§ 3.514 — Data Centers

Code of the City of Mesquite, Texas (Supp. No. 71: codified through Ordinance No. 5259, enacted July 20, 2026) · Mesquite City Code, App. C, pt. 3, § 3.514

Corpus is an independent public-information project, not the official City of Mesquite website. Stable reference: corpuslaw.us/code/45e3a833-6c4f-49c2-acd7-3936ae6033fe

3.514 - Data Centers.

Data Center development standards are consolidated, for the most part, in this Section 3.514 (Data Centers). See also the following MZO sections, including, but not limited to: Section 3.405 (Table of parking standards — Nonresidential uses); Section 3.515 (Battery Energy Storage Systems - BESS); and Section 6.102 (Definitions). See also the following City Code sections, including, but not limited to: Chapter 10, Article III (Noise), Sec. 10-75 (Maximum permissible sound levels); and Appendix D (Comprehensive Fee Schedule), Article XII, Sec. 12-103 (Consultant Review Fees). A. Purpose. The purpose of this Section 3.514 (Data Centers) is to establish a regulatory framework for Data Center development that supports economic investment and job creation while minimizing impacts on adjacent properties, public infrastructure, and community character. Data Centers are permitted only in appropriate industrial areas of the City and are subject to case-by-case review through Conditional Use Permit approval by the City Council to address noise, lighting, utilities, traffic, generators, water and wastewater, and related impacts on public health, safety, and welfare. B. Definitions. The following terms and definitions shall apply to this Section 3.514 (Data Centers). For additional definitions, see MZO, Part 6, 6.100, Section 6.102 (Definitions): 1. Data Center. See Section 6.102 (Definitions). 2. Accessory Data Center. A subordinate data processing facility located on the same platted lot or tract as a principal use (such as a hospital, office building, manufacturing operation, or corporate campus) that is designed solely to support the internal data storage, processing, and information technology functions of that principal use, and that does not exceed twenty-five percent (25%) of the gross floor area of the principal use. 3. Battery Energy Storage System (BESS). See Section 6.102 (Definitions). a. BESS at Data Centers. Battery Energy Storage Systems at Data Centers are governed by Section 3.514.M.(Generators and Emergency Power), Subsection 5. (Battery Energy Storage Systems - BESS). b. BESS not associated with Data Centers. For standalone or other accessory BESS installations not associated with a Data Center, see Section 3.515 (Battery Energy Storage Systems - BESS). 4. Cryptocurrency Mining. See Section 6.102 (Definitions). 5. Generator Yard. See Section 6.102 (Definitions). 6. Ground-Mounted Equipment. Equipment located outside of and not on the roof of a principal building, including but not limited to generators, fuel tanks, cooling equipment, heat exchangers, Battery Energy Storage Systems (BESS), universal power supply units, transformers, and substations. C. Applicability. These standards apply to all new Data Centers and to expansions of Data Centers that increase gross floor area or ground-mounted equipment area by more than ten percent (10%). 1. Commercial Cryptocurrency Mining is prohibited as a principal or accessory use on any parcel containing a Data Center and may not be combined with a Data Center use. See Section 6.102 (Definitions). 2. Where any provision of this Section 3.514 (Data Centers) conflicts with other requirements of this Zoning Ordinance, the more restrictive standard shall apply unless this section expressly provides otherwise. 3. Accessory Data Centers, as defined in Section 3.514.B.(Definitions), are subject to the development standards of this Section 3.514 (Data Centers) and are permitted in any district that allows the principal use, except as follows: a. Accessory Data Centers that do not exceed twenty-five percent (25%) of the gross floor area of the principal use and that are fully contained within the principal use's building are exempt from the CUP approval requirement of Section 3.514.D. (Permitted Zoning Districts and Conditional Use Approval Process), and the setback requirements of Section 3.514.H. (Site Development Standards), but shall otherwise comply with all applicable noise, screening, and utility standards of this Section 3.514 (Data Centers). b. All ground-mounted equipment associated with an accessory Data Center shall comply fully with this Section 3.514 (Data Centers). D. Permitted Zoning Districts and Conditional Use Approval Process. 1. Permitted Zoning Districts and CUP. Data Centers shall be permitted as a principal use only upon approval of a Conditional Use Permit (CUP) by the City Council in accordance with MZO, Part 5, 5.300, Section 5.303 (Application Procedures), and Section 5.310 (Conditional Use Permit - CUP), and only in the following zoning districts: a. I (Industrial) District; and b. Planned Development (PD) districts where the base zoning district is Industrial, or where a Data Center use is specifically identified as a permitted use in the PD ordinance. 2. Prohibited Zoning Districts. Data Centers are prohibited in all Residential, Office, Commercial, Agricultural, and Mixed-Use districts. 3. CUP Approval Not Required in PD-Districts. A CUP is not required for a Data Center on a property zoned Planned Development where the approved PD ordinance specifically approves a Data Center by right. E. Conditional Use Permit Application Requirements. In addition to the standard CUP application requirements of Section 5.303 (Application Procedures), all Data Center CUP applications shall include the following: 1. Site Information. a. Conceptual site plan depicting building locations and orientation; ground-mounted equipment locations; setbacks from all property lines; vehicle parking layout; truck, trailer, and loading areas; driveways and on-site circulation routes; screening walls and fencing; landscape and buffer areas; retaining walls; and locations of light poles and fixtures. b. Conceptual landscape plan prepared by a licensed landscape architect. c. Conceptual building elevations for all facades, including material specifications, architectural articulation, and screening of rooftop equipment. 2. Technical Studies. The following studies shall be submitted prior to CUP application submittal, unless otherwise stated below: a. Noise study, in accordance with Section 3.514.L (Noise Standards). b. Photometric plan demonstrating compliance with Section 3.514.K (Lighting). c. Utility demand analysis identifying anticipated electrical, water, and wastewater demands, and written confirmation of adequate capacity from all applicable utility providers. d. Water and wastewater impact plan describing the cooling system type, estimated annual water consumption, and proposed wastewater discharge details. e. Traffic Impact Analysis (TIA), in accordance with Section O. (Traffic and Access), Subsection 1. (Traffic Impact Analysis). f. Ground-borne vibration assessment, prepared by a qualified engineer, demonstrating compliance with Mesquite City Code Sec. 10-71(c) (Vibration Offenses), and MZO Part 1, Section 1.407 (Vibration). g. Baseline electromagnetic field (EMF) assessment for on-site electrical equipment, measured at the property line and referenced to recognized guidelines (e.g., ICNIRP or IEEE C95.6). 3. Operations Information. a. Generator plan identifying the number, type, fuel type, capacity, proposed enclosure type and sound attenuation rating, and location of all on-site generators. b. Cooling system description identifying the cooling system type (e.g., air-cooled, closed-loop water, liquid cooling) and estimated annual water consumption. c. Traffic and construction management plan. d. Emergency operations plan describing procedures for equipment failure, fire suppression system activation, hazardous material releases, and coordination protocols with City fire and emergency services. 4. Long-Term Compliance. a. Decommissioning plan, in accordance with Section 3.514.S. (Decommissioning). b. Such additional studies or information as required by the Director of Planning and Development Services, City Engineer, Fire Marshal, or the City Council. F. Conditional Use Permit Review Criteria. In addition to the general CUP review criteria of Section 5.310.N. (Approval standards for Issuance of Conditional Use Permits), the Planning and Zoning Commission and the City Council shall consider the following additional factors when reviewing a Data Center application: 1. Site Compatibility. The compatibility of the proposed Data Center with surrounding land uses, including proximity to residential districts and uses, adequacy of screening and buffering, and consistency with the Mesquite Comprehensive Plan. 2. Infrastructure Capacity. The adequacy of electrical, water, wastewater, and telecommunications infrastructure to support the proposed facility without adverse impacts to City systems or surrounding properties. 3. Operational Performance. The applicant's demonstrated ability to comply with the noise, lighting, water, traffic, and other operational standards of this Section 3.514 (Data Centers). 4. Long-Term Operations. The adequacy of proposed emergency operations, security, maintenance, and decommissioning plans to protect public health, safety, and welfare over the full life of the facility. G. Consultant Review. 1. The Director, or designee, may authorize the review of any CUP application, technical study, proposed finding, or proposed condition of approval by a qualified independent consultant if the Director, or designee, reasonably determines that expert review is necessary to evaluate technical aspects of the application that exceed the routine technical expertise of City staff, or to verify the accuracy and methodology of technical studies submitted by the applicant. 2. Such technical matters include, without limitation: noise modeling and acoustical analysis; photometric studies and lighting design; utility demand and grid interconnection analysis; water and wastewater engineering; structural and electrical engineering review; environmental assessments; and any other technical matter for which the Director, or designee, determines that specialized expertise is required. 3. All actual and reasonable costs of a consultant's technical review authorized under this subsection shall be borne by the applicant and shall be listed in accordance with Appendix D (Comprehensive Fee Schedule), Article XII, Sec. 12-103 (Consultant Review Fees). 4. Consultant review under this subsection is distinguished from Third-Party Review of Development Documents and Inspection of Improvements under Texas Local Government Code, Title 7, Subtitle C, Chapter 247. H. Site Development Standards. 1. Minimum Lot Area. The minimum lot area for a Data Center shall be five (5) acres. 2. Setbacks—Adjacent to Residential Districts, Residential Uses, or Protected Uses. a. Principal buildings shall be located a minimum of three hundred (300) feet from the nearest property line of any residential district boundary or the following protected uses: public and private schools, State-licensed child-care or day-care facilities, hospitals, and State-licensed assisted-living or nursing facilities. b. Ground-mounted equipment, including generators, cooling equipment, Battery Energy Storage Systems (BESS), transformers, substations, fuel tanks, and similar equipment, shall be located a minimum of five hundred (500) feet from the nearest property line of any residential district boundary or the following protected uses: public and private schools, State-licensed child-care or day-care facilities, hospitals, and State-licensed assisted-living or nursing facilities. c. Ground-mounted equipment shall not be located between the principal building and any public street. 3. Setbacks — Adjacent to Nonresidential Property. a. Principal buildings shall be located a minimum of one hundred (100) feet from any nonresidential property line. b. Pavement shall be set back a minimum of fifty (50) feet from any street right-of-way line. The area between the right-of-way and the pavement setback line constitutes the required landscape buffer described in Section 3.514.J. (Screening and Buffering), Subsection 1. (Landscape Buffer) and shall be fully landscaped. No pavement other than driveways and pedestrian walkways is permitted within this buffer. 4. Building Height. a. Maximum building height: Seventy-five (75) feet, measured to the top of the roof deck. b. Parapets, rooftop screening walls, and rooftop mechanical equipment shall not count toward maximum building height. c. Accessory structures located between the principal structure and any property line shall not exceed thirty (30) feet in height. I. Building Design Standards. 1. Facades. Any building facade visible from a public right-of-way should strive to incorporate architectural differentiation that breaks the apparent mass of the facade at intervals of no greater than one hundred (100) horizontal linear feet by including at least one change in building form and at least one design element as follows: a. Change in building form. A minimum five-foot change in building height for buildings less than thirty (30) feet tall, or a minimum ten-foot change for buildings thirty (30) feet or taller; or a building step-back or recess with a minimum depth of two and one-half (2.5) feet. b. Design element. A change in exterior building materials; a change in pattern, texture, or color; or architectural features such as articulated columns, pilasters, or projections with a minimum relief of twelve (12) inches from the wall plane. 2. Main Entrance Feature. The principal use entrance should strive to be clearly differentiated from the remainder of the building facade by a change in material, pattern, texture, color, or accent material, and should either project from or recess into the adjoining building plane. 3. Exterior Materials. All building facades fronting, or more than twenty percent (20%) visible from, an existing or future public right-of-way should strive to be clad in one hundred percent (100%) masonry, which for purposes of this subsection means brick, natural stone, architectural cast stone, precast concrete panels, concrete tilt wall, or three-stage stucco. Metal cladding is also permitted on any facade. All exterior building materials and screening walls should have a non-reflective finish. 4. Service and Loading. Truck loading docks, service entrances, generator yards, and utility equipment areas shall be oriented away from residential properties and, to the maximum extent practicable, away from public street frontages. 5. Flexibility. The City's authority to enforce building design standards in this subsection are subject to Mesquite City Code Sec. 5-4 (Certain regulations regarding building products, materials or aesthetic methods prohibited). In addition, where application of the mandatory building design standards of this subsection are not feasible due to functional requirements of a specific Data Center use, the Director, or designee, may authorize minor modifications as a condition of CUP approval, provided the overall design intent is achieved. J. Screening and Buffering. 1. Landscape Buffer. A minimum fifty-foot-wide landscape buffer shall be provided adjacent to all public rights-of-way and all residentially zoned districts. The buffer shall be fully landscaped and shall incorporate berming, decorative masonry walls, evergreen screening, or a combination thereof appropriate to the site context. All required landscaping shall be located between the property line and any perimeter fence or screening wall, so that the landscape buffer is exterior to and visually precedes all fencing when viewed from adjacent properties or rights-of-way. Except when adjacent to residentially zoned properties, no fence or screening wall shall be placed between the property line and any required landscape planting. The landscape buffer shall be shown on the site plan and landscape plan submitted with the CUP application. 2. Ground-Mounted Equipment Screening. All ground-mounted equipment shall be fully screened from public view on all sides by masonry walls, architectural screening, landscaping, berming, or a combination thereof. The following standards apply: a. Masonry screening walls shall be a minimum of one (1) foot taller than the height of the tallest piece of equipment being screened and may exceed screening or fence height with the approval of the Director, or designee. b. Masonry walls shall be constructed of brick, natural stone, precast concrete panel, or architectural concrete masonry units (CMU) and shall have a decorative finish on all faces abutting public rights-of-way or adjacent properties. c. Perforations for ventilation are permitted in screening walls, provided that all equipment remains fully visually screened from public view. 3. Rooftop Equipment Screening. All rooftop mechanical equipment shall be fully screened on all sides from public view by an opaque parapet or screening wall. The screening shall be a minimum of one (1) foot taller than the tallest piece of rooftop equipment, or five (5) feet, whichever is greater. Perforations for ventilation are permitted provided all equipment remains fully screened from public view. 4. Fencing. a. Materials. Perimeter security fencing shall consist of masonry, wrought iron, or black PVC-coated chain link. Non-PVC-coated chain link, uncoated wire, barbed wire, and wooden fences are prohibited. Masonry walls shall be constructed of brick, natural stone, precast concrete panel, or architectural CMU with a decorative finish on all faces visible from public rights-of-way or adjacent properties. b. Street Frontages. Along street frontages, fencing shall consist of masonry or wrought iron only. Fencing adjacent to a public right-of-way shall have required landscaping placed between the fence and the right-of-way line; fencing shall not be placed in front of required landscaping. c. Residential Adjacency. A screening wall is required along any property line adjacent to a residential district in accordance with Section 1A.303 (Nonresidential use requirements). d. Height. Perimeter security fencing shall be a minimum of six (6) feet and a maximum of eight (8) feet in height, measured from finished grade. Greater fencing heights may be approved by the City Council as a condition of CUP approval. e. Location. The location and extent of all fencing and perimeter walls shall be shown on the site plan submitted with the CUP application. K. Lighting. 1. Full Cutoff Required. All exterior light fixtures shall be full-cutoff type luminaires with a cutoff angle not exceeding ninety (90) degrees, designed to minimize glare, light spillover, and sky glow. 2. Maximum Spillover at Property Lines. No exterior light fixture shall cause illumination levels to exceed 0.0 footcandles at any property line, as measured at grade. No light source, lamp, or beam shall cross any property line by a calibrated photometer with all on-site artificial light sources operating. The photometric plan required by this Section 3.514.K.(Lighting), Subsection 7.(Photometric Plan), shall demonstrate compliance with this requirement at all property lines. 3. Fixture Height. Freestanding light fixtures shall not exceed thirty (30) feet in height, measured from finished grade at the base of the support to the top of the fixture. 4. Building-Mounted Fixtures. Building-mounted light fixtures shall be attached to walls. The top of any wall-mounted fixture shall not exceed eighteen (18) feet above finished grade, except fixtures located directly above a building entry or exit. 5. Color Temperature. The maximum allowable correlated color temperature (CCT) for all outdoor luminaires is 3,000 Kelvin. 6. Security Lighting. Exterior security lighting devices shall be weather- and vandal-resistant, shall use a managed light source, and shall be directed downward to minimize glare and light trespass onto adjacent properties. 7. Photometric Plan. A photometric plan prepared by a qualified lighting professional, demonstrating compliance with this subsection, shall be submitted with the CUP application and prior to issuance of a building permit. L. Noise Standards. 1. Maximum Sound Levels. Noise from all activities associated with a Data Center, including cooling equipment, fans, air handling units, and generators, shall not exceed the following levels when measured at the property line of the Data Center or at the exterior wall of the nearest occupied residential structure, whichever produces the higher reading: a. Daytime. Daytime (7:00 a.m. to 10:00 p.m.): sixty-five (65) dBA. b. Nightime. Nighttime (10:01 p.m. to 6:59 a.m.): sixty (60) dBA. c. Nightime levels when adjacent to a residential property line, or residential district boundary, or protected uses. Nighttime sound levels shall not exceed fifty-five (55) dBA measured at the shared property line where a Data Center is adjacent to a residential property, residential district boundary, or the following protected uses: public and private schools, State-licensed child-care or day-care facilities, hospitals, and State-licensed assisted-living or nursing facilities. 2. Exemptions. The maximum sound levels in this Section 3.514.L. (Noise Standards), Subsection 1. (Maximum Sound Levels) do not apply to: a. Demolition or construction activities authorized under a valid building permit; or b. Emergency situations arising from sudden, reasonably unforeseen events beyond the control of the operator that require the use of emergency generators; or c. Routine generator testing conducted in compliance with Section 3.514.M. (Generators and Emergency Power), Subsection 3. (Routine Testing). 3. Noise Study. As part of any initial CUP application, the applicant shall submit a sound modeling study prepared by a licensed professional engineer specializing in acoustics or an engineer Board Certified by the Institute of Noise Control Engineers. The study shall: a. Be site-specific to the proposed topography, site layout, building type, scale, height, and construction; and b. Establish baseline noise conditions at measurement locations determined by the Director, or designee; and c. Model predicted post-development noise levels from all cooling, ventilation, and other noise-generating equipment operating simultaneously at full operational load; and d. Address both the proposed phase and the ultimate buildout at full occupancy if the development will be completed in phases; and e. Report all noise levels using both A-weighted decibel measurements (dBA) and C-weighted decibel measurements (dBC) for all measurement locations and equipment sources; and f. Include full octave band (1/1 octave) spectral analysis for all predicted and measured noise sources, using a Class 1 integrating sound level meter (per IEC 61672) with 1/1 octave band filters (per IEC 61260); and g. Include one-third octave band (1/3 octave) spectral analysis for all predicted and measured noise sources, using equipment meeting the requirements of IEC 61260; and h. Include a tonality assessment evaluating whether any noise source produces perceptible pure tones, conducted in accordance with ISO 1996-2 (or most current edition), or an equivalent method approved by the Director, or designee; and include recommendations for noise mitigation measures as necessary for compliance with maximum sound levels, with required mitigation measures incorporated into the site plan and building plans prior to issuance of building permits. 4. Noise Study - Post-Construction. Within sixty (60) days of issuance of a Certificate of Occupancy for each phase of development, and at any time requested by the Director, or designee, the operator shall submit a post-construction sound study conducted during peak cooling operations. If the study demonstrates that sound levels exceed the maximums established in this subsection, the operator shall immediately undertake all measures necessary to achieve compliance. 5. Low Frequency and Infrasound Noise. Low frequency noise shall not exceed the following octave-band sound pressure levels, evaluated in accordance with ANSI S12.9 Part 4, Annex D (or most current edition), measured at the property line nearest the noise source or at the exterior wall of the nearest occupied residential structure, whichever produces the higher reading: a. 16 Hz: 55 dB b. 31.5 Hz: 55 dB c. 63 Hz: 55 dB d. All low frequency noise measurements shall be performed by or under the direct supervision of a licensed professional engineer specializing in acoustics, or an engineer Board Certified by the Institute of Noise Control Engineers, using a Class 1 integrating sound level meter (per IEC 61672) with 1/1 octave band filters (per IEC 61260). Measurement and analysis under this subsection shall additionally evaluate infrasonic content at one-third octave band center frequencies below twenty (20) Hz. 6. City Noise Ordinance. a. Noise from Data Center operations shall additionally comply with all applicable provisions of the Mesquite Noise Ordinance, as amended. See Mesquite City Code, Ch. 10, Article III (Noise). In the event of a conflict, the more restrictive standard shall apply. b. Vibrations from Data Center operations shall comply with all applicable provisions of the Mesquite City Code, including but not limited to, Ch. 10, Article III (Noise), Sec. 10-71 (Offenses), Subsection (c) (Vibration Offenses); and MZO, Part 1, 1.400, Section 1.407 (Vibration). M. Generators and Emergency Power. 1. Emissions. All diesel generators shall meet or exceed EPA Tier 4 Final emission standards and shall comply with all applicable requirements of the Texas Commission on Environmental Quality (TCEQ). 2. Enclosures. Generators shall be enclosed in a Level 3 or equivalent sound-attenuating enclosure designed to limit sound output to a maximum of seventy (70) dBA measured twenty-five (25) feet from the generator. Generator enclosures shall be screened in accordance with Section 3.514.J. (Screening and Buffering), Subsection 2. (Ground-Mounted Equipment Screening). 3. Routine Testing. Routine generator exercise and maintenance testing shall comply with the following: a. Days: Monday through Friday (excluding federal holidays); and b. Hours: 9:00 a.m. to 4:00 p.m.; and c. Maximum duration: four (4) hours per test event; and d. Frequency: no more than one (1) full-load test per generator per calendar quarter, plus routine no-load or light-load monthly exercises not to exceed thirty (30) minutes per generator per month. 4. Emergency Operation. Generator operation during emergency maintenance or actual utility outages may occur outside the scheduled testing hours of Section 3.514.M. (Generators and Emergency Power), Subsection 3. (Routine Testing). The operator shall notify the Director, or designee, within seventy-two (72) hours of any such emergency operation, stating the reason, duration, and corrective action taken or planned. 5. Battery Energy Storage Systems (BESS). Battery Energy Storage Systems are permitted as an accessory use in conjunction with a Data Center. BESS installations shall comply with all applicable fire codes, building codes, and the requirements of Section 3.515 (Battery Energy Storage Systems - BESS) of this Zoning Ordinance, and shall be screened in accordance with Section 3.514.J. (Screening and Buffering), Subsection 2. (Ground-Mounted Equipment Screening). 6. Fuel Storage. On-site fuel storage tanks and associated equipment shall be located within the generator yard, shall comply with the setback requirements of Section 3.514.H. (Site Development Standards), 2. (Setbacks -Adjacent to Residential Districts or Residential Uses), Subsection b, and shall be screened in accordance with Section 3.514.J. (Screening and Buffering), Subsection 2. (Ground-Mounted Equipment Screening). All fuel storage shall comply with applicable fire codes, environmental regulations, and TCEQ requirements. N. Water and Wastewater. 1. Cooling Systems. Only closed-loop or recycled water cooling systems are permitted for Data Center cooling operations. The use of potable water from the City's municipal water system for open evaporative or once-through cooling that discharges to waste is prohibited. 2. Water Demand Disclosure. The applicant shall disclose anticipated monthly and annual water consumption in the utility demand analysis required by Section 3.514.E. (Conditional Use Permit Application Requirements), 2. (Technical Studies), Subsection c, at the time of CUP application and shall provide written confirmation of available capacity from the City's water utility provider prior to approval of the final site plan. 3. Wastewater Discharge. All wastewater discharges from Data Center operations shall comply with the applicable provisions of the Mesquite City Code, including Chapter 16 (Water and Liquid Waste), and all applicable state and federal environmental regulations. Information about proposed wastewater discharges shall be included in the water and wastewater impact plan required by Section 3.514.E. (Conditional Use Permit Application Requirements), 2. (Technical Studies), Subsection d. 4. Utility Coordination. As part of the CUP application, the applicant shall provide written documentation confirming that adequate electrical, water, wastewater, telecommunications, and other utility capacity exists or will be provided to serve the proposed facility, including coordination with all applicable utility providers. O. Traffic and Access. 1. Traffic Impact Analysis. Submittal of a Traffic Impact Analysis (TIA), prepared in accordance with the Mesquite Engineering Design Manual, shall be submitted when required by the Director of Planning and Development Services, or City Engineer, or designee(s). The TIA shall identify potential traffic problems and provide effective mitigation. 2. Access. All driveways and access points shall comply with Sec. 15-111 (Compliance with City of Mesquite Engineering Design Manual required) of the City Code. 3. Truck Circulation. On-site truck circulation routes, truck and trailer staging areas, and loading and unloading areas shall be shown on the site plan. Truck and trailer areas shall be screened from view from public rights-of-way and adjacent residential properties in accordance with Section 3.514.J. (Screening and Buffering) 4. Construction Traffic. A construction traffic management plan shall address haul routes, hours of heavy vehicle operations, and measures to minimize impacts on surrounding roadways and residential areas during construction. P. Landscaping. 1. General. All landscaping shall comply with Part 1A (Landscaping, Buffering and Screening and Tree Preservation) of this Zoning Ordinance. A professionally designed landscape plan shall be submitted with each CUP application. Enhanced landscaping, berming, evergreen screening, decorative walls, or similar buffering may be required as a condition of CUP approval. All required landscape plantings shall be installed in accordance with the minimum size requirements of Section 1A.500 (Plant Schedules). 2. Street Frontage Landscaping. Front yard landscape areas located between the public right-of-way and the pavement setback line shall be landscaped as follows: a. Along all public streets. One (1) large canopy tree with a minimum caliper of three (3) inches for every thirty-five (35) linear feet of street frontage, and one (1) ornamental tree with a minimum height of eight (8) feet for every twenty-five (25) linear feet of street frontage. b. Trees may be clustered in small groups, with groups spaced a minimum of fifty (50) feet apart. Landscape design shall have a naturalistic, varied appearance rather than a purely linear arrangement. c. Plantings shall be located outside of utility easements and overhead powerlines. 3. Side and Rear Yard Landscaping. A minimum twenty-five-foot-wide landscape strip shall be provided along all side and rear property lines and shall include a minimum of one (1) large canopy tree for every fifty (50) linear feet. 4. Residential Adjacency Screening. Where a Data Center site is adjacent to a residentially zoned district, a minimum of three (3) staggered rows of approved evergreen screening trees shall be planted within the fifty-foot landscape buffer required by Section 3.514.J. (Screening and Buffering), Subsection 1. (Landscape Buffer), in addition to the tree requirements of Section 3.514.P. (Landscaping), Subsection 3. (Side and Rear Yard Screening), and screening requirements of Part 1A, Section 1A.300. (Screening and Buffering Requirements). 5. Plant Species. Native and regionally adapted, drought-tolerant plant species are strongly preferred. A diversity of species is required; no single species shall exceed thirty percent (30%) of total tree or shrub plantings on a site. Thorned or security-buffer plant species may be used within perimeter screening areas but shall not be installed adjacent to pedestrian circulation routes or public access areas. All plant materials shall comply with the applicable standards, approved species lists, and installation requirements set forth in Section 1A.500 (Plant Schedules). 6. Ground Cover. All landscaped areas on nonresidential sites shall be covered with a mix of maintained turf grass, native ground cover, or an approved xeriscape alternative — including mulch, crushed rock, or decomposed granite — within and beneath tree areas. Bare soil shall not be an acceptable ground cover treatment in any required landscape area. 7. Irrigation. All required landscaping shall be served by a professionally designed automatic irrigation system. Rainwater or stormwater collection systems are encouraged and may be required as a condition of CUP approval to reduce potable water consumption for irrigation, provided such systems comply with all applicable building, plumbing, and environmental regulations and are isolated from the potable water supply. 8. Parking Area Landscaping. a. Interior landscaping/trees required. When a parking area contains twenty (20) or more parking spaces, the interior of the area shall be landscaped by providing a minimum of one (1) tree for every fifteen (15) parking spaces or fraction thereof. The required trees shall be spread throughout the parking area. Parking areas shall be limited to a maximum of ten (10) contiguous parking spaces without a landscaped island separating the areas. A minimum of one (1) landscaped island shall be provided for every ten (10) parking spaces. Each tree shall be placed in a landscape area no smaller than 180 square feet, which is protected from vehicles through the use of concrete curbs, wheel stops, or other permanent barriers no less than six (6) inches in height. Required landscaped islands shall be a minimum of ten (10) feet in width and shall contain at least one (1) large canopy tree. For each landscaped island of at least ten feet by twenty feet located within a parking lot, credit for four parking spaces will be provided. Credit for parking spaces cannot reduce the overall parking requirement by more than fifteen percent or to less than ten total spaces. b. Visibility. Landscaping materials, curbs, barriers or any combination thereof shall be situated so as not to create a visibility obstruction to moving vehicles or pedestrians within the parking lot. A landscape island located at an intersection of maneuvering aisles may not contain landscape material exceeding thirty (30) inches in height, except that trees trimmed so that no branch or growth is less than seven (7) feet in height above the curb level of the island may be permitted. c. Nonpublic parking areas. Requirements for internal landscaping and trees shall not apply to nonpublic parking areas which are not visible from the street and are not open to public use. d. Perimeter building frontage buffer. A minimum ten-foot-wide landscape buffer shall be provided between any parking area and the face of a building fronting a public street. This buffer shall be designed to accommodate required landscaping and pedestrian walkways. Q. Off-Street Parking. Off-street parking shall be provided as referenced in Section 3.405 (Table of parking standards—Nonresidential uses). The Director, or designee, may modify parking requirements based on operational needs analysis submitted by the applicant with the CUP application. R. Security. A security plan shall be submitted with the CUP application describing proposed security measures, including perimeter fencing, access control systems, on-site security personnel arrangements, surveillance camera coverage, and exterior security lighting. S. Decommissioning. 1. Decommissioning Plan Required. A conceptual decommissioning plan shall be submitted with each CUP application describing the procedures for decommissioning the facility upon permanent cessation of Data Center operations. The plan shall identify proposed methods for site stabilization, removal of equipment, utility disconnection, environmental remediation (if applicable), management and disposal of regulated materials in accordance with applicable federal, state, and local laws, adaptive reuse, redevelopment, or partial redevelopment of the site, and, where necessary, demolition of improvements. The plan shall also include a proposed implementation schedule. The plan shall be reasonable, enforceable, and consistent with the scale and expected operational life of the facility. 2. City Council Approval. The decommissioning plan shall be reviewed and approved by the City Council as part of the Conditional Use Permit approval process. The owner may submit minor amendments to the approved decommissioning plan for administrative approval by the Director, provided such amendments do not materially alter the approved decommissioning obligations. Major amendments shall require City Council approval. 3. Cessation of Operations. a. Inactive Data Center - Decommissioning. A Data Center that has ceased operations for a continuous period of thirty-six (36) months shall be considered inactive for purposes of this subsection. Upon expiration of the thirty-six (36) month period of inactivity, the owner shall proceed in accordance with the approved decommissioning plan by one or more of the following: (1) Redevelop the property for another lawful use authorized under the Mesquite Zoning Ordinance; or (2) Adaptively reuse all or a portion of the existing improvements for another lawful use; or (3) Decommission the facility, including removal of equipment, structures, utilities, or other improvements, to the extent required by the approved decommissioning plan. b. Existing Improvements. Existing buildings and site improvements may remain if they are intended for redevelopment, adaptive reuse, or partial redevelopment as part of another lawful use authorized under the Mesquite Zoning Ordinance. If the Director determines that specific improvements are unsafe, constitute a public nuisance, contain hazardous materials requiring removal, or cannot reasonably be reused or redeveloped in a manner consistent with the Mesquite Comprehensive Plan, applicable zoning regulations, or the character of surrounding land uses, the Director may require removal of those improvements, in whole or in part, in accordance with the approved decommissioning plan. 4. Appeals. See Section 3.514.U.(Appeals). 5. Commencement of Decommissioning. Implementation of the approved decommissioning plan shall commence within one hundred eighty (180) calendar days after expiration of the thirty-six (36) month cessation period unless the Director approves an extension for good cause shown, including but not limited to active redevelopment efforts, permitting delays, financing, market conditions, or similar circumstances beyond the owner's reasonable control. 6. Completion of Decommissioning. All decommissioning activities required by the approved decommissioning plan, including completion of any required environmental remediation and the management and disposal of regulated materials in accordance with applicable federal, state, and local laws, shall be substantially completed within twelve (12) months after commencement unless otherwise approved by the Director for good cause shown. 7. Voluntary Decommissioning. The owner may voluntarily implement the approved decommissioning plan at any time. T. Nonconforming Data Centers. 1. A Data Center use lawfully established prior to the effective date of the ordinance adding this Section 3.514 (Data Centers), or 2. A Data Center project vested prior to the effective date of the ordinance adding this Section 3.514 (Data Centers), and subsequently lawfully completed within the vesting deadlines, shall be classified as a legal nonconforming use and shall be subject to the provisions of MZO, Part 1, Section 1.300 (Nonconforming Situations and Amortization of Nonconforming Uses). Any expansion, enlargement, or material change in the operations of a nonconforming Data Center shall require full compliance with all standards of Section 1.300, and this Section 3.514 (Data Centers). U. Appeals. 1. Appeals to Board of Adjustment. The owner or operator may appeal the director's decision(s) in accordance with MZO, Part 5, 5.200, Section 5.210 (Appeals of Administrative Decisions to Board of Adjustment). See also Appendix D (Comprehensive Fee Schedule), Article XII, Sec. 12-120 (Board of Adjustment Fees), Appeals of Administrative Decisions to the Board of Adjustment. 2. Appeals to the City Council. Appeals to the City Council regarding development documents or development inspections may be made in accordance with MZO, Part 5, 5.100, Section 5.107.P.(Appeals to City Council), and Texas Local Government Code, Chapter 247, Section 247.006 (Appeal) as amended. Development documents and development inspections are defined in MZO, Part 6, 6.100, Section 6.102 (Definitions). See also Appendix D (Comprehensive Fee Schedule), Article XII, Sec.12-121 (Planning and Zoning Fees), Appeals of Administrative Decisions to the City Council.

(Ord. No. 5259, § 2(Exh. A), 7-20-26)

Ask a question about Mesquite law

Corpus searches the Mesquite sections it holds and shows the ones that match, with their citations. Free, no sign-in.