§ 19.145.140 — Mitigation plan requirements
Federal Way Revised Code (The Federal Way Revised Code is current through Ordinance 26-1052, passed September 1, 2026.) · Federal Way Revised Code § 19.145.140
Corpus is an independent public-information project, not the official City of Federal Way website. Stable reference: corpuslaw.us/code/2255c454-7a0c-4c27-a24f-18e20960bd6c
19.145.140 Mitigation plan requirements.
When mitigation is required, the applicant shall submit for approval by the city a mitigation plan as a component of the critical area report. The mitigation plan shall include the following as determined to be applicable by the director: (1) Existing conditions and proposed impacts. A description of existing critical area and/or buffer conditions, functions, and values and a description of the anticipated impacts; (2) Proposed mitigation. A description of the proposed mitigation actions and mitigation site selection criteria; (3) Environmental goals and objectives. A description of the goals and objectives of proposed mitigation. The goals and objectives shall be related to the function and values of the impacted critical area and provide an analysis of the likelihood of success of the compensation project; (4) Best available science. A review of the best available science supporting the proposed mitigation and a description of the report author’s experience to date in restoring or creating the type of critical area proposed; (5) Performance standards. A description of specific measurable criteria for evaluating whether the goals and objectives of the mitigation project have been successfully attained and whether the requirements of this chapter have been met; (6) Timing. Mitigation shall be completed concurrently with project construction, unless a phased schedule that assures completion has been approved by the director; (7) Detailed construction plans. Detailed site diagrams, scaled cross-sectional drawings, topographic maps with slope percentage and final grade elevations, and any other drawing appropriate to show construction techniques or anticipated final outcome. The plans shall include specifications and descriptions of the following: (a) Proposed construction sequence, timing, and duration; (b) Grading and excavation details; (c) Erosion and sediment control features; (d) Planting plan specifying plant species, quantities, locations, size, spacing, and density; and (e) Measures to protect and maintain plants until established; (8) Monitoring program. The mitigation plan shall include a program for monitoring construction of the compensation project and for assessing a completed project. A protocol shall be included outlining the schedule for site monitoring and how the monitoring data will be evaluated to determine if the performance standards are being met. A monitoring report shall be submitted as needed to document milestones, success, problems, and contingency actions of the compensation project. The monitoring period shall be five years. The director may require a greater or lesser monitoring period depending on the overall scope of mitigation; (9) Contingency plan. The mitigation plan shall include identification of potential courses of action, and any corrective measures to be taken if monitoring or evaluation indicates project performance standards are not being met; and (10) Financial guarantees. The mitigation plan shall include financial guarantees, if necessary, to ensure that the mitigation plan is fully implemented. Financial guarantees ensuring fulfillment of the compensation project, monitoring program, and any contingency measures shall be posted in accordance with Chapter 19.25 FWRC.
(Ord. No. 15-797, § 22, 6-16-15.)
Ask a question about Federal Way law
Corpus searches the Federal Way sections it holds and shows the ones that match, with their citations. Free, no sign-in.
