§ 4.2 — Stormwater management plan; contents of plan. (9VAC25-875-510)
Code of the City of Virginia Beach, Virginia (Supp. No. 170: codified through Ordinance No. 3872, adopted September 1, 2026) · Virginia Beach City Code, App. D, § 4.2
Corpus is an independent public-information project, not the official City of Virginia Beach website. Stable reference: corpuslaw.us/code/347c1502-cfc6-453f-9245-28c1c174fb69
Sec. 4.2. - Stormwater management plan; contents of plan. (9VAC25-875-510)
A. A stormwater management plan shall be developed and submitted to the VESMP administrator. The stormwater management plan shall be implemented as approved or modified by the VESMP administrator and shall be developed in accordance with the following: 1. A stormwater management plan for a land-disturbing activity shall apply the stormwater management technical criteria set forth in this ordinance and Article 4 (9VAC25-875-670 et seq) of Part V of the Regulation to the entire land-disturbing activity. Individual lots in new residential, commercial, or industrial developments, including those developed under subsequent owners, shall not be considered separate land-disturbing activities. 2. A stormwater management plan shall consider all sources of surface runoff and all sources of subsurface and groundwater flows converted to surface runoff. B. A complete stormwater management plan shall include the following elements: 1. Information on the type of and location of stormwater discharges, information on the features to which stormwater is being discharged including surface waters or karst features if present, and predevelopment and post-development drainage areas; 2. Contact information including the name, address, telephone number, and email address of the owner and the tax reference number and parcel number of the property or properties affected; 3. A narrative that includes a description of current site conditions and final site conditions or if allowed by the VESMP Administrator, the information provided and documented during the review process that addresses the current and final site conditions; 4. A general description of the proposed stormwater management facilities and the mechanism through which the facilities will be operated and maintained after construction is complete; 5. Information on the proposed stormwater management facilities, including: (i) detailed narrative on the conversion to a long-term stormwater management facility if the facility was used as a temporary ESC measure; (ii) the type of facilities; (iii) location, including geographic coordinates; (iv) acres treated; and (v) the surface waters or karst features into which the facility will discharge; 6. Hydrologic and hydraulic computations, including runoff characteristics; 7. Documentation and calculations verifying compliance with the water quality and quantity requirements of these regulations; 8. A map of the site that depicts the topography of the site and includes: i. All contributing drainage areas; ii. Existing streams, ponds, culverts, ditches, wetlands, other water bodies, and floodplains; iii. Soil types, geologic formations if karst features are present in the area, forest cover, and other vegetative areas; iv. Current land use including existing structures, roads, and locations of known utilities and easements; v. Sufficient information on adjoining parcels to assess the impacts of stormwater from the site on these parcels; vi. The limits of clearing and grading, and the proposed drainage patterns on the site; vii. Proposed buildings, roads, parking areas, utilities, and stormwater management facilities; and viii. Proposed land use with tabulation of the percentage of surface area to be adapted to various uses, including planned locations of utilities, roads, and easements; ix. All Chesapeake Bay Preservation Area designations of Resource Protection Areas, including variable width buffers; x. All Southern Rivers Watershed buffers and nontidal wetlands, pursuant to Appendix G of the Virginia Beach City Code; and xi. Any other information reasonably necessary for an evaluation of the development activity; 9. If an operator intends to meet the requirements established in 9VAC25-875-540 or 9VAC25-875-600 through the use of off-site compliance options, where applicable, then a letter of availability from the off-site provider must be included; and that a Stormwater Management Facilities Maintenance Agreement acceptable to the City has been recorded and that all necessary easements are in place to access and utilize the Stormwater Management Facility; 10. A maintenance agreement and adequate easements shall be executed and recorded to ensure responsibility for the maintenance of any stormwater management facilities constructed under the requirements of this ordinance, unless exempted from this requirement under section 5.3, and to ensure appropriate access to such facilities for maintenance, inspection and corrective action; 11. If the VESMP Administrator requires payment of a fee with the stormwater management plan submission, the fee and the required fee form in accordance with section 5.9 of this ordinance must have been submitted. C. All final plan elements, specifications, or calculations of the stormwater management plans whose preparation requires a license under Chapter 4 (Code of Virginia § 54.1-400 et seq.) or 22 (Code of Virginia § 54.1-2200 et seq.) of Code of Virginia Title 54.1 shall be appropriately signed and sealed by a professional who is licensed to engage in practice in the Commonwealth of Virginia. Nothing in this subsection shall authorize any person to engage in practice outside his area of professional competence.
(Ord. No. 3784, 9-17-24)
Ask a question about Virginia Beach law
Corpus searches the Virginia Beach sections it holds and shows the ones that match, with their citations. Free, no sign-in.