For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 3.515 — Battery Energy Storage Systems - BESS

Code of the City of Mesquite, Texas (Supp. No. 71: codified through Ordinance No. 5259, enacted July 20, 2026) · Mesquite City Code, App. C, pt. 3, § 3.515

Corpus is an independent public-information project, not the official City of Mesquite website. Stable reference: corpuslaw.us/code/85352456-8141-4f51-ba1e-24a9e254ad8a

3.515 - Battery Energy Storage Systems - BESS.

Battery Energy Storage Systems (BESS) as defined in MZO, Part 6, 6.100, Section 6.102 (Definitions) shall comply with the following standards. BESS installed as an accessory use at a Data Center are additionally subject to Section 3.514. (Data Centers), M. (Generators and Emergency Power), Subsection 5. (Battery Energy Storage Systems - BESS). A. Purpose. The purpose of this Section 3.515 (Battery Energy Storage Systems - BESS) is to establish standards for the siting, design, and operation of commercial (nonresidential) Battery Energy Storage Systems that protect public health, safety, and welfare by addressing fire risk, thermal runaway hazards, noise, visual impacts, and long-term site management, while recognizing the role of energy storage in supporting grid reliability, renewable energy integration, and Data Center operations. B. Definitions. The following terms and definitions apply to this Section 3.515 (Battery Energy Storage Systems - BESS). For additional definitions, See MZO, Part 6, 6.100, Section 6.102 (Definitions): 1. Battery Energy Storage Facility. See Section 6.102 (Definitions); and See also BESS - Large-Scale BESS+ (1 MWh and above). 2. Battery Energy Storage System (BESS). See Section 6.102 (Definitions). 3. BESS—Small-Scale BESS. A Small-Scale BESS installation has a total aggregate energy capacity of less than six hundred (600) kilowatt-hours (kWh) on a single nonresidential parcel. 4. BESS—Large-Scale BESS. A Large-Scale BESS installation has a total aggregate energy capacity of six hundred (600) kWh or greater on a single parcel, or any nonresidential BESS installation that is the principal use of the site. 5. BESS—Large-Scale BESS+ (1 MWh and above). A Large-Scale BESS+ installation, also referred to as a Battery Energy Storage Facility, has an energy capacity of one megawatt hour (1MWh) or greater. When a rule or regulation exists for Large-Scale BESS, it shall also apply to Large-Scale BESS+ (1 MWh and above) unless clearly stated otherwise. 6. BESS—Portable BESS. A Portable BESS is a self-contained battery energy storage unit that is: a. mounted on wheels or a skid and not affixed to a permanent foundation; and b. deployed on a site for a temporary period not to exceed ninety (90) calendar days, subject to the extension provisions of Section 3.515. (Battery Energy Storage Systems - BESS), E. (Application Requirements), Subsection 3. (Portable BESS). A Portable BESS unit that is affixed to a permanent foundation at any time, that remains on-site beyond the authorized temporary period without an approved extension, or that is used as a permanent rather than temporary power supply shall be reclassified as a Small-Scale BESS, a Large-Scale BESS, or a Large-Scale BESS+ installation as applicable based on aggregate energy capacity, and shall be subject to all requirements of this Section 3.515 (Battery Energy Storage Systems - BESS). 7. Battery Management System (BMS). An electronic system that monitors and manages the charging, discharging, temperature, and state of charge of a Battery Energy Storage System (BESS) to ensure safe and efficient operation. 8. Battery Operator. A Battery Operator means an electric cooperative, an electric utility, a power generation company, a self-generator, or another person or entity that owns or operates a Battery Energy Storage System (BESS), or Battery Energy Storage Facility. 9. Thermal Runaway. An uncontrolled self-heating condition in a battery cell that can lead to fire, explosion, or the release of toxic gases, caused by internal or external factors including physical damage, overcharging, or elevated temperature. 10. Authority Having Jurisdiction (AHJ). The organization, office, or individual responsible for enforcing applicable fire and building codes, or its designated representative. C. Applicability. These standards apply to all new commercial (nonresidential) BESS installations and to expansions of commercial (nonresidential) installations that increase aggregate energy capacity by more than twenty-five percent (25%). 1. Small-Scale BESS (below 600 kWh). Small-Scale BESS that are fully enclosed within a principal building and that do not exceed the thresholds in NFPA 855 for indoor installations are exempt from the setback, screening, and fencing requirements of this Section 3.515 (Battery Energy Storage Systems - BESS) but shall comply with all applicable fire codes, building codes, and Section 3.515.G.(Fire and Life Safety). 2. Large-Scale BESS (600 kWh and above). Large-Scale BESS are subject to this Section 3.15 (Battery Energy Storage Systems - BESS). 3. Large-Scale BESS+ (1 MWh and above). Large-Scale BESS+ (1 MWh and above), also referred to as Battery Energy Storage Facilities, are subject to this Section 3.15 (Battery Energy Storage Systems - BESS); the Texas Utilities Code, Chapter 187 (Battery Energy Storage Facility Safety); and Chapter 303 (Battery Energy Storage Facility Agreements). When a rule or regulation exists for Large-Scale BESS, it shall also apply to Large-Scale BESS + (1 MWh and above) unless clearly stated otherwise. 4. BESS Installed as an Accessory Use at a Data Center. BESS installed as an accessory use at a Data Center shall comply with Section 3.514. (Data Centers), M. (Generators and Emergency Power), Subsection 5. (Battery Energy Storage Systems - BESS), and the fire and life safety requirements of this Section 3.515 (Battery Energy Storage Systems - BESS). The setback and screening standards of Section 3.514 (Data Centers) shall govern for such installations. 5. Portable BESS. Portable BESS units are exempt from the setback, screening, fencing, photometric, decommissioning, noise assessment, and Conditional Use Permit (CUP) requirements of this Section 3.515 (Battery Energy Storage Systems - BESS), provided all conditions of Section 3.515.E. (Application Requirements), Subsection 3. (Portable BESS) are satisfied. Portable BESS units that are reclassified under Section 3.515.B. (Definitions), Subsection 5.(BESS - Portable BESS) shall immediately become subject to all requirements of this Section 3.515 (Battery Energy Storage Systems - BESS) applicable to the installation's aggregate energy capacity. 6. Fire Code and Building Codes. Nothing in this Section 3.515 (Battery Energy Storage Systems - BESS) shall be construed to supersede or limit the application of the International Fire Code, NFPA 855, or any other fire or building codes adopted by the City of Mesquite. 7. Conflicts resolution. a. Where any provision of this Section 3.515 (Battery Energy Storage Systems - BESS) conflicts with other requirements of this Zoning Ordinance, the more restrictive standard shall apply unless this section expressly provides otherwise. b. To the extent any provision of this Section 3.515 conflicts with applicable State or federal law said State or federal law shall control and the conflicting provision shall be deemed modified or unenforceable only to the extent necessary to eliminate the conflict. D. Permitted Zoning Districts. 1. Small-Scale BESS (below 600 kWh). Permitted as an accessory use by right in any zoning district that allows the principal use it supports, subject to the applicable standards of this Section 3.515 (Battery Energy Storage Systems - BESS). Small-Scale BESS that are the principal use of a site require a Conditional Use Permit (CUP) in the I (Industrial) District. 2. Large-Scale BESS (600 kWh and above). Permitted as a principal or accessory use only by Conditional Use Permit (CUP) in the I (Industrial) District and in qualifying Planned Development (PD) districts, subject to all standards of this Section 3.515 (Battery Energy Storage Systems - BESS). Commercial (nonresidential) Large-Scale BESS is prohibited in all Residential, Office, Commercial, Agricultural, and Mixed-Use districts. 3. Large-Scale BESS+ (1 MWh and above). Permitted as a principal or accessory use only by Conditional Use Permit (CUP) in the I (Industrial) District and in qualifying Planned Development (PD) districts, subject to all standards of this Section 3.515 (Battery Energy Storage Systems - BESS). Commercial (nonresidential) Large-Scale BESS+ (1 MWH and above) is prohibited in all Residential, Office, Commercial, Agricultural, and Mixed-Use districts. 4. Portable BESS. Portable BESS units are permitted on a temporary basis in any zoning district in which the principal use being supported is a permitted use, subject to the following restrictions: a. Prohibited Districts. Commercial (nonresidential) Portable BESS units are prohibited in all Residential zoning districts, regardless of the principal use being supported. b. Large-Scale Threshold. Multiple Portable BESS units deployed on the same parcel at the same time shall be aggregated for purposes of determining whether the Large-Scale BESS threshold of greater than six hundred (600) kWh is met. A Portable BESS deployment whose aggregate capacity equals or exceeds six hundred (600) kWh shall be subject to the district restrictions and Conditional Use Permit (CUP) requirements applicable to Large-Scale BESS under Section 3.515.D.(Permitted Zoning Districts), Subsection 2. (Large-Scale BESS (600 kWh and above), and may also be subject to Large-Scale BESS+ under Subsection 3.(Large-Scale BESS+ (1 MWh and above), notwithstanding the portable character of the individual units. c. Permit Required. A building permit and electrical permit shall be obtained in accordance with Section 3.515.E.(Application Requirements), Subsection 3.(Portable BESS), prior to deployment of a portable BESS. 5. Planned Development (PD) Districts. BESS may be permitted in Planned Development districts where the base zoning is Industrial or where BESS is specifically authorized in the approved PD ordinance. E. Application Requirements. The type of application required depends on the scale and permanence of the BESS installation, as set forth below. 1. Small-Scale BESS. A Small-Scale BESS installation shall require a building permit and electrical permit issued by the Building Official prior to installation. The following shall be submitted with the permit application: a. Site plan depicting BESS unit locations, dimensions, setbacks, access, fencing, screening, drainage, and utility connections. b. Manufacturer's specifications for all BESS units, including energy capacity (kWh), chemistry type, Battery Management System description, and UL listing or equivalent certification. c. Documentation of compliance with NFPA 855 (or most current edition), and the International Fire Code, as required by the Fire Marshal. d. Such additional information as may be required by the Building Official or Fire Marshal. 2. Large-Scale BESS, and Large-Scale BESS+. A Large-Scale BESS installation (600 kWh and above), and/or Large-Scale BESS+ installation (1 MWh and above) shall require approval of a Conditional Use Permit (CUP) by City Council in accordance with Section 5.303 (Application Procedures), and Section 5.310 (Conditional Use Permit - CUP), in addition to building and electrical permits issued by the Building Official. The following shall be submitted with the CUP application, in addition to the standard CUP application requirements of Section 5.303 (Application Procedures): a. All materials listed in Sections 3.515.E.(Application Requirements), 1.(Small-Scale BESS), Subsections a through d. b. Fire and Life Safety Plan as required by Section 3.515.G. (Fire and Life Safety). c. Noise assessment as required by Section 3.515.S. (Noise Standards). d. Decommissioning plan as required by Section 3.515.W. (Decommissioning). e. Utility coordination letter from the applicable grid operator or electric utility confirming available interconnection capacity. f. Such additional information as may be required by the Director of Planning and Development Services, Building Official, or Fire Marshal. g. All documents and materials as may be required for Large-Scale BESS+ (1 MWh and above), also referred to as a Battery Energy Storage Facility, pursuant to Texas Utilities Code, Chapter 187 (Battery Energy Storage Facility Safety). h. When an agreement that authorizes a grantee to operate a Large-Scale BESS+ (1 MWh and above), also referred to as a Battery Energy Storage Facility, is required pursuant to Texas Utilities Code, Chapter 303 (Battery Energy Storage Facility Agreements), a copy of said agreement(s) and any supporting materials shall be submitted. 3. Portable BESS. A Portable BESS unit shall require a building permit and electrical permit issued by the Building Official prior to deployment. No Conditional Use Permit (CUP) is required for a Portable BESS deployment whose aggregate capacity on the parcel is less than six hundred (600) kWh. a. Application requirements. The following shall be submitted with the permit application: (1) Site plan depicting the proposed location of all Portable BESS units on the parcel, dimensions, setbacks from all property lines and residential district boundaries, on-site circulation, and utility connections. (2) Manufacturer's specifications for all units to be deployed, including energy capacity (kWh), chemistry type, Battery Management System description, and UL 9540 listing or equivalent certification approved by the Authority Having Jurisdiction. (3) Documentation of compliance with the International Fire Code, NFPA 855, and NFPA 70 as adopted and amended by the City of Mesquite, as required by the Fire Marshal. (4) Anticipated deployment start and end dates, and the total aggregate energy capacity of all Portable BESS units to be deployed on the parcel simultaneously. (5) Emergency and maintenance contact information for the operator and the equipment owner, if different. (6) Such additional information as may be required by the Building Official or Fire Marshal. b. Permit expiration. The building permit shall expire upon the earlier of: (1) the end of the authorized temporary period, including any approved extension under Section 3.515.E.(Application Requirements), 3.(Portable BESS), Subsection d.(Extension); or (2) removal of all units from the site. Submission of the building permit application shall constitute notice to the Fire Marshal for purposes of emergency pre-incident planning, and no separate Fire Marshal notification is required provided the permit is approved and the Fire Marshal has received a copy of the approved permit and site plan no fewer than seventy-two (72) hours prior to deployment. c. Maximum Temporary Period. A Portable BESS unit may remain on a single site for a continuous period not to exceed ninety (90) calendar days from the date of initial deployment as authorized by the building permit. d. Extension. One (1) extension of up to ninety (90) additional calendar days may be granted upon written application to and approval by the Director, or designee. The application shall be submitted no fewer than ten (10) business days prior to expiration of the initial ninety-day period and shall include a written explanation of the operational necessity for the extension and confirmation of continued compliance with all conditions of the original building permit. The Director, or designee, may impose additional conditions on any approved extension. The building permit shall be amended to reflect the approved extension period. e. Reclassification Upon Noncompliance. A Portable BESS unit that exceeds the authorized temporary period without an approved extension, that is affixed to a permanent foundation at any time, or that is used as a permanent rather than temporary power supply shall be immediately reclassified as a Small-Scale BESS, Large-Scale BESS, or Large-Scale BESS+ installation as applicable, and shall be subject to all permitting, development, and operational requirements of this Section 3.515 (Battery Energy Storage Systems - BESS). The operator shall have thirty (30) calendar days from the date of reclassification to obtain all required approvals or remove the unit from the site. F. Consultant Review. 1. Consultant review authorized. The Director, or designee, may authorize review of any CUP application, technical study, proposed finding, or proposed condition of approval by a qualified independent consultant if the Director, or designee, reasonably determines that expert review is necessary to evaluate technical aspects of the application that exceed the routine technical expertise of City staff, or to verify the accuracy and methodology of technical studies submitted by the applicant. 2. Consultant review fees. All actual and reasonable costs of a consultant's technical review authorized under this subsection shall be listed in accordance with Appendix D (Comprehensive Fee Schedule), Article XII, Sec. 12-103 (Consultant Review Fees). 3. Consultant for Large-Scale BESS+ (1 MWh and above). Pursuant to Texas Utilities Code, Chapter 187, § 187.003, or successor, the City may request a Battery Operator, that owns or operates a Battery Energy Storage Facility, to select a consultant, at the Battery Operator's expense, to evaluate the design, safety, and installation of the facility to ensure compliance with the Fire Safety Standards For Battery Energy Storage Facilities, and provide a written report to the City. 4. Consultant review distinguished from Third-Party Review of Development Documents. Consultant review under this subsection is distinguished from Third-Party Review of Development Documents and Inspection of Improvements under Texas Local Government Code, Title 7, Subtitle C, Chapter 247. G. Fire and Life Safety. 1. BESS Installations. All BESS installations shall comply with NFPA 855, the International Fire Code as adopted and amended by the City of Mesquite. 2. Large-Scale BESS+ (1 MWh and above). a. Fire Safety Standards for Battery Energy Storage Facilities. See Texas Utilities Code, Chapter 187, § 187.003, or successor. b. Fire Safety Inspection Report. Pursuant to Texas Utilities Code, Chapter 187, § 187.003, or successor, a Battery Operator, that owns or operates a Battery Energy Storage Facility, shall select a consultant, at the Battery Operator's expense, to provide the City with a Fire Safety Inspection Report at least once every five (5) years. H. Code Compliance. All BESS installations shall comply with the International Building Codes as adopted and amended by the City of Mesquite, the National Electrical Code (NFPA 70), and all applicable manufacturer installation requirements. I. Equipment Certification. All BESS units shall be listed and labeled by a nationally recognized testing laboratory (e.g., UL 9540) and shall have undergone large-scale fire testing in accordance with UL 9540A or an equivalent method approved by the Authority Having Jurisdiction (AHJ). J. Battery Management System. All BESS installations shall be equipped with a Battery Management System (BMS) that continuously monitors cell temperature, voltage, state of charge, and state of health, and that provides audible and visual alarms and automatic shutdown capability upon detection of abnormal conditions. K. Thermal Runaway Protection. All BESS installations shall incorporate thermal runaway propagation prevention (TRPP) measures in accordance with NFPA 855 (or most current edition), including thermal barriers, gas detection, venting provisions, and separation distances between battery modules. L. Fire Detection and Suppression. 1. All BESS enclosures shall be equipped with an automatic early warning fire detection system, including smoke detection, thermal imaging detection, or radiant-energy detection, in accordance with NFPA 72 and NFPA 855. 2. All Large-Scale BESS, and Large-Scale BESS+ installations shall be equipped with an automatic fire suppression system appropriate to the battery chemistry in use, installed in accordance with NFPA 855 and approved by the Authority Having Jurisdiction (AHJ). 3. All fire suppression systems shall be connected to a twenty-four-hour monitored alarm system and shall provide automatic notification to the Mesquite Fire Department. M. Emergency Operations Plan. 1. Permanent BESS. All permanent BESS installations shall have a written Emergency Operations Plan that includes: a. Safe shutdown procedures for emergency responders. b. Thermal runaway response protocols. c. Evacuation procedures for adjacent uses. d. Identification of on-site and off-site water supply sources for fire suppression. e. Emergency contact information for the facility operator. f. Annual coordination with the Mesquite Fire Department, including on-site familiarization training for emergency responders. 2. Large-Scale BESS+ (1MWh and above). Large-Scale BESS+ shall comply with Texas Utilities Code, Chapter 187, § 187.004 (Emergency Operations Plans for Battery Energy Storage Facilities). N. Gas Detection and Ventilation. All BESS enclosures shall be equipped with gas detection systems capable of detecting hydrogen, carbon monoxide, and other gases associated with battery failure. Adequate ventilation shall be provided to prevent accumulation of flammable gases above the lower explosive limit (LEL). O. Electrical Safety. All BESS installations shall be equipped with emergency power-off (EPO) systems accessible to emergency responders, and shall comply with all applicable provisions of the National Electrical Code. P. Setbacks. 1. Small-Scale BESS. Small-Scale BESS installations shall meet the principal structure setback requirements for the district in which they are located. 2. Large-Scale BESS, and Large-Scale BESS+. Large-Scale BESS and Large-Scale BESS+ installations shall comply with the following minimum setbacks, measured from the nearest component of the BESS installation to the nearest property line or feature: a. From any residential district boundary: five hundred (500) feet. b. From any public school, licensed childcare facility, or public park: five hundred (500) feet. c. From any public street right-of-way: one hundred (100) feet. d. From all other property lines: fifty (50) feet. e. Between individual BESS units or enclosures: as required by NFPA 855 and the Authority Having Jurisdiction (AHJ), but not less than ten (10) feet. Q. Portable BESS. Portable BESS units shall not be located within five hundred (500) feet of any residential district boundary, measured from the nearest component of the unit to the nearest such property line. Where a Portable BESS deployment is reclassified as Large-Scale under Section 3.515.D. (Permitted Zoning Districts), 4. (Portable BESS), Subsection b.(Large-Scale Threshold), the setback requirements of Section 3.515.P. (Setbacks), Subsection 2. (Large-Scale BESS, and Large-Scale BESS+), shall apply. R. Setback Modification. Greater setback distances may be required by the City Council as a condition of CUP approval based on site-specific fire risk, proximity to sensitive uses, or other factors identified in the CUP review. S. Noise Standards. 1. BESS installations shall not generate noise exceeding fifty-five (55) dBA measured at the nearest property line of a nonparticipating residential property, or sixty (60) dBA at any other property line. 2. A noise assessment prepared by a qualified acoustical professional shall be submitted with any Large-Scale BESS, and/or Large-Scale BESS+ CUP application, demonstrating compliance with the limits of this Section 3.515 (Battery Energy Storage Systems - BESS) during normal operation. Cooling systems, inverters, and other mechanical equipment shall be included in the assessment. 3. Noise mitigation measures, such as sound barriers or acoustically treated enclosures, shall be incorporated into the installation design where necessary to achieve compliance. 4. City Noise Ordinance. a. Noise from BESS installations shall additionally comply with all applicable provisions of the Mesquite Noise Ordinance, as amended.See Mesquite City Code, Ch. 10, Article III (Noise). In the event of a conflict, the more restrictive standard shall apply. b. Vibrations from BESS installations shall comply with all applicable provisions of the Mesquite City Code, including but not limited to, Ch. 10, Article III (Noise), Sec. 10-71 (Offenses), Subsection (c) (Vibration Offenses); and MZO, Part 1, 1.400, Section 1.407 (Vibration). T. Screening and Fencing. 1. All permanent BESS enclosures and associated equipment shall be screened from public view by masonry walls, solid fencing, landscaping, berming, or a combination thereof. Screening shall be a minimum of one (1) foot taller than the equipment being screened. 2. Perimeter security fencing of a minimum six (6) feet in height shall be provided around all Large-Scale BESS, and Large-Scale BESS+ installations. Fencing materials shall comply with Section 3.514.(Data Centers), J.(Screening and Buffering), 4.(Fencing), Subsection a.(Materials), except that chain-link fencing with privacy slats may be used in interior yards not visible from a public right-of-way. 3. Solid masonry walls in accordance with district screening requirements are required along any property line adjacent to a residential district. 4. Access gates shall be lockable and shall remain locked except during authorized access by operations personnel or emergency responders. Emergency access shall be provided as required by the Fire Marshal. 5. Portable BESS units are exempt from the screening and fencing requirements of this Section 3.515 (Battery Energy Storage Systems - BESS), provided all units remain fully within the interior of the site and are not visible from a public right-of-way. Where a Portable BESS deployment is or becomes visible from a public right-of-way, temporary screening shall be required as a condition of the building permit. U. Lighting. Lighting for BESS installations shall comply with Section 3.514.(Data Centers), K.(Lighting), and Part I, Section 1.408(Glare). Security lighting shall be directed downward and inward to minimize light trespass onto adjacent properties. V. Signage and Hazard Communication. 1. All permanent BESS enclosures and perimeter fencing shall display hazard identification placards in accordance with NFPA 704 and NFPA 855, including identification of battery chemistry, electrical hazard warnings, and emergency contact information. 2. All Portable BESS units shall display hazard identification placards in accordance with NFPA 704 and NFPA 855 on all exterior faces of the unit visible from the site perimeter or from adjacent uses. 3. Signs shall be posted at all access points indicating the presence of high-voltage equipment, battery hazards, and emergency shutdown locations. 4. Hazardous material inventory information shall be maintained on site and provided to the Mesquite Fire Department in accordance with applicable Fire Code requirements. W. Decommissioning. 1. Decommissioning Plan Required. All Small-Scale BESS, Large-Scale BESS, and Large-Scale BESS+ applications shall include a decommissioning plan describing removal of all equipment, recycling or disposal of battery materials in compliance with applicable environmental regulations, and restoration of the site. 2. Disposal of battery modules, electrolytes, and other hazardous components. Battery modules, electrolytes, and other hazardous components shall be disposed of in accordance with applicable federal, state, and local environmental regulations. Documentation of proper disposal shall be maintained on file with the Department of Planning and Development Services. 3. Large-Scale BESS (600 kWh and above), and Large-Scale BESS+ (1 MWh and above). a. Financial Assurance. City Council may, as a condition of CUP approval, require the applicant to provide a performance bond, irrevocable letter of credit, or other financial assurance mechanism acceptable to the City Attorney to guarantee completion of decommissioning obligations for Large-Scale BESS and Large-Scale BESS+ installations. b. Required Agreement Provisions on Facility Removal When a Large-Scale BESS+ (1MWh and above) Operator Utilizes Leased Property for Operations. Large-Scale BESS+ operators leasing property for operations shall comply with Texas Utility Code, Ch. 303 (Battery Energy Storage Facility Agreements), and § 303.0004 (Required Agreement Provisions on Facility Removal). 4. Portable BESS - Removal. Upon removal of a Portable BESS unit from a site, the operator shall confirm in writing to the Building Official within ten (10) business days that all units have been removed and that the site has been restored to its pre-deployment condition. X. Operations and Maintenance. All permanent BESS installations shall be maintained in good working order at all times in accordance with manufacturer requirements and applicable codes. 1. The operator shall conduct and document regular inspections of all BESS components, fire detection and suppression systems, gas detection systems, and electrical systems. Inspection records shall be maintained on site and available for review by the Building Official or Fire Marshal upon request. 2. The Emergency Operations Plan required by Section 3.515.M. (Emergency Operations Plan) shall be reviewed and updated annually and coordinated with the Mesquite Fire Department. 3. Any physical modification that increases the total energy capacity or power rating of a permanent BESS installation shall require re-approval under this Section 3.515 (Battery Energy Storage Systems - BESS). Like-kind replacement of components that does not increase capacity shall not require re-approval but shall be documented and available for inspection. Y. Nonconforming BESS Installations. 1. A BESS installation lawfully established prior to the effective date of the ordinance adding this Section 3.515 (Battery Energy Storage Systems - BESS), or 2. A BESS project vested prior to the effective date of the ordinance adding this Section 3.515 (Battery Energy Storage Systems - BESS), and subsequently lawfully completed within the vesting deadlines, shall be classified as a legal nonconforming installation and shall be subject to the provisions of MZO, Part 1, Section 1.300 (Nonconforming Situations and Amortization of Nonconforming Uses). Any expansion, enlargement, or material modification or change in the operations of a nonconforming BESS installation shall require full compliance with all standards of Section 1.300, and this Section 3.515 (Battery Energy Storage Systems - BESS). Z. Appeals. 1. Appeals to Board of Adjustment. The owner or operator may appeal the director's decision(s) in accordance with MZO, Part 5, 5.200, Section 5.210 (Appeals of Administrative Decisions to Board of Adjustment). See also Appendix D (Comprehensive Fee Schedule), Article XII, Sec. 12-120 (Board of Adjustment Fees), Appeals of Administrative Decisions to the Board of Adjustment. 2. Appeals to the City Council. Appeals to the City Council regarding development documents or development inspections may be made in accordance with MZO, Part 5, 5.100, Section 5.107.P.(Appeals to City Council), and Texas Local Government Code, Chapter 247, Section 247.006 (Appeal) as amended. Development documents and development inspections are defined in MZO, Part 6, 6.100, Section 6.102 (Definitions). See also Appendix D (Comprehensive Fee Schedule), Article XII, Sec. 12-121 (Planning and Zoning Fees), Appeals of Administrative Decisions to the City Council.

(Ord. No. 5259, § 2(Exh. B), 7-20-26)

Ask a question about Mesquite law

Corpus searches the Mesquite sections it holds and shows the ones that match, with their citations. Free, no sign-in.