Sec. 5.1. - Technical criteria for regulated land-disturbing activities.

A. To protect the quality and quantity of state water from the potential harm of unmanaged stormwater runoff resulting from land-disturbing activities, the City hereby adopts the technical criteria for regulated land-disturbing activities set forth in Part V of 9VAC25-875 expressly to include 9VAC25-875-580 water quality design criteria requirements; 9VAC25-875-590 water quality compliance; 9VAC25-875-600 water quantity; 9VAC25-875-610 offsite compliance options; 9VAC25-875-620 design storms and hydrologic methods; 9VAC25-875-630 stormwater harvesting; 9VAC25-875-640 linear development project; and, 9VAC25-875-650 stormwater management impoundment structures or facilities, which shall apply to all land-disturbing activities regulated pursuant to this ordinance except as expressly set forth in subsections B. through E. of this section. B. The Public Works Design Standards Manual (PWDSM), including all future amendments thereto is hereby adopted and incorporated by reference into this Ordinance. C. Design and check storms. In addition to satisfying the criteria of this section, concentrated stormwater flow shall be released into a stormwater conveyance system and shall meet all applicable criteria as outlined in the PWDSM. When a land disturbance projects that increases the impervious area by more than twenty thousand (20,000) square feet the following shall be met: 1. Use EPA SWMM or value enhanced SWMM programs that can directly exchange input data with EPA SWMM for hydraulic calculations; and, 2. Performance upstream and downstream drainage analyses to demonstrate adequacy of the downstream system. D. Design storms and hydrologic methods. 1. Unless otherwise specified, the prescribed design storms are one hundred twenty (120) percent of the one-year, two-year, ten-year, twenty-five-year, fifty-year and one hundred-year twenty-four-hour storms using the rainfall precipitation frequency data recommended by the U.S. National Oceanic and Atmospheric Administration (NOAA) Atlas 14, Volume 2 Version 3.0. Partial duration time series, as adjusted by the City of Virginia Beach Public Works Design Standards Manual, shall be used for the precipitation data. 2. Unless otherwise specified, all hydrologic analyses shall be based on the existing watershed characteristics and how the ultimate development condition of the subject project will be addressed. 3. The U.S. Department of Agriculture's Natural Resources Conservation Service (NRCS) synthetic twenty-four-hour rainfall distribution and models, including, but not limited to TR-55 and TR-20; hydrologic and hydraulic methods developed by the U.S. Army Corps of Engineers; or other standard hydrologic and hydraulic methods, shall be used to conduct the analyses described in this part. Predeveloped vs. post-developed runoff comparisons shall be performed using the same method of analysis. 4. When total proposed (increased) impervious area is greater than twenty thousand (20,000) square feet of new impervious area, the hydrologic methods in the PWDSM shall apply in lieu of subsection C. above. Project shall use EPA SWMM or value exchanged SWMM programs that can directly exchange input data with EPA SWMM for hydrologic and hydraulic calculation E. The entire drainage area must be considered when determining the design storm and hydrologic methods. This includes both onsite and offsite contributing drainage areas. For drainage areas less than three hundred (300) acres, a ten-year, twenty-four-hour design storm event for capacity design shall be used; for drainage areas equal to or greater than three hundred (300) acres, but less than five hundred (500) acres, a twenty-five-year, twenty-four-hour design storm event shall be used; for drainage areas equal to or greater than five hundred (500) acres, a fifty-year, twenty-four-hour design storm event shall be used. E. With regard to water quality compliance calculations the City's Stormwater Drainage Basin boundary shall be used in lieu of the HUC boundaries for pollutant load reduction calculations except in the Lower Southern Rivers drainage basin where HUCs have been combined. F. Any land-disturbing activity shall be considered grandfathered and shall be subject to Article 4 (9VAC25-875-670 et seq) of Part V of the Regulation provided: 1. A proffered or conditional zoning plan, zoning with a plan of development, preliminary or final subdivision plat, preliminary or final site plan, or any document determined by the City to be equivalent thereto: (i) was approved by the City prior to July 1, 2012, (ii) provided a layout as defined in 9VAC25-875-670, (iii) will comply with the technical criteria of Article 4 of Part V of 9VAC25-875, and (iv) has not been subsequently modified or amended in a manner resulting in an increase in the amount of phosphorus leaving each point of discharge, and such that there is no increase in the volume or rate of runoff; 2. A permit has not been issued prior to July 1, 2014; and 3. Land disturbance did not commence prior to July 1, 2014. G. Locality, state, and federal projects shall be considered grandfathered by the City and shall be subject to the technical criteria of Article 4 of Part V of 9VAC25-875 provided: 1. There has been an obligation of locality, state, or federal funding, in whole or in part, prior to July 1, 2012, or the department has approved a stormwater management plan prior to July 1, 2012; 2. A permit has not been issued prior to July 1, 2014; and 3. Land disturbance did not commence prior to July 1, 2014. H. Land-disturbing activities grandfathered under subsections A and B of this section shall remain subject to the technical criteria of Article 4 of Part V of 9VAC25-875-490 et seq. for one additional permit cycle. After such time, portions of the project not under construction shall become subject to any new technical criteria adopted by the board. I. In cases where governmental bonding or public debt financing has been issued for a project prior to July 1, 2012, such project shall be subject to the technical criteria of Article 4 of Part V of 9VAC25-875-490 et seq. J. Nothing in this section shall preclude an operator from constructing to a more stringent standard at its discretion.

(Ord. No. 3784, 9-17-24)

Ask a question about Virginia Beach law