For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 34-95 — Small cell wireless facilities within public rights-of-way on city-owned existing structures

Code of the City of Hampton, Virginia (Supp. No. 32: codified through Ordinance No. 26-0009, adopted June 10, 2026) · Hampton City Code § 34-95

Corpus is an independent public-information project, not the official City of Hampton website. Stable reference: corpuslaw.us/code/cb299377-d6f1-4073-89c5-7bd5830a99a8

Sec. 34-95. - Small cell wireless facilities within public rights-of-way on city-owned existing structures.

Applications to co-locate small cell wireless facilities within public rights-of-way on city-owned existing structures shall comply with the following requirements: (a) No wireless infrastructure provider shall co-locate a small cell facility in or on any city-owned existing structure located within any public rights-of-way without first obtaining a wireless infrastructure permit (WIP) from the department and a franchise, encroachment or other license agreement in accordance with this division. (1) Notwithstanding the foregoing, a WIP shall not be required for (i) routine maintenance or (ii) the replacement of wireless facilities or wireless support structures within a six-foot perimeter with wireless facilities or wireless support structures that are substantially similar or the same size or smaller. (b) Application for permit. The department shall establish a standard application form for wireless infrastructure permits under this section. (1) Applicants may submit not more than 35 individual permit requests with each application. (2) Applicants shall deliver applications to the department, together with an application fee. No application shall be reviewed unless and until the application fee has been paid. (3) The application fee shall be $100.00 apiece for each of the first five individual permit requests included with a single application, plus $50.00 apiece for each additional individual permit request above five included with a single application. (c) Materials to be submitted with WIP applications to co-locate small cell wireless facilities within public rights-of-way on city-owned existing structures: (1) When filing an application, an applicant shall submit the applicant's name and a valid electronic mail address at which the applicant may be contacted; (2) When filing an application, for each individual permit requested in the application, the applicant shall provide, unless waived or modified by the department: (i) The address and latitude/longitude of the existing structure on which the small cell facility will be co-located and the nearest Land Record Serial Number (LRSN) from the city's Geographic Information System; (ii) Copies of any approvals for the site granted by a federal agency, including conditions imposed by that agency; (iii) Engineer-certified intermodulation study and other documentation to the extent permitted by law demonstrating that the small cell facility and operation thereof will not interfere with city pre-existing communications facilities; (iv) Plans clearly depicting the dimensions and specifications of the small cell facility, including the antennae, base station, and all assorted wireless equipment; (v) Detailed elevation drawings showing the co-location of the small cell facility, including the base station and all other associated equipment on the existing structure; (vi) Upon request from the department, a copy of the franchise, encroachment, or other similar license agreement, from the city council allowing the co-location of small cell facilities upon city-owned existing structures, in accordance with subsection (e) of this section; and (vii) To the extent permitted by law, such additional materials as are listed on the application form established by the department and are reasonably required by the city engineer to determine the approvability of a permit in accordance with this section 34-95. (d) Any application not including the required application fee and all of the information listed in this section may be deemed incomplete by the department. (e) Requirements for a franchise, license, or encroachment agreement: (1) A franchise, license, or encroachment agreement to permit a wireless services provider or a wireless infrastructure provider to attach small cell facilities to city-owned structures shall be negotiated in good faith to arrive at mutually agreeable contract terms and conditions, which may include but shall not be limited to, compliance with the City of Hampton Wireless Infrastructure and Small Cell Facility Design Standards; responsibility for all costs pertaining to the installation, placement, maintenance, replacement or removal of the wireless facility on or from the city-owned existing structure; responsibility for repairing all damage to the city-owned existing structure resulting from the installation, placement, maintenance, replacement or removal of the wireless facility on or from the existing structure, or for paying the cost incurred by the city to repair the city facility; notification requirements prior to commencement of work; bond requirements; and the right of the city to remove any city facility at any time for the protection of the public health, safety or welfare, with or without notice to the owner of the co-located wireless facilities. (2) The rates, terms, and conditions for such agreement shall be just and reasonable, cost-based, nondiscriminatory, and competitively neutral, and shall comply with all applicable state and federal laws. However, rates for attachments to city-owned buildings may be based on fair market value. The annual recurring rate to co-locate a small cell facility on a city-owned utility pole shall not exceed the actual, direct, and reasonable costs related to the wireless services provider's or wireless infrastructure provider's use of space on the utility pole. In any controversy concerning the appropriateness of the rate, the city shall have the burden of proving that the rates are reasonably related to the actual, direct, and reasonable costs incurred for use of space on the utility pole for such period. (3) For utility poles owned by the city that support aerial cables used for video, communications, or electric service, the parties shall comply with the process for make-ready work under 47 U.S.C. § 224 and implementing regulations. The good faith estimate of the City for any make-ready work necessary to enable the utility pole to support the requested co-location shall include pole replacement if necessary. (4) For utility poles owned by the city that do not support aerial cables used for video, communications, or electric service, the city shall provide a good faith estimate for any make-ready work necessary to enable the utility pole to support the requested co-location, including pole replacement, if necessary, within sixty (60) days after receipt of a complete application. Make-ready work, including any pole replacement, shall be completed within sixty (60) days of written acceptance of the good faith estimate by the wireless services provider or a wireless infrastructure provider. (5) The city shall not require more make-ready work than required to meet applicable codes or industry standards. Charges for make-ready work, including any pole replacement, shall not exceed actual costs or the amount charged to other wireless services providers, providers of telecommunications services, and nonpublic providers of cable television and electric services for similar work and shall not include consultants' fees or expenses. (f) The application review process for co-locations of small cell wireless facilities within public rights-of-way on city-owned existing structures shall comply with the following requirements: (1) Provided the applicant has and paid the appropriate application fee, within ten (10) days after receipt of an application and a valid electronic mail address for the applicant, the locality shall notify the applicant by electronic mail whether the application is incomplete and specify any missing information; otherwise, the application shall be deemed complete. Any disapproval of the application shall be in writing and accompanied by an explanation for the disapproval. (2) During review of a complete application, the department may request applicant to provide additional information which is reasonably required to the extent permitted by law to determine the approvability of a permit in accordance with this section 34-95. (3) Within sixty (60) days of submittal of a complete application, the department shall, for each individual permit request included in an application: (i) approve the individual permit request; or (ii) deny the individual permit request in writing, including a written explanation of the reason[s] for denial. The department may extend the sixty (60) day period in writing for a period not to exceed an additional thirty (30) days. The application shall be deemed approved if the department fails to act within the greater of the initial sixty (60) days or an extended thirty (30) day period. (g) Standards of review for applications and bases for denial. (1) Upon confirmation that an application is complete, the department shall review the permit requests. No individual permit request included in a complete application shall be denied except for one or more of the following reasons: (i) Lack of conformance with this division; applicable franchise, encroachment, or other license agreement; applicable federal and state law; or the City of Hampton Wireless Infrastructure and Small Cell Facility Design Standards; (ii) Material potential interference with other pre-existing communications facilities or with future communications facilities that have already been designed and planned for a specific location or that have been reserved for future public safety communications facilities; (iii) The public safety or other critical public service needs; (iv) Only in the case of an installation on or in publicly owned or publicly controlled property, excluding privately owned structures where the applicant has an agreement for attachment to the structure, aesthetic impact or the absence of all required approvals from all departments, authorities, and agencies with jurisdiction over such property; or (v) Conflict with an applicable local ordinance adopted pursuant to § 15.2-2306, or pursuant to local charter on a historic property that is not eligible for the review process established under 54 U.S.C. § 306108.

(Ord. No. 20-0011, 10-14-20)

Ask a question about Hampton law

Corpus searches the Hampton sections it holds and shows the ones that match, with their citations. Free, no sign-in.