§ 3008 — Erosion Control
Code of Ordinances of the City of Montpelier, Vermont (Codified through Ordinace No. 2026-0413, adopted April 8, 2026. (Supp. No. 2, Update 1)) · Montpelier Code of Ordinances § 3008
Corpus is an independent public-information project, not the official City of Montpelier website. Stable reference: corpuslaw.us/code/ae37c4c8-8d6e-49e0-9bc4-c1961a5b22f7
Section 3008. - Erosion Control
3008.A Purpose. This section is intended to promote construction practices on development and redevelopment sites that limit soil disturbance and compaction, and minimize erosion and sedimentation of downstream water bodies. 3008.B Applicability. The provisions of this section apply to any development that will disturb soil except that: (1) Development that obtains a state construction general or individual permit shall be assumed to have met the requirements of this section. Any zoning permit or approval shall be conditional upon the applicant submitting a copy of the state permit to the Administrative Officer prior to the start of construction. 3008.C Erosion Control Plan Required. Applicants shall submit and implement a professionally prepared erosion control plan for construction activities that exceed the threshold amount(s) of soil disturbance specified in Figure 3-10 in accordance with the Vermont Standards and Specifications for Erosion Prevention and Sediment Control. 3008.D Erosion Control Practices. Construction activities shall be undertaken in accordance with the following practices: (1) Limit the size of the construction area to the minimum necessary to accommodate the proposed development. (2) Preserve significant existing trees within the construction area where possible. (3) Mark site boundaries to identify the limits of construction with flags or fencing. The site boundaries should include storage and access areas. No soil compaction should occur outside the delineated construction area. Trees to be preserved within the construction area should be protected by fencing that at a minimum encloses the area around their drip line. (4) Limit the amount of soil exposed at one time to reduce the potential for erosion by phasing construction. (5) Stabilize and maintain the construction entrance to prevent mud from being tracked onto streets. (6) Install silt fences to intercept runoff and allow suspended sediment to settle out on the downslope side of construction activities and between disturbed soil and any drainage feature, stormwater inlet or water body. (7) Divert any stormwater from upslope areas around the disturbed area with appropriately stabilized berms and ditches to prevent the runoff from picking up sediment. Untreated stormwater and sediment shall not be diverted to neighboring properties, public rights-of-way or water bodies. (8) Treat and filter any water pumped out of the construction area before allowing it to flow off the site or to be discharged to a storm drain or water body. (9) Slow down any concentrated flows of runoff by installing stone check dams in drainage channels. (10) Stabilize exposed soil with seed and mulch or erosion control matting promptly when work in an area is complete. All areas of disturbance should have permanent stabilization within 48 hours of reaching final grade with recognition that this may not be possible in every case, particularly for construction occurring between mid-October and mid-April. (11) Monitor the site to ensure that all sediment and erosion control measures are functioning properly. It is particularly important to check erosion control measures just before and after any significant rainfall. (12) Periodically clean, replace and maintain all sediment and erosion control measures until vegetation is permanently established on all disturbed areas. (13) In order to promote water infiltration and plant health: (a) Any compacted soil should be tilled prior to the final seeding and mulching; and (b) Topsoil removed during construction shall be stockpiled and spread back onto disturbed areas prior to the final seeding and mulching. If the quality of the site's topsoil is inadequate to support appropriate vegetative cover, it does not need to be stockpiled and it may be replaced with better quality soil or, if it is retained, it should be amended as needed. Figure 3-10. Erosion Control Plan Required SLOPE | THRESHOLD FOR ENGINEERED PLAN ≥15% | An erosion control plan is required for development disturbing 8,000 square feet or more of soil on the parcel that is greater than or equal to 15%. ≥30% | An erosion control plan is required for development disturbing any amount of soil on the parcel that is greater than or equal to 30%. See Subsection 3007.D for guidance on measuring slope.
(Ord. No. 2025-275, 7-9-2025)
Ask a question about Montpelier law
Corpus searches the Montpelier sections it holds and shows the ones that match, with their citations. Free, no sign-in.