§ 34-93 — Small cell wireless facility co-locations within public rights-of-way on third party existing structures
Code of the City of Hampton, Virginia (Supp. No. 32: codified through Ordinance No. 26-0009, adopted June 10, 2026) · Hampton City Code § 34-93
Corpus is an independent public-information project, not the official City of Hampton website. Stable reference: corpuslaw.us/code/924ce0c0-43be-43a8-95c2-949dd3771762
Sec. 34-93. - Small cell wireless facility co-locations within public rights-of-way on third party existing structures.
Applications to co-locate small cell wireless facilities within public rights-of-way on third-party existing structures shall comply with the following requirements: (a) No wireless infrastructure provider shall co-locate a small cell facility in or on any existing structure located within any public rights-of-way without first obtaining a wireless infrastructure permit (WIP) from the department in accordance with this division. (1) Notwithstanding the foregoing, a WIP shall not be required for (i) routine maintenance or (ii) the replacement of wireless facilities or wireless support structures within a six-foot perimeter with wireless facilities or wireless support structures that are substantially similar or the same size or smaller. (b) Application for permit. The department shall establish a standard application form for wireless infrastructure permits under this section. (1) Applicants may submit not more than 35 individual permit requests with each application. (2) Applicants shall deliver applications to the department, together with an application fee. No application shall be reviewed unless and until the application fee has been paid. (3) The application fee shall be $100.00 apiece for each of the first five individual permit requests included with a single application, plus $50.00 apiece for each additional individual permit request above five included with a single application. (c) Materials to be submitted with WIP applications to co-locate small cell wireless facilities within public rights-of-way on third-party existing structures: (1) When filing an application, an applicant shall submit the applicant's name and a valid electronic mail address at which the applicant may be contacted; (2) When filing an application, for each individual permit requested in the application, the applicant shall provide, unless waived or modified by the department: (i) The address and latitude/longitude of the existing structure on which the small cell facility will be co-located and the nearest Land Record Serial Number (LRSN) from the city's Geographic Information System; (ii) The name of the owner of the existing structure and an agreement or other evidence showing the owner has granted permission to the applicant to co-locate on the existing structure, which evidence may include the owner's signature on the application or other documents; (iii) Copies of any approvals for the site granted by a federal agency, including conditions imposed by that agency; (iv) Engineer-certified intermodulation study and other documentation to the extent permitted by law demonstrating that the small cell facility and operation thereof will not interfere with city pre-existing communications facilities; (v) Plans clearly depicting the dimensions and specifications of the small cell facility, including the antennae, base station, and all assorted wireless equipment; (vi) Detailed elevation drawings showing the co-location of the small cell facility, including the base station and all other associated equipment on the existing structure; and (vii) To the extent permitted by law, such additional materials as are listed on the application form established by the department and are reasonably required by the department to determine the approvability of a permit in accordance with this section 34-93. (d) Any application not including the required application fee and all of the information listed in this section may be deemed incomplete by the department. (e) The application review process to co-locate small cell wireless facilities within public rights-of-way on third-party existing structures shall comply with the following requirements: (1) Provided the applicant has and paid the appropriate application fee, within ten (10) days after receipt of an application and a valid electronic mail address for the applicant, the locality shall notify the applicant by electronic mail whether the application is incomplete and specify any missing information; otherwise, the application shall be deemed complete. Any disapproval of the application shall be in writing and accompanied by an explanation for the disapproval. (2) During review of a complete application, the department may request the applicant to provide additional information which is reasonably required to the extent permitted by law to determine the approvability of a permit in accordance with this section. (3) Within sixty (60) days of submittal of a complete application, the department shall, for each individual permit request included in an application: (i) approve the individual permit request; or (ii) deny the individual permit request in writing, including a written explanation of the reason[s] for denial. The department may extend the sixty (60) day period in writing for a period not to exceed an additional thirty (30) days. The application shall be deemed approved if the department fails to act within the greater of the initial sixty (60) days or an extended thirty (30) day period. (f) Standards of review for applications and bases for denial. (1) Upon confirmation that an application is complete, the department shall review the permit requests. No individual permit request included in a complete application shall be denied except for one or more of the following reasons: (i) Lack of conformance with this division, applicable federal and state law, or the City of Hampton Wireless Infrastructure and Small Cell Facility Design Standards; (ii) Material potential interference with other pre-existing communications facilities or with future communications facilities that have already been designed and planned for a specific location or that have been reserved for future public safety communications facilities; (iii) The public safety or other critical public service needs; (iv) Only in the case of an installation on or in publicly owned or publicly controlled property, excluding privately owned structures where the applicant has an agreement for attachment to the structure, aesthetic impact or the absence of all required approvals from all departments, authorities, and agencies with jurisdiction over such property; or (v) Conflict with an applicable local ordinance adopted pursuant to § 15.2-2306, or pursuant to local charter on a historic property that is not eligible for the review process established under 54 U.S.C. § 306108.
(Ord. No. 20-0011, 10-14-20)
Ask a question about Hampton law
Corpus searches the Hampton sections it holds and shows the ones that match, with their citations. Free, no sign-in.
