§ 34-99 — New structure installations within public rights-of-way; standard process project
Code of the City of Hampton, Virginia (Supp. No. 32: codified through Ordinance No. 26-0009, adopted June 10, 2026) · Hampton City Code § 34-99
Corpus is an independent public-information project, not the official City of Hampton website. Stable reference: corpuslaw.us/code/22108568-1dfe-4be7-9205-0522ec427d3e
Sec. 34-99. - New structure installations within public rights-of-way; standard process project.
Applications to install new structures that meet the definition of a standard process project in public rights-of-way shall comply with the following requirements: (a) No wireless infrastructure provider shall install new structures that meet the definition of standard process project within any public rights-of-way without first obtaining an individual encroachment agreement as set forth in division 1 of this article. Notwithstanding the foregoing, if a franchise, encroachment, or similar license agreement has been approved by the city council pertaining to standard process projects, then the terms and conditions of the franchise or similar license agreement shall govern the review and installation process. (1) If a small cell wireless facility is proposed to be attached to the new structure, then the franchise, encroachment, or similar license agreement shall comply with the requirements of section 34-95(e). (2) If a non-small cell wireless facility is proposed to be attached to the new structure, then the franchise, encroachment, or similar license agreement shall comply with the requirements of section 34-97(e). (b) Application for permit. The department shall establish a standard application form for wireless infrastructure permits under this section. (1) Applicants shall submit one (1) application per proposed new structure location. (2) Applicants shall deliver applications to the department, together with an application fee. No application shall be reviewed unless and until the application fee has been paid. (3) The application fee shall be an initial fee of $500.00 paid at the time of the application submittal. Should the actual direct costs to process the application, including permits and inspections, exceed $500.00, then the applicant shall pay the remaining costs to the city upon written notification by the city. (c) Materials to be submitted with WIP applications to install new structures that meet the definition of standard process project: (1) When filing an application, an applicant shall submit the applicant's name and a valid electronic mail address at which the applicant may be contacted; (2) When filing an application, for each individual permit requested in the application, the applicant shall provide, unless waived or modified by the department: (i) The address and latitude/longitude of the proposed new structure, and the nearest Land Record Serial Number (LRSN) from the City's Geographic Information System; (ii) Plans clearly depicting the dimensions and specifications of the new structure and all wireless facilities to be attached to the new structure, including the antennae, base station, and all assorted wireless equipment. The plans shall depict all materials existing conditions in the vicinity of the new structure, including but not limited to limits of the public right-of-way; all existing public and privately-owned utility and infrastructure improvements, such as water mains, water meters, sanitary sewer, storm sewer, electrical, gas, telecommunications, manholes, stormwater basins, sidewalks, curbs, gutters, street trees, and traffic signal facilities. In addition, the plans shall depict the proposed routing of utilities to the new structure; (iii) Engineer-certified intermodulation study; and other documentation to the extent permitted by law demonstrating that the wireless facilities to be attached to the new structure, and operation thereof, will not interfere with city pre-existing communications facilities; (iv) Detailed elevation drawings, including the materials to be used, showing the new structure and wireless facilities to be attached to the new structure, including the base station and all other associated equipment; (v) A copy of the written notice given to adjacent landowners at least 15 days before the application is submitted, in accordance with any notice requirements the city may prescribe. (vi) Upon request from the department, a copy of the franchise, encroachment, or other similar license agreement, if applicable, from the city council to allowing the installation of new structures in the city right-of-way, in accordance with subsection (a) of this section; and (vii) To the extent permitted by law, such additional materials as are listed on the application form established by the department and are reasonably required by the city engineer to determine the approvability of a permit in accordance with this section 34-99. (d) The application review process for new structures to be installed within public rights-of-way on city-owned existing structures shall comply with the following requirements: (1) Provided the applicant has and paid the appropriate application fee, within ten (10) days after receipt of an application and a valid electronic mail address for the applicant, the locality shall notify the applicant by electronic mail whether the application is incomplete and specify any missing information; otherwise, the application shall be deemed complete. Any disapproval of the application shall be in writing and accompanied by an explanation for the disapproval. If the department is aware of any modifications to the project as described in the application that if made would permit the locality to approve the proposed project, the locality shall identify them in the written statement. (2) During review of a complete application, the department may request the applicant to provide additional information which is reasonably required to the extent permitted by law to determine the approvability of a permit in accordance with this section 34-99. (3) Within ninety (90) days of submittal of a complete application, the Department shall (i) approve the individual permit request; or (ii) deny the individual permit request in writing, including a written explanation of the reason[s] for denial. The ninety (90)-day period may be extended by mutual agreement in writing between the applicant and the department. The application shall be deemed approved if the department fails to act within the greater of the initial ninety (90) days or within any mutually agreed extension thereof. (e) Standards of review for application and bases for denial. (1) Upon confirmation that an application is complete, the department shall review the permit requests. No individual permit request included in a complete application shall be denied except for one or more of the following reasons: (i) Lack of conformance with this division; applicable franchise, encroachment, or other license agreement; applicable federal and state law; or the City of Hampton Wireless Infrastructure and Small Cell Facility Design Standards; (ii) The proposed new structure does not meet the definition of an standard process review project. (iii) The proposed wireless support structure or wireless facilities does not comply with applicable law and the terms of the wireless facilities franchise, encroachment, or other license agreement, if applicable; (iv) The proposed wireless support structure is not reasonably consistent with existing structures and aesthetics, is not in harmony with the surrounding improvements, or does not conceal within the pole all wires and supporting equipment to the greatest extent possible; (v) The proposed wireless support structure or wireless facilities poses a risk to the public safety, including, but not limited to, public travel within the public way; (vi) The proposed wireless support structure or wireless facilities is inconsistent with the city's existing or planned public safety communications system; (vii) Alternative, less impactful locations which reasonably meet the needs of the applicant are available for placement of the wireless facilities intended to be attached to the wireless support structure as allowed by law. (f) Use by city of new structures installed in public rights-of-way. To the extent permitted by law, the City reserves the right to request the placement of city-owned communication and signal wires and other related equipment and facilities on all wireless support structures erected in its public ways, free of cost or expense to the city, provided that the city equipment and facilities do not interfere with the structural integrity of the wireless support structure and do not interfere with the use of the wireless support structure by the owner and other existing users. An applicant's refusal of a request shall not be considered as a factor in the review and approval or denial of a permit application.
(Ord. No. 20-0011, 10-14-20)
Ask a question about Hampton law
Corpus searches the Hampton sections it holds and shows the ones that match, with their citations. Free, no sign-in.
