For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 13-109 — General performance requirements for CBPAs

Code of the City of Alexandria, Virginia (Supp. No. 156: codified through Ordinance No. 5616, adopted January 24, 2026) · Alexandria Zoning Ordinance § 13-109

Corpus is an independent public-information project, not the official City of Alexandria website. Stable reference: corpuslaw.us/code/d6ecb35f-452a-433c-b2c9-1bad2bf2deaa

13-109 - General performance requirements for CBPAs.

The director of T&ES shall approve development, redevelopment, uses, or land-disturbing activities in the CBPA only if it is found that the activity is in compliance with this Article XIII and that the applicant has demonstrated, by a preponderance of the evidence, that the proposed development, redevelopment, use, or land-disturbing activity meets or exceeds the following standards. (A) No more land shall be disturbed than is necessary to provide for the proposed use, development, or redevelopment. (B) Indigenous vegetation shall be preserved to the maximum extent practicable consistent with the use, development, or redevelopment proposed. (C) Development or redevelopment shall minimize impervious cover consistent with the proposed use or development. (D) The proposed development or redevelopment shall comply with section 5-4-1 et seq. of the City Code (erosion and sediment control). (E) All development, redevelopment, and uses disturbing greater than 2,500 square feet shall meet the following storm water quality management performance requirements. For purposes of this section, the following shall be used to define the site area for determining water quality requirements: for projects disturbing less than 50 percent of the tax parcel (or if multiple parcels are involved, the land subject to the application), the disturbed area shall be used as the site area; for projects disturbing greater than or equal to 50 percent of the tax parcel (or if multiple parcels are involved, the land subject to the application), the entire tax parcel shall be used as the site area. (1) The entire water quality volume from the site shall be treated. When the development, redevelopment, or use constitutes disturbing only a small portion of a tax map parcel greater than five acres in size, the director of T&ES may establish criteria for allowing the parcel to be divided into sub-basins. (2) Single-unit residences separately built and disturbing less than one acre and not part of a larger common plan of development or sale, including additions or modifications to existing single-unit detached residential structures are exempt from subsections (4) and (5) below. The Alexandria water quality volume default requirement in subsection (6) still applies. "Single unit residences separately built" shall mean "single family detached residential structures" as used in § 62.1-44.15:34 C.3. (3) In order to protect the quality of state waters located within the City of Alexandria and to control the discharge of stormwater pollutants from regulated activities, the following minimum design criteria and statewide standards for stormwater management, per 9VAC25-875-580 shall be applied. (4) New development. The total phosphorus load of new development projects shall comply with the water quality design criteria requirements in 9VAC25-875-580, as calculated pursuant to this section. (5) Development of prior developed lands: (a) For land-disturbing activities disturbing greater than or equal to one acre that results in no net increase in impervious cover from the pre-development condition, the total phosphorus load shall be reduced at least 20 percent below the pre-development total phosphorus load. (b) For regulated land-disturbing activities disturbing less than one acre that results in no net increase in impervious cover from the pre-development condition, the total phosphorus load shall be reduced at least ten percent below the predevelopment total phosphorus load. (c) For land-disturbing activities that result in a net increase in impervious cover over the pre-development conditions, the design criteria for new development shall be applied to the increased impervious area. Depending on the area of disturbance, the criteria of subsections (a) or (b) above shall be applied to the remainder of the site. (d) In lieu of subsection (c), the total phosphorus load of a linear development project as defined in 9VAC25-875-580 occurring on prior developed lands shall be reduced 20 percent below the predevelopment total phosphorus load. (e) The total phosphorus load shall not be required to be reduced below the applicable standard for new development unless standards applied by other parts of this article require a more stringent standard. (6) For new development and development on prior developed lands in subsections (4) and (5) above, the entire Alexandria water quality volume default from the site shall be treated, or the requirements must be met consistent with section 13-110. (7) Compliance with subsections (4) and (5) above shall be determined using the runoff reduction method and through the use of stormwater BMPs established in 9VAC25-875-590 or found at the Virginia BMP Clearinghouse website, except as may be limited in accordance with policies established by the director of T&ES in accordance with subsection 13-104(C). (8) Compliance with subsections (4) and (5) may be achieved by the applicant in accordance with off-site compliance options in 9VAC25-875-610 under the following circumstances: (a) Less than five acres of land will be disturbed; (b) The post-construction phosphorus control requirement is less than ten pounds per year; or (c) At least 75 percent of the required phosphorus nutrient reductions are achieved on-site. If at least 75 percent of the require phosphorus nutrient reductions cannot be met on-site, and the operator can demonstrate to the satisfaction of the director of T&ES that (i) alternative site designs have been considered that may accommodate on-site best management practices, (ii) on-site best management practices have been considered in alternative site designs to the maximum extent practicable, (iii) appropriate on-site best management practices will be implemented, and (iv) full compliance with post-development nonpoint nutrient runoff compliance requirements cannot practicably be met on-site, then the required phosphorus nutrient reductions may be achieved, in whole or in part, through the use of off-site compliance options. (9) When the requirements of subsections (4) and (5) have otherwise been met, the requirement to treat the entire Alexandria water quality volume default in subsection (6) may be achieved in accordance with alternative stormwater management equivalency options presented in section 13-110. (10) Notwithstanding those exemptions granted under section 13-123, all such land-disturbing activities shall be subject to the design storm and hydrologic methods set out in 9VAC25-875-620, linear development controls in 9VAC25-875-640, and criteria associated with stormwater impoundment structures in 9VAC25-875-650. (11) Notwithstanding the above requirements, any site with (a) an intermittent stream contained within an existing natural channel, or (b) a non-tidal wetland that does not meet the criteria for designation as a resource protection area in section 13-105(B), must meet the following additional water quality performance criteria: (a) Measures must be taken to protect these features from direct stormwater runoff from impervious surfaces and to preserve their water quality functions. (b) A 50-foot wide vegetated area preserved where present, or established where not present, on the outward edge of these features shall be considered a sufficient BMP to meet this standard if the vegetated area is designed to prevent erosion and scouring. (c) The BMP requirement in (b) above may alternatively be met through the use of a smaller vegetated area in combination with equivalent on-site stormwater treatment and/or equivalent off-site options presented in section 13-110 if approved by the director of T&ES. (d) Development, redevelopment, uses, and land-disturbing activities allowed in the vegetated area shall be the same as those allowed in RPAs as described in section 13-107. Delineation of the vegetated area shall be accomplished in the manner prescribed in section 13-106. (e) The director of T&ES may waive the requirements of (b) above if the non-tidal wetland is demonstrated to the director of T&ES's satisfaction that it qualifies as an isolated wetland of minimal ecological value defined in section 13-103(K). (F) All development and redevelopment shall meet the following channel protection and flood protection requirements. Compliance with this section satisfies the stormwater management requirements of section 5-4-7(c)(4) of the City Code (erosion and sediment control): (1) Channel protection. Concentrated stormwater flow shall be released into a stormwater conveyance system and shall meet the criteria of this section, where applicable, from the point of discharge to a point within the limits of analysis in subsection (d). (a) Manmade stormwater conveyance systems. When stormwater from a development is discharged to a manmade stormwater conveyance system, following the land-disturbing activity, either: (i) The manmade stormwater conveyance shall convey the post-development peak flow rate from the two-year 24-hour storm event without causing erosion of the system. Detention of stormwater or downstream improvements may be incorporated into the land-disturbing activity to meet this criterion, at the discretion of the director; or (ii) The peak discharge requirements for concentrated stormwater flow to natural stormwater conveyance systems in subsection (c) shall be met. (b) Restored stormwater conveyance systems. When stormwater from a development is discharged to a restored stormwater conveyance system that has been restored using natural design concepts, following the land-disturbing activity, either: (i) The development shall be consistent, in combination with other stormwater runoff, with the design parameters of the restored stormwater conveyance system that is functioning in accordance with the design objectives; or (ii) The peak discharge requirements for concentrated stormwater flow to natural stormwater conveyance systems in subsection (c) shall be met. (c) Natural stormwater conveyance systems. When stormwater from a development is discharged to a natural stormwater conveyance system the maximum peak flow rate from the one-year 24-hour storm following the land-disturbing activity shall be calculated either: (i) In accordance with the following methodology: Q Developed ≤ I.F. * (Q Pre-developed * RV Pre-developed )/RV Developed Under no condition shall Q Developed be greater than Q Pre-developed nor shall Q Developed be required to be less than that calculated in the equation (Q Forest * RV Forest )/RV Developed ; where I.F (Improvement Factor) equals 0.8 for sites > 1 acre or 0.9 for sites ≤ 1 acre. Q Developed = The allowable peak flow rate of runoff from the developed site. RV Developed = The volume of runoff from the site in the developed condition. Q Pre-developed = The peak flow rate of runoff from the site in the pre-developed condition. RV Pre-developed = The volume of runoff from the site in pre-developed condition. Q Forest = The peak flow rate of runoff from the site in a forested condition. RV Forest = The volume of runoff from the site in a forested condition. (d) Limits of analysis. Unless subsection (c) is utilized to show compliance with the channel protection criteria, stormwater conveyance systems shall be analyzed for compliance with channel protection criteria to a point where either: (i) Based on land area, the site's contributing drainage area is less than or equal to 1.0 percent of the total watershed area; or (ii) Based on peak flow rate, the site's peak flow rate from the one-year 24-hour storm is less than or equal to 1.0 percent of the existing peak flow rate for the one-year 24-hour storm event prior to implementation of any stormwater quantity control measures. (2) Flood protection. Concentrated stormwater flow shall be released into a stormwater conveyance system and shall meet one of the following criteria as demonstrated by the use of acceptable hydrologic and hydraulic methodologies: (a) Concentrated stormwater flow to stormwater conveyance systems that currently do not experience localized flooding during the ten-year 24-hour storm event: (i) The point of discharge releases stormwater into a stormwater conveyance system that, following the land-disturbing activity, confines the post-development peak flow rate from the ten-year 24-hour storm event within the stormwater conveyance system; and (ii) Unless waived under (iv), the post-development peak flow rate for the ten-year 24-hour storm event shall be less than the predevelopment peak flow rate from the ten-year 24-hour storm event. (iii) Detention of stormwater or downstream improvements may be incorporated into the approved land-disturbing activity to meet (i) and (ii), at the discretion of the director of T&ES. (iv) A waiver of the detention requirements and/or the downstream stormwater limits of analysis in subsection (2)(c) may be granted by the director based on factors including, but not limited to, the project's location in the watershed. (b) Concentrated stormwater flow to stormwater conveyance systems that currently experience localized flooding during the ten-year 24-hour storm event: The point of discharge either: (i) Confines the post-development peak flow rate from the ten-year 24-hour storm event within the stormwater conveyance system to avoid the localized flooding. Additional detention of stormwater or downstream improvements may be incorporated into the approved land-disturbing activity to meet this criterion, at the discretion of the director; or (ii) Releases a post-development peak flow rate for the ten-year 24-hour storm event that is less than the pre-development peak flow rate from the ten-year 24-hour storm event. (iii) A waiver of the detention requirement may be granted by the director of T&ES based on factors including, but not limited to, the amount of stormwater runoff generated, the severity of flooding issues in the watershed and/or the lack of adequacy of the existing conveyance system. (c) Limits of analysis. Stormwater conveyance systems shall be analyzed for compliance with flood protection criteria to a point where: (i) The site's contributing drainage area is less than or equal to 1.0 percent of the total watershed area draining to a point of analysis in the downstream stormwater conveyance system; (ii) Based on peak flow rate, the site's peak flow rate from the ten-year 24-hour storm even is less than or equal to 1.0 percent to the existing peak flow rate from the ten-year 24-hour storm event prior to the implementation of any stormwater quantity control measures; or, (iii) The stormwater conveyance system enters a mapped floodplain or other flood-prone area adopted in accordance with section 6-300 et seq. of the City Code. (d) Alternative limits of analysis. If section 13-109(F)(2)(a)(i) and (ii) or 109(F)(2)(b)(ii) are utilized to comply with the flood protection criteria the downstream limit of analysis shall extend to: (i) A point that is at least 150 feet downstream of a point where the receiving pipe or channel is joined by another that has a drainage area that is at least 90 percent of the size of the first drainage area at the point of confluence; or (ii) A point that is at least 150 feet downstream of a point where the drainage area is 360 acres or greater. (3) Increased volumes of sheet flow resulting from pervious or disconnected impervious areas, or from physical spreading of concentrated flow through level spreaders, must be identified and evaluated for potential impacts on down-gradient properties or resources. Increased volumes of sheet flow that will cause or contribute to erosion, sedimentation, or flooding of down gradient properties or resources shall be diverted to a stormwater management facility or a stormwater conveyance system that conveys the runoff without causing down-gradient erosion, sedimentation, or flooding. If all runoff from the site is sheet flow and the conditions of this subsection are met, no further water quantity controls are required. (4) For the purposes of computing pre-development runoff, all pervious lands on the site shall be assumed to be in good hydrologic condition in accordance with the U.S. Department of Agriculture's Natural Resources Conservation Service (NRCS) standards, regardless of conditions existing at the time of computation. Pre-development runoff calculations utilizing other hydrologic conditions may be utilized provided that it is demonstrated to and approved by the director of T&ES that actual site conditions warrant such considerations. (5) Pre-development and post-development runoff characteristics and site hydrology shall be verified by site inspections, topographic surveys, available soil mapping or studies, and calculations consistent with good engineering practices. Guidance provided in the Virginia Stormwater Management Handbook and by the Virginia Stormwater BMP Clearinghouse shall be considered appropriate practices. (6) The director of T&ES may waive thee requirements provided in subsection (2) in cases where stormwater detention would conflict with the city's flood management programs. The waiver may be granted based on factors including, but not limited to, the project's location in the watershed and/or off-site improvement to upgrade the downstream conveyance systems. (7) Post-development concentrated surface waters shall not be discharged on adjoining property, unless an easement expressly authorizing such discharge has been granted by the owner of the affected land. (G) It shall be the responsibility of the owner of any stormwater quality or quantity management facility established to meet the requirements of (E) and (F) above to provide adequate maintenance for proper functioning of the system. The following requirements apply to all existing and future facilities constructed in the city: (1) The owner shall enter into a stormwater BMP maintenance agreement (agreement) with the city that provides all necessary provisions to ensure compliance with this article, to include access for inspections. The agreement shall require the provision of long-term maintenance of stormwater BMPs and provide for inspections. Facility-specific inspection frequency and maintenance requirements shall be set by city policy and procedures. The BMP maintenance agreement shall be set forth in an instrument recorded in the city land records. The stormwater BMP maintenance agreement form will be provided by the director of T&ES in accordance with section 13-104(C). (2) The owner shall prepare and submit inspection and maintenance reports to the city in accordance with city policies and procedures for the specific facility. Inspection and maintenance reports shall be signed by the owner of the facility or an individual acting on the owner's behalf, a registered professional, or a person who holds an appropriate certificate of competence from the board. Such certification shall state that the facility is being adequately maintained as designed. (3) The owner shall provide the city with access to the facility to perform quality assurance inspections and follow up inspections to ensure adequate maintenance has been conducted a minimum of once every five years, or on a more frequent basis at the discretion of the director. If inadequate maintenance is observed by the city, the owner will be notified and an adequate period specified for corrective action. If the corrective action is not performed within the specified time, the city may perform the necessary corrections and bill the property owner. In cases of repeated instances of failure to perform required maintenance, sanctions may be imposed as provided in section 13-126.

Ask a question about Alexandria law

Corpus searches the Alexandria sections it holds and shows the ones that match, with their citations. Free, no sign-in.