For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 5.3.17 — Other Underground Utilities

Code of Ordinances, City of McAllen, Texas (through Ord. 2026-83 adopted 2026-08-24) · McAllen Unified Development Code § 5.3.17

Corpus is an independent public-information project, not the official City of McAllen website. Stable reference: corpuslaw.us/code/75d447af-3c99-4326-83ed-2d82c158d294

§ 5.3.17: Other Underground Utilities.

A. Generally. 1. All distribution lines, cables, or utilities shall be installed below ground within the subdivision to eliminate the necessity for disturbing the street, curb and gutter, sidewalk and other services and structures when making connections. a. When a new subdivision is developed in an area with existing above ground utility lines, the applicant shall be responsible for locating the lines within the subdivision and along its perimeter underground. b. Transmission lines or major cables to provide utilities such as electric, telephone, and cable television to the area may be located above ground on the perimeter of the subdivision being served, subject to discretion of the City Engineer. c. The installation of these utilities shall conform to commonly accepted construction standards, subject to discretion of the City Engineer. 2. The applicant or property owner shall provide separate service lines for water and wastewater to each lot or unit. 3. The applicant or property owner shall coordinate with all other appropriate utility companies for the extension of their respective utility lines and service to and within the addition and for any costs or refunds of such cost. 4. All plats and site plans for residential and multifamily developments shall require all internal telephone lines, cable television lines, electric lines, and utility lateral and services lines and wires to be placed underground except as otherwise provided in this UDC. a. In special or unique circumstances or to avoid undue hardships, a subdivision waiver may be approved by the City Engineer to permit the construction and maintenance of overhead electric utility lateral or services lines and of overhead telephone and cable tv lines and may approve any plat or site plan with such approved variances, waivers, or exceptions. b. Where electrical service is to be placed underground, street or site facilities shall also be placed underground. c. All electrical, cable television, and telephone support equipment (transformers, amplifiers, switching devices, etc.) necessary for underground installations in subdivisions shall be pad mounted or placed underground. d. Unless specifically stated otherwise, temporary construction service may be provided by overhead utility lines and facilities without obtaining a waiver. 5. All installations regulated by the provisions of this article shall be in conformance with the intent of this UDC and SDG. 6. Nothing in this UDC shall be construed to require any existing facilities to be placed underground when no development is proposed. B. Company Notification to City. All utility companies shall notify the City, in writing, at least forty-eight (48) hours before digging, boring, drilling, etc.

( Ordinance 2026-16 adopted 2/9/2026 )

Ask a question about McAllen law

Corpus searches the McAllen sections it holds and shows the ones that match, with their citations. Free, no sign-in.