subdivision must extend to the borders of the subdivision as required for future extensions of the collection system, regardless of whether such extensions are required for service within the subdivision. 2. If due to physical constraints, a new subdivision shall never be constructed beyond a developing subdivision, the City Commission and McAllen Public Utility Board may approve a subdivision waiver (see Section 6.4.5) for this requirement prior to action on the construction plans or prior to action on any plat.

( Ordinance 2026-16 adopted 2/9/2026 )

Ask a question about McAllen law

Corpus searches the McAllen sections it holds and shows the ones that match, with their citations. Free, no sign-in.