§ 3009 — Stormwater Management
Code of Ordinances of the City of Montpelier, Vermont (Codified through Ordinace No. 2026-0413, adopted April 8, 2026. (Supp. No. 2, Update 1)) · Montpelier Code of Ordinances § 3009
Corpus is an independent public-information project, not the official City of Montpelier website. Stable reference: corpuslaw.us/code/0e922097-bd5b-4d74-bbbe-f8c5e5483b37
Section 3009. - Stormwater Management
3009.A General Requirements. The following applies to all development requiring stormwater management approval. (1) Storm sewer system and other drainage improvements shall be in accordance with plans approved by the Administrative Officer or Development Review Board, as applicable, following receipt of a recommendation from the Director of Public Works. (2) Connection or increased discharge to any storm-sewer system shall be at the discretion of the Director of Public Works based on the conditions and characteristics of the system in that location. In no case shall stormwater discharge, or development result in an increased discharge, into a city sewer system. 3009.B Management Plan. Unless exempted below, development that creates new or expanded impervious surfaces shall submit a Stormwater Management Plan and receive recommendation from the Director of Public Works for approval or denial of such plan. The Stormwater Management Plan shall demonstrate adequate post-construction stormwater management practices such that the post-construction stormwater peak flow rates from the 25-year storm are less than or equal to the pre-construction condition. All existing facilities for the conveyance of waters, both private and public, which may be affected or impacted by the development shall be identified and analyzed. An historical account of off-site facilities within a drainage area (culverts, ditches and brooks, etc.) may also be required. The plan shall show all natural and constructed drainage ways, both existing and proposed. Development is exempt from this requirement if the development meets the following conditions: (1) The development has or will be obtaining a Department of Environmental Conservation General Permit for Stormwater Discharges or Individual Stormwater Discharge Permit, as applicable; (2) Within a combined sewer area, that the development results in less than 5,000 square feet in total impervious surfaces on the subject parcel; and (3) Outside of combined sewer areas, the development results in less than 10,000 square feet of impervious surfaces on the subject parcel. 3009.C Minimization of Stormwater Runoff. The best available technology shall be used to minimize stormwater runoff, increase on-site infiltration, encourage natural filtration functions, simulate natural drainage systems, and minimize discharge of pollutants to ground and surface water. Best available technology may include measures such as retention basins, recharge trenches, swales, and minimal use of impervious surfaces. (1) Stormwater drainage shall not negatively affect adjacent properties. Low points and standing water should be avoided unless specifically designed as in detention ponds, artificial wetlands, or similar facilities. Failure to maintain natural and engineered on-site systems as part of an approved development shall be considered a violation of the permit. 3009.D Type of Drainage Systems. Natural watercourses and drainage ways shall be incorporated into the design of drainage systems to the fullest extent possible. Where open drainage systems are proposed, minimum grades shall be provided as directed by the Director of Public Works. Closed drainage systems shall be required where directed by the Director of Public Works based upon an evaluation of building densities and drainage conditions. 3009.E Public vs. Private Drainage Systems. Drainage systems associated with public streets shall be located within the street right-of-way or within an easement provided to the city and indicated on the plan. All public drainage systems shall be designed in accordance with the Department of Public Works specifications. Drainage systems on individual parcels shall be privately owned and maintained. 3009.F Responsibility for Downstream/Off-site Drainage. Where anticipated discharge from the development shall overload existing downstream drainage facilities, the Development Review Board shall not approve the development until provision has been made for improvement of the downstream facilities. The Development Review Board may require detention ponds or other measures such that a zero percent increase in drainage flows result from the development. 3009.G Design Calculations. All calculations for the drainage system—including upstream potential discharge, downstream capacity, and requirements for on-site facilities and easement width—shall be based on a 25-year storm or as required by the Director of Public Works.
Ask a question about Montpelier law
Corpus searches the Montpelier sections it holds and shows the ones that match, with their citations. Free, no sign-in.
