§ 5.3.14 — Preliminary Utility Plan

Code of Ordinances, City of McAllen, Texas (through Ord. 2026-83 adopted 2026-08-24) · McAllen Unified Development Code § 5.3.14

Corpus is an independent public-information project, not the official City of McAllen website. Stable reference: corpuslaw.us/code/01b4d454-bab0-4e19-a00c-42ea542083b4

§ 5.3.14: Preliminary Utility Plan.

A. Applicability. 1. A preliminary utility plan shall detail both Section 5.3.12 and Section 5.3.13 requirements and may be required as part the following plat applications in which the modification or extension of utilities is required for the proposed development: a. Preliminary Plat. b. Final Plat. c. Replat. 2. Preliminary utility plans shall comply with the criteria contained in the City's standard applications forms and checklists. 3. Preliminary utility plans are subject to the review processes established in Chapter 6 required for plat and development applications. B. Plan Criteria. 1. Concurrent with the submission of a preliminary plat, final plat, or any other plan in which the modification of public utilities is required, the applicant shall submit a map or plan showing the location and size of water utility and wastewater utility mains, which shall be required to provide adequate service to the lots specified in the proposed plat and in accordance with the Standard Design Guide. 2. Preliminary utility plans shall show existing and proposed fire hydrant systems to show adequate fire protection as required in the UDC and the City's fire code. C. Coordination with Other Utility Providers. 1. When the subdivision is in an area served by a utility provider other than the City, the applicant is still required to provide a water system analysis, indicating adequate water supply and water quality for review by the McAllen Public Utilities. 2. When a subdivision is in an area served by a utility provider other than the City, the applicant must provide a letter from the utility provider stating that facilities exist in the area to provide adequate domestic service and fire protection. 3. If McAllen Public Utilities has reason to believe that there may be water supply or pressure concerns the City may require, a water system analysis, indicating adequate water supply and water quality. 4. A plat shall not be approved until a letter has been provided from the utility provider stating that they have accepted the plans for construction.

( Ordinance 2026-16 adopted 2/9/2026 )